Text

.. - _..

_ _ ~. _

MONTHLY NARRATIVE REPORT 0F OPERATING I

AND MAJOR MAINTENANCE EXPERIENCE i

This report describes the operating and major maintenance experience for the month of October 1981.

This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.l.c. of the Technical Specifications.

During the report period the reactor remained in the cold shutdown mode of operation. There were no significant events associated with the operation of the Unit. There was no significant maintenance completed during the month.

t a

i i

i t

i i

l l

l l

t

[

r f

8203290127 811105 i

PDR ADOCK 05000133 R

PDR

3

'o o_

OPERATLNG DATA REPORT DOCKET NO. S0-/33 DATE 18- +- B 8 COhlPLETED llY AW 0Aum TELEPilONE 707/dO-Z787 OPERATING STATUS t Auf $mt b N*'"

I. Unit Name:

UMo ot.hT AY M

2. Reporting Period:

O c 7 o a F_ /2_

/98I

3. Licensed Thermal Power (SIW ):

27O

4. Nameplate Rating (Gross MWe):

5f

5. Design Electrical Rating (Net 51We):

S 5~

6. Maximum Dependable Capacity (Gross MWe):

If

7. Maximum Dependable Capacity (Net MWe):

d3

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. lf Any (Net MWe):

N

10. Reasons For Restrictions,if Any:

AI/M This Month Yr to Date Cumulatise II. Hours In Reporting Period 145~

7 2.96

/f9, 982

12. Number Of flours Reactor Was Critical O

O 9 8. /7 /

13. Reactor Reserve Shutdown flours O

O O

14. Ilours Generator On.Line O

o 97,252.

15. Unit Reserve Shutdown flours O

o O

16. Gross Thermal Energy Generated (MWil)

O O

/f t/8. AS~4

17. Gross Electrical Energy Generated (MWil)

O O

4 739.732

18. Net Electrical Energy Generated (MWil)

-2/e 7/50

4. ff /, 7 /8__
19. Unit Service Factor O

O to. 8 P.

20. Unit Availability Factor O

O 4o.89.

21. Unit Capacity Factor (Using MDC Net)

O O

___ 4.S~./ %

22. Unit Capacity Factor IUsing DER Net)

O O

4 3.? %

23. Unit Forced Outage Rate O

O

/.9/"/.

24. Shutdowns Scheduled Over Nest 6 Months (Type.Date and Duration of Eacht:

Nb

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COM%IERCIAL OPER ATION (9/77 )

2 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

.5'o -/3 3 UNIT NAME I-ISPP 23 -

DATE

    1. Si REPORT MONT11 Oc-r / f av COMPLETED BY
f. W. deo.s TELEPflONE '7o7./4(3-27 87 "i

e e.

5a 5 '1, Cause & Corrective

.E _e g

m.5 X Licensee 5v.

c' No.

Date g

gg yg5 Event u?

E.3 Action to

$E 5

jdy Repori a N0

[U Prevent Recurrence 74 - 4 740?ot

.S

~2 4 S~

C. H I

W/A Seggm,q A

I 2

3 4

F: Forced Reason:

Method:

Exhibit G Instructions t

S: Scheduled A Equipment Failure (Explair.)

1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scrarn.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File INUREG-D Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & License Examination F Administrative 5

G. Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il Other (Explain)

~

,'a $...

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. /.3.3 UNIT H8PP *3 DATE

/ / a/

CO\\fPLETED BY A w. RA vu TELEPilONE 707-if 3-27d7 MONT11 OCT l 9 8I DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Neti (MWe-Net t O

o i

i, 2

18 3

39 4

20 5

21 6

22 7

23 8

21 9

25 10 26 II 27 I2 28 I3 29 I4 30 15 31 IF Y

16 INSTRUCTIONS On this format, hst the average daily unit power lesel in MWe Net for each day in the reportine m.mih. Compute to the nearest whole megawatt.

(9/77 )

.