Text
.
f.**%
CCHT S 2 00y '
fpRR,VITH f
p
, !i-Eg
"^n NUCLEAR REGULAT06COMMflSION 3
,, i REGION ll
%, * *O[/
I 101 MARIETTA ST., N.W., SUITE 3100 o
ATLANTA, GEORGIA 30303 MAR 101982 Report No. 70-1201/82-03 Docket No. 70-1201 License No. SNM-1168 Safeguards Group No. III Licensee: Babcock and Wilcox Company Commercial Nuclear Fuel Plant Lynchburg, VA 24505 Date of Inspection:
February 8-12, 1982 Type of Inspection:
Unannounced Material Control and Accountability Inspectors:f,.M.
_J 8 7-J Bates, Senior Safeguards Chemist
'Dath Signed Or %W 3/g/go J.W. Sabados, Safeguards Chemist
'Date Signed Approved by:
D
- M o w.,
3/M82 E. J. M6 Alpine, Chie'f, Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected: Measurements, measurement control
- program, independent inspection effort and follow-up on previously identified findings.
The inspection involved 68 inspector hours by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the four areas examined during the inspection.
S-F2_ M - 41 Cory 8 of T Copies
_ /o Pages Thic Eocument in not to to reproduced withcut specific approval of IE:II m
MTNX IRANSMITTED HEREWITH CONIAIRS 2.790(d) SAFEGUARDS IfiFORil.Ali0fl 8203190401 82031o PDR ADOCK 07002201 C