MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0. J A C K S O N. MI9SISSIPPI 39205 March 5, 1982 NUCLE AR PRODUCTION DEPARTMENT
't
/g
/
/.
/
/Y U.S. Nuclear Regulatory Commission
,8 Office of Nuclear Reactor Regulation O~*,g Washington, D.C.
20555
~)
L
,.7
..y 8 -
Attention:
Mr. Harold R. Denton, Director
\\'-
p/ '
Dear Mr. Denton:
.}
. /
SUBJECT:
GrandGulfNuclearSEtion
~
Units 1 and 2 Docket Nos. 50-416 and 50-417 File 0260/15601 NUREG-0654 Table B-1 Staffing Requirements AECM-82/59 Supplement No. I to the Safety Evaluation Report (SER), NUREG-0831, for Grand Gulf Nuclear Station (GGNS) indicates that the only open item remaining in the GGNS Units 1 and 2 Emergency Plan i the 30-60 minute staffing augmentation as outlined in NUREG-0654, Tabie B-1.
This issue is addressed in the supplement and the SER as Outstanding Issue, Item 1.9(14).
We have reviewed Table 5-1, " Shift Staffing and Augmentation Capabilities," of the Emergency Plan against NUREG-0654, and in light of the experience gained as a result of our successful emergency preparedness exercise in November, 1981, a revised Table 5-1, which will be included in the next revision to the Emergency Plan, is attached to this letter. We feel that the new Table 5-1 accurately reflects the staffing and augmentation capabilities of GGNS in the event of an emergency, and that it complies with the guidance in NUREG-0654.
Submittal of this information should close this open item.
If you have any questions, please advise.
Yours truly,
/
L.-
F. Dale PBB/LRM/JDR:Im
/ f Attachment cc:
(See Next Page)
AESDDI 8203120306 820305
,mber Middle South Utilities System PDR ADOCK 05000416 E
='
MI2215SIPPI POWER Q LICHT COMPANY Page 2 cc:
Mr. N. L. Stampley (w/a)
Mr. G. B. Taylor (w/a)
Mr. R. B. McGehee (w/a)
Mr. T. B. Conner (w/a)
Mr. Richard C. DeYoung, Director (w/a)
Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C..20555 AE5DD2
TABLE 5-1 SHIFT STAFFING AND AUGMENTATION CAPABILITIES Capability for Additions -
Emergency Function Position / Expertise Onshift 30 minutes 60 minutes l
l Plant Operations and assessment Shift Superintendent (SRO) 1 of operational aspects Plant Operations and assessment Shif t Supervisor (SRO) 1 of operational aspects Plant Operations and assessment Nuclear Operator A (SRO) 2 of operational aspects Plant Operations and assessment Auxiliary Operator 2
of operational aspects Communications Operator / Technician 1
1 2
Overall responsibility for MP&L Off-site Emergency Coordinator 1
emergency response Off-site dose assessment Operator / Health Physicist 1*
1 1
Radiological accident assessment Senior Health Physicist 1
Radiological surveys Health Physicist / Maintenance /
1 4**
4 Environmentalist Chemistry / Radiochemistry Chemist 1
1 Technical support Shift Technical Advisor 1
Plant Systems Engineering -
Engineer 1
Core / Thermal Hydraulics Plant Systems Engineering -
Engineer 1.
Electrical Plant Systems Engineering -
Engineer 1
Mechanical M4V3
TABLE 5-1 Cont'd SIIIFT STAFFING AND AUGMENTATION CAPABILITIES Capability for Additions Emergency Function Position / Expertise Onshift 30 minutes 60 minutes Repair and Corrective Actions -
Operator / Technician 1*
1 Mechanical Maintenance /Radwaste Repair and Corrective Actions -
Operator / Technician 1*
1 1
Electrical Maintenance /
Instrument and Control Repair and Corrective Actions -
Engineer / Technician 1
Instrument Maintenance Inplant Protective Actions -
llealth Physicist 2*
2 2
Radiation Protection Fire fighting Shift Personnel 5*
Rescue /first aid Shift Personnel 2*
Security Security Personnel (See Security Plan)
TOTALS 10 11 16
- - May be provided by shif t personnel assigned other duties
- - Should there be a time delay in the arrival of these individuals, their duties will be performed in the interim by other personnel who are present, but normally assigned other duties.
- - Provided by Claiborne County / Port Gibson M4V2