ML20049J823

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1981
ML20049J823
Person / Time
Site: Humboldt Bay
Issue date: 07/01/1981
From: Baum P
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20049J820 List:
References
NUDOCS 8203290125
Download: ML20049J823 (4)


Text

MONTHLY NARRATIVE OF AND MAJOR OPERATINGREPORT month ofreport describes th MAINTENANCE EXPERI This the CE is submitted June 1981 e

operating and major Specifications accordance in This with Section IX:Ireport was pr During the experience of operation. port period

.l.c. ofy the Plant Staff re the Technical operation There the 6

of were reactor during the the Unit.

no remained month.

There wsignificant eventsin the as no associated with significant maint mods enance the completed 1

R

[

t l

OPERATING DATA REPORT DOCKET NO. b -/33 DATE 7- /- 51 COMPLETED BY 19).GAvs\\

TELEPlf 0NE 709 2787 OPERATING STATUS

1. Unit Name:
  • 447 bM bM b47 d4 #7 3 Nas
2. Reporting Period:

A 4 E.

I98L

3. Licensed Thermal Pow r (MWil:
2. 2 o
4. Nameplate Rating (Gross MWe):

If

5. Design Electrical Rating (Net MWef:

S 5~

6. Muimum Dependable Capacity (Gross MWe): - ST
7. Maximum Dependable Capacity (Net MWe):

43

8. If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report Give HIA
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions. If Any:

N /4

- AJ /A This Month Yr..to Date Cumulative II. Ilours In Reporting Period 720 0 43

_/f7, O'49

12. Number Of flours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0

14. Hours Generator On Line I

- 9 8. / 7 /

O

15. Unit Reserve Shutdown Hours 9 7. ZS 2. _
16. Gross Thermal Energy Generated (MWH) o
17. Gross Electrical Energy Generated (MWH)

/S~ 4/B 4r4 Y

V

18. Net Electrical Energy Generated (MWH)

- 209 4, 0.31 ').32

19. Unit Service Factor

-// 5 #

_ 4.r4 7..res-O o

20. Unit Availability Factor 6/.9 9.
21. Unit Capacity Factor (Using MDC Nerl t/.9 9
22. Unit Capacity Factor (Using DER Neti 4 f 9 9.
44. T 9.
23. Unit Forced Outage Rate Y

V

24. Shutdowns Scheduled Over Next 6 Months (Type, Date.:nd Duration of Each t:
l. 9 / 5.
25. If Shut Down At Eed Of Report Period.Estima:ed Date of Startup: - / M D E 7dM! M 1A1A T C
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICA LITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (4/77)

e

~

o UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

B-W

' UNIT NAME M ef "3 DATE 7 - /- e r t:

REPORT MONTH 'Jun L COMPLETED BY P d 6*vm l5 TELEPMONE 7

  • 7 - + +3 -17 81

\\'

s-g f '

-M s

4 w2

__5" c

r.

E _::

g sX Liccasce Sv.

No.

Date g

g ij

,gg5 Event ue g.,

Cause & Currective o

o3 Action to cs E 5

jgg Report

  • AG gu Prevent Recurrence u

O 76-4 7d ovot 5

7to C. H I

N/A r e.is m,c m % gg %g f

I

'4 g

e s.

l 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions i

S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling

3. Automatic Scram.

Event Repor (LER) File (NUREG-D. Regulatory Restriction 4 Other (Explain) 0161)

E.Operatur Training & License Examination l

F-Administrative 5

t G-Operational Error (Explain)

Eshibit I - Same Source i

(9/77) li Other (Explain) fr

A VER AGE DAILY UNITPOW ER LEVEL 1

DOCKET NO.

4 UNIT,

DATE 1 COMPLETED MONTH M y E TELEPHON DY A

A VERAGE DAILY POWER LE (MWe Net)

VEL i

O DAY AVERAGE DAIL 2

(MWe Nett VE.

3 17

,,,0 4

18 19 20 6

3 7

  • g

' ~ ~ ~ - - -

22 9

23 10 24 11 gy b

13 27 14 28 Is 29 16 INSTRUCTIONS On this format, list the aver the nearest whole rneg age daily u it power leveli M n

awatt.

n We Net for each dayin th e reporting month. Comput e to (9/77) e