f BOSTON EDISON C OM0BANY moo Bavterou Breast BOSTON. MAssACHustTTs 02199 March 2, 1982 BEcoMdB2-74
?
/,+
e'/
y
.y a Mr Domenic B. Vassallo, Chief Operating Reactors Branch #2 93 e g !.1 RQg.naw2 1
Division of Licensing 4
J6u Office of Nuclear Reactor Regulation
% 'V d' i
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 f) p License No. DPR-35 Docket No. 50-293 Response to Request for Additional Information Covering Environmental Qualification
Reference:
(a.) T.A. Ippolito's letter to A.V. Morisi, dated 1/18/82
Dear Sir:
Reference (a.) requested. Boston Edison Company to provide certain documents from our EQ central file to Franklin Research Center (FRC) in order that FRC can complete their review of Boston Edison's response to the NRC Safety Evaluation Report.
Boston Edison is providing the documents listed in Attachment 1, which are the requested documents, with the following exceptions:
- 1. Some of the documents are proprietary to the manufacturer and Boston Edison does not have the authority to send the documents to Franklin Research Center.
The documents in this category are listed in Attach-ment 2.
Copies of these documents are on file and are available for review at our Boston office.
- 2. Some of the documents have been superseded as a result of Boston Edison's t.ontinuing search for qualitication documentation. Therefore, because these documents are no longer valid we have not included them. The docu-j ments in this category are listed in Attachment 3.
fj)N S
- 3. Reference (a.) lists Wyle QSR-17746-2 as being in section "0".
This is incorrect. The correct reference is Wyle Report 17446-2 located under section / //
"G".
- 4. Reference (a.) lists under section "J", G-HK-9-92 dated 6/5/79. The correct reference is G-HK-9-72, dated 6/5/79.
It should be noted that the Wyle Reports Series 17446 w re prepared in the fall of 1980 and most of the aging information has since bet' t;perseded by Wyle 8203120330 820302 PDR ADOCK 05000293 p
CD2 TON EDIEDN COMPANY Mr. Domenic B. Vassallo, Chief March 2, 1982 Page 2 Reports Series 17536, which take into consideration the drywell temperatures experienced at Pilgrim Station.
It should also be noted that Boston Edison is currently reviewing and updating i
the Equipment Qualification Evaluation Sheets (EQESs) and will shortly be up-l dating the computer printout (Section 5.0.of Attachment 1 to Boston Edison Letters81-213 and 82-40) including the " Supporting Documents" Section. Any new documents will be supplied if requested.
Very truly yours,
~~
,/
s cc: Mr. Cyril J. Crane Franklin Reasearch Center r-The Parkway at Twentieth Street Philadelphia, PA 19103 i
I I
.i.
-... - -, -.. -. _. - ~.. - _ _.. - -.. - -.. -... ~.,. _ _., - - -... - -, -
p,
- w. ci,.
/
Pg 1 of 2 ITEM #FROM DOCUMENT RFI-C5257-489
\\
1.
Okonite letter 4/9/80 A
2.
Okonite Engineering Report No. 127 B
3.
Cutler Hammer letter to BPCo, 5-23-79 E
4.
Wyle Report number 43854-1 G
5.
Wyle Report number 17446-2 G
6.
Wyle Report number 17446-4 G
7.
Wyle Report number 17446-5 G
8.
Wyle Report number 17446-9 G
9.
Wyle Report number 17446-7 G
- 10. Wyle Report number 17446-8 G
- 11. Wyle Report number 17446-11 G
- 12. Wyle Report number 17446-12 G
- 13. Wyle Report number 17446-1 G
- 14. Wyle Report number 17446-3A G
- 15. Wyle Report number 17446-3B G
- 16. Limitorque TWX to BPCo., 5-17-79 g
- 17. Limitorque TWX to BPCo., 5-29-79 g
- 18. SPSD-QC-206 M
i
Pg 2 of 2
- 21. Limitorque letter to BPCo., 6/11/79 H
- 22. Limitorque letter to BECo., 2/17/79 N
- 23. Limitorque letter to BEco., 4/27/79 N
- 24. Limitorque letter to BECo., 8/31/79 N
- 25. Wyle QSR-018-A-02 0
- 26. Wyle QSR-027-A-02 0
- 27. Wyle QSR-026-A-01 0
- 28. Acton Test Report 15566-22 P
/
{
- 29. Acton Test Report 15566-23 P
- 30. Rosemount Report 117415 R
31 Rosemount letter to BEco.,1-9-80 S
- 32. Atwood & Morrill Test Report No.
T 33 Rockwell Report 2792-03-02 U
- 34. NAMC0 Test Report for Model V
EA-740, 2-20-78 l
- 35. Kerite letter to Boston Edison, 7-21-80 Z.
- 37. Electroswitch Engineering Test Report 2392-14 BB.
i 4
^
l i
- i l
+-
PROPRIETARY DOCUMENTS ITEM # FROM DOCUMENT RFI-C5257-489 W
1.
G.E. Qualification Test Data DV 145C3040 2.
GE Letter G-HK-9-123 J
3.
G.E. Report 145C3012 0
E 4.
Conax Report IPS-344 Rev. A 5.
ITT Barton Test Procedure 999.1217.2 F
J 6.
G.E. letter G-Hk-9-44 7.
G.E. letter G-HK-9-72 dated 6-5-79 J
J 8.
G.E. letter G-HK-0-163 X
9.
G.E. Test Report No. 327 X
- 10. G.E. Data Sheet No. 248A9418
- 11. G.E. Topical Report 492HA166 C
12 G.E. Test Report - Terminal Block LOCA Test for I
EP assemblies, 11-6-73
- 13. G.E. Letter 8-1-80 Y
- 14. G.E. Letter 10-21-80 Y
l-l l
w i
l I.
~
SUPERSEDED DOCUMENTS ITEM #FROM DOCUMENT RFI-C5257-489 1.
Wyle QSR-037-A-01 0
2.
Louis Allis letter to BPC0, 11-15-77 G
3.
P&CS memoranda Number 80-238 H
4.
P&CS memorandIa number 80-186 H
5.
Wyle QRS-040-A-01 0
d 4
i i
i-r l
l
.~
- - _ _ _....., _ _.