ML20049J394
| ML20049J394 | |
| Person / Time | |
|---|---|
| Site: | 07001703 |
| Issue date: | 02/25/1982 |
| From: | Harter E EASTMAN KODAK CO. |
| To: | Soong A NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| 20341, NUDOCS 8203180076 | |
| Download: ML20049J394 (2) | |
Text
"? c - l 9 a 2 m
r_,3--,
f
(* d
( 11
( q' l 39bss LLi wnA Q
g February 25, 1982 Cn 9
W
-p
~
g\\
Q
~
U. S. Nuclear Regulatory Commission gp3 7'g/
Uranium Process Licensing Section g,s.
-s*
/
Uranium Fuel Licensing Branch W'"S
/
Division of Fuel Cycle and Material Safety 4
- d '#
S 7j Washington, D. C.
20555 4gg g j, '
s Attn.
An-Liang Soong, Ph.D.
g\\f Q,'
x/
Dear Dr. Soong:
j,' f
'S
~:
v, Enclosed are 10 copies of page "16A" for our application for
_,,,,j ~
renewaloflicense#SNM-1513(revisiondateofJanuary(2,1,1982).
;0" This page should be inserted between existing pages 16 had 17.
l fy s
The information on this page is identical to that included',in ~.
our application of March 31, 1981, but was inadvertently %mitted
.'S s
s
?
f rom the January 1982 revision.
-j Thank you for your cooperation.
Very truly yours, f
rSh E. Scott Harter a
~
O Q
Radiation Safety Officer 00CKETE3 g
ESH:bwd USNRc r
cc:
T. Ely, M. D.
j_
y4g 0 ISO 2 > '
C. Oster
-1 R. Scherbergerr 4
" 30 D. Vanas 9
- SECD01 W WET Citgg S
Q _,_,
FEE EXEMPT zom EASTMAN KODAK COMPANY 1669 LAKE AVE. ROCHESTER NEW YORK 14650 716 458-1000 8203180076 820225 PDR ADOCK 07001703 PDR
G 6.0 Operating Procedures 6.1 Review and Approval of Procedures for Experiments The CFX has been approved by the Eastman Kodak Radiation Protection Committee for neutron activation and neutron radio-graphic use by established procedures.
Radiation surveys of the area are made under the direction of the Radiation Safety Super-visor to determine that radiation doses are below regulatory limits for all anticipated modes of operation.
Any departure from established procedure which is likely to increase radiation levels in areas occupied by personnel must be reviewed and approved by the Radiation Protection Committee before such changes are made.
The operation of the CFX facility will be the responsibility of the Group Leader in charge of neutron activation analysis and in his absence the Acting Group Leader. The operations associated with neutron activation analysis will be carried out entirely by these two people and the technicians assigned to the neutron activation area.
Neutron radiography work may involve people from other divisions of the Research Laboratories in setting up the experiments.
Such people will be permitted to enter the radiation cavity only on approval of the Group Leader in charge and when accompanied by him or by one of the technicians assigned to the neutron ac_tivation area who will be responsible for oper-(.
ation of the CFX.
6.2 Control of Access to the Radiation Cavity only people whose names are on the authorized list for entry into the radiation cavity will be permitted to enter without special permission of the Group Leader in charge of operations.
The list of authorized names has been prepared and listed under Section A1.1.
l l
Persons who are not on the authorized list to enter the radiation cavity must obtain permission to do so from the Group Leader in charge and must be accompanied to the cavity by a person on the authorized list.
If the Group Leader in charge is not available to give permission for entry, then permission can be obtained from the Radiation Safety Supervisor, the Lab Head in charge of the area or from the Director of the Analytical Sciences Division.
In any of these cases, before granting permission, the i
person responsible will first determine the status of operations in the cavity.
i The gate to the radiation cavity is normally locked.
Access l
to the cavity may be obtained by personnel on the approved list i
by taking the following steps.
1.
Obtain from the Group Leader in charge the key to the locked drawer (Limited Access Drawer) in the control room in which the Master Key for the Kirk interlock system is kept when 1
(
-16A-
.