ML20049J808

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1981
ML20049J808
Person / Time
Site: Humboldt Bay
Issue date: 05/06/1981
From: Baum P
PACIFIC GAS & ELECTRIC CO.
To:
Shared Package
ML20049J803 List:
References
NUDOCS 8203290113
Download: ML20049J808 (4)


Text

  • .

MONTill,Y NAltitATIVE ItEPOIIT OF OPEltATING AND MAJ0lt MAINTENANCE EXPEltIENCE This report describes the operating and major maintenance experience for the month of April 1981.

This report was prepared by the Plant Staff and is submitted in accordance with Section IX:I.1.c. of the Technical Specifications.

During the report period the reactor remained in the cold shutdown mode of operation.

There were no significant events associated with the operation of the Unit.

There was no significant maintenance completed during the month.

8203290113 810506 PDR ADOCK 05000133 p

PDR

.i

~

P l

OPERATING DATA REPORT DOCKET NO. D -/33 DATE 5 8/

COMPLETED BY #w.64 vin TELEPHONE 7o7-H3-14 87 OPERATING STATUS M M ot h 'r A A Y h a stf b d aseT 3 Notes

1. Unit Name:
2. Reporting Period:

284iL I9 8l

3. Licensed Thermal Power (MWt):

Z20

4. Nameplate Rating (Grou MWe):

6f

5. Design Electrical Rating (Net MWe):

SI

6. Maxh.um Dependable Capacity (Gross MWe):

df

7. Maximbm Dependable Capacity (Net MWe):

A3

8. If Changes Occur in Capacity Ratings (Items Numbef3 Through 7) Since Last Report, Give Reasons:

ll/A We A

9. Power Level To Which Restricted,if Any (Net A/ M ):
10. Reasons For Restrictions. lf Any:

This Month Yr. to-Date Cumulative

!!. Hours in Reporting Period 7 I 'I ZB99

/4"S~.5"70

12. Number Of Hours Reactor Was Critical O

O 98, /1/

13. Reactor Reserve Shutdown Hours O

I4. Hours Generator On Line 9 9, 2 J ~.7.

15. Unit Reserve Shutdown Hours O
16. Gross Thermal Energy Generated (MWH)

/5' S/8. Ed

17. Gross Electrical Energy Generated (MWH)

P V

4, 73 7. 73 Z.

18. Net Electrical Energy Generated (MWH)

-ZZ?

- 1 7.4 4.5-47.,94 19. Unit Service Factor O

O 42.S 7,

20. Unit Availability Factor dl. S~7.
21. Unit Capacity Factor (Using MDC Net) 4 4.3 7.
22. Unit Capacity Factor (Using DER Net) 4 4.9 9
23. Unit Forced Outage Rate V

V I. 9 I Ia

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eachl:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:

/ED erum swv-e

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCI AL OPER ATION (9/77)

e

\\

e I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

To -/ 33 UNIT NAME N d F# " 3 DATE 8 e/

REPORT MONT11 A ea it.

MMPLETED BY A W he TELEPHONE 7 7 - +44 -to a1 E

E

.! ?

}

_ Y5 Licensee E

$"1 Cause & Corrective No.

Date g

3g jg5 Event u?

o.

Action to

$E 5

{"IX g Report,

  1. 0 ju Prevent Recurrence d

76-6 740707.

.5

'7 l 'i C, H l

N/4 SA:smic N.yg.cw,,yg, i

1 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions s

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Auto natic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 4-Ot her ( Explain) 0161)

E Operator Training & Ucense Examination F-Administ rative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77)

Il-Other (Explain)

I

--m.

._m_

., =

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 80 -/ U UNIT NdM d

DATE

.r-4-e/

COMPLETED BY Mi d bAM TELEPHONE 7*7-M3-M d7 MONTH bEdIk lM 8 I DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)

(MWe-Ned l

C 37 o

2 gg 3

19 4

20 5

21 6

22 7

23 8

24 9

25 10 26 II 27 12 28 I3 29 14 30

%I 15 3g 16 if t

INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/771

- __