Lists Major Exhibits Applicant Plans to Introduce During Hearing on Joint Intervenors Evacuation Contention 17/26(1). Replacement State Emergency Plan Will Be Submitted in Next Wk.Svc List Encl
ML20049J663
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/09/1982
From: Churchill B
LOUISIANA POWER & LIGHT CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Sherwin Turk
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
References
NUDOCS 8203190105
Download: ML20049J663 (4)


Text

- .

s

  • i i

m .-

SHAW, PITTMAN, PoTTs & TROWBRIDGE a800 M STRE CT, N. W.

WASHINGTON. D. C. 20036 RAMSAv D POTTS MARM AuGEisetsCM RosERT a RossrNS soNNit S GOTTLif e CTEvART L Pf?TMAN E RNEST L. BLAME. JR 4202 822-e000 STEVEN M. LUCAS MOwARD M. SMAFFE RM AN r E r RGE F TRO*sRiDGE CARLETON S JONES DAsiD M. RusENSTEIN DESCRAM S. SAUSER LTE L MEN D POTTS TMOM AS A. m AeTE R - LYNN WMITTLESEY WILSON SCOTT A. ANENBERG t EIALD CHARNOFF JAMES M. BURGER M ATI AS F. TRAveESO-DI A2 SETM M MOOGA$iAN PMsLLeP D BOSTWsCM SMELDON J WEISEL TELECOPiER veCTORiA J. PERMINS SMCtLA McC. MARvEY 0 TsMOTHY MANLON JOMN A McCULLouGM 12021 822 eO99 & 822 a 99 JOHN M O NERL. JR DELISSA A RIDGwAY GEORGE M ROGE RS. JR J PATRICM MICREY J AY A E PSTIE N RENNETM J. MAUTM AN F; ED A LITTL E GEORGER McCMAE LY. JR _ RAND L. ALLEN DAVID LAWRENCE MILLER JCMN e RMiNELANDER J AMES TMOMAS LENMART TIMOTMY a McBRICE ANNE M. M RAUSMOPF COuCE w CMURCM'LL STEvCN L. MELTZER TELEX EUSABETM M. PENDLETON FREDERICM L. MLEON LECLet A NsCMOLSON. JR DEAN O AWLICM PAUL A. MAPLAN GORDON R. MANOFSKY M.L T N D MRALL JOMN ENGCL so-2es3 ISMAwLAw WSM' MARRY M GLASSpiEGEL , ,, SALLY C. ANDREwS DC M ARD J M E NDALL CMARLES e TEMMIN cAggg..gnawgawa TMOM AS M. McCORMICM JEFFRCY $ GIANCOLA J tY E. SiLgE RG STE PMEN S M UTTL E R WILLIAM P. S ARR M ANN Ah E. M LIE BE RMAN BAR ARA M ROSSCTTs WINTMROP N. brown - SUSAN M FREUND ' SANDRA E. FOLSvM E D DRASN R RA DAL G ME L WRITER S DIRECT DIAL NUMBER P LP A EY JyD MA S ND E BE RT E. ZAMLE R ROBERT M. GORDON

  • EDWARD D. YOUNG. Hf
2. KE AN NLY,E L Pw RC E sS.TE R RO,eMARD E. GALEA N Am Eo. JR R (202) 822-1051 =^R=AR^ s. MORGEg gyEupgE March 9, 1982 J^ .

y

$\ q' N' /

Q  ?

?/ :Gt s/  % ,'Jeh.)

^ - -

Sherwin E. Turk, Esq. ~

jfq 4 Office of the Executive ~ tri

. O /9g 1 Legal Director U.S.' Nuclear Regulatory Commission D G$fpDiT.M [#E Washington, D.C. 20555  %/

4 Re: Louisiana Power & Light Co.

(Waterford Steam Electric Station, Unit 3), Docket No. 50-382

Dear Shep:

The major exhibits Applicant plans to introduce during the Waterford 3 operating license hearing related to Joint Intervenors' evacuation Contention 17/26 (1) consist of the Applicant's onsite emergency preparedness plan, the State of Louisiana's offsite emergency preparedness plan, the evacuation time estimate study, and a study of the fixed outdoor siren system. An identification and description of the latest versions of these documents, all of which have previously been provided to you and the Joint Intervenors, are as follows:

1. The onsite plan, contained in a large white loose leaf binder, is entitled, " Emergency Plan, Louisiana Power & Light, Waterford 3 Steam Electric Station." It was prepared by Applicant, and replaces Section 13.3 of the FSAR. Each page of.the body of the onsite plan is marked " Revision 3."
2. The offsite plan, prepared by-the Louisiana Nuclear Ener'gy Division (a division of the Louisiana Department of Natural g63 .5

/ /

8203190105 820309 PDR ADOCK 05000382 0 PDR

\

  • s SHAW, PITTMAN, POTTS & TROWB RIDGE .

Sherwin E. Turk, Esq.

Page Two March 9, 1982 Resources, Office of Environmental Affairs) is physically in the form of two documents. The first, entitled " State of Louisiana, Peacetime Radiological Response Plan, Annex J, Appendix 7 to Louisiana Preparedness Plan fcr Emergency Operations," Revision 4, February 1982, deals with the organization and functions of state agencies. For convenience, this document can be referred to as the " State Plan." The second document is Attachment 1 to the State Plan, and is designated as Revision 3, September 1981.

It is site-specific for Waterford 3 and contains plans relating specifically to St. Charles Parish and St. John the Baptist Parish.

These two documents are designated to be attached to'Appli-cant's onsite plan as Appendix D and C, respectively. However, because of their bulk, they will be introduced at the hearing as physically separate documents.

The State Plan and Attachment 1 to the State Plan were sub-mitted by the Louisiana Nuclear Energy Division to FEMA for review on November 16, 1981. Each was designated Revision 3, September

, 1981. As a result of that review, certain revisions were made to the State Plan (but not Attachment 1). Although the revised State Plan is the only one that was submitted formally on the NRC docket, I had informally sent to you and the Joint Intervenors the-earlier version last December before it was revised. There was nothing on the face of the revised document to indicate that it was revised.

To assist in you'r review, I sent to both you and Joint Intervenors a specially marked copy of the State Plan which indicates--by -

carets, underlinings, and vertical lines--where all of the revisions have been made. However, to alleviate any confusion that may arise, I have called the Louisiana Nuclear Energy Division and suggested that a new cover page be prepared to designate the revised version as Revision 4, February 1982, and, further, that the revised version which will be introduced as an exhibit at the hearing be the one you have which is marked to indicate all revisions.

Accordingly, we will, this week, formally submit on the docket a replacement State Plan so dated and marked. Since you and Joint Intervenors already have the marked version, it will not affect your review, but I think our filing the replacement formally on the docket will avoid confusion on the hearing record.

I have enclosed at your request four such marked versions of the revised State Plan for' your immediate use. (I am also enclosing a copy of the cover letter by which we earlier transmitted to FEMA, at your request, copies of our exhibits.)

SHAW, PITTMAN, POTTS & TROWBRIDGE -

Sherwin E. Turk, Esq.

Page Three i March 9, 1982

3. The updated evacuation time estimate study is entitled,

" Evacuation Time Estimate by Louisiana Power & Light Company,"

Revision 1, February 1982.

4. The siren study we will be introducing is entitled,

" Report--Verification of the Siren' Alert System for Waterford 3 Nuclear Power Station," February 1982, Revised.

Sincerely yo rs, Bruce W. Churchill 4

Enclosures cc: Service List (w/o encls.)

e 4

e

{ -

l l

w - . . - - - . - -

---g .

a = .

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION <

Before the Atomic Safety and Licensing Board In the Matter of )

)

LOUISIANA POWER & LIGHT COMPANY ) Docket No. 50-382

) *

(Waterford Steam Electric )

-- Station, Unit 3) )

SERVICE LIST Sheldon J. Wolfe, Esquire Lyman L. Jones, Jr., Esquire Administrative Judge Post Office Box 9216 Chairman, Atomic Safety and Metairie, LA 70055 Licensing Board .

U.S. Nuclear Regulatory Luke B. Fontana, Esquire Commission 824 Esplanade Avenue Washington, D.C. 20555 New Orleans, LA 70116-Dr. Harry Foreman Atomic Safety and Licensing Administrative Judge Board Panel Director, Center for U.S. Nuclear Regulatory  :

Population Studies Commission Box 395, Mayo Washington, D.C. 20555 University of Minnesota Minneapolis, MN 55455 Atomic Safety and Licensing Appeal Board Panel Dr. Walter H. Jordan U.S. Nuclear Regulatory Administrative Judge Commission 881 West Outer Drive Washington, D.C. 20555 Oak Ridge, TN 37830 Docketing & Service Section (3)

Sherwin E. Turk, Esquire (4) Office of the Secretary Office of the Executive U.S. Nuclear Regulatory Legal Director Commission U.S. Nuclear Regulatory Washington, D.C. 20555 Commission .

Washington, D.C. 20555

%