ML20049H900

From kanterella
Jump to navigation Jump to search
Motion to Stay Proceedings Until Applicant Determined Extent of Damage Caused by Failure to Install Concrete in Bioshield Properly.Proof of Svc Encl
ML20049H900
Person / Time
Site: Perry  
Issue date: 02/24/1982
From: Wilt D
SUNFLOWER ALLIANCE, WILT, D.D.
To:
Atomic Safety and Licensing Board Panel
Shared Package
ML20049H901 List:
References
ISSUANCES-OL, NUDOCS 8203040454
Download: ML20049H900 (1)


Text

,

s

. 3, N(,

ce

.... e~

W.:.

'g p,p31

$3? '""

UNITED STATES OF AMERICA p.y,fl((I.

/

NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY & LICENSING BOAR 9, W

4 lgti

~

IN THE MATTER OF:

)

)

Docket N 0-QLt.

CLEVELAND ELECTRIC ILLUMINATING

)

50-441-Ob COMPANY, et al.,

)

r;,

g ; p, 3

[ Perry Nuclear Power Plant Units 1 & 2] )

}l.

w g,O 3

,C l23p_. /f 7"'

MOTION TO STAY PROCEEDINGS 1

g S

A Sunflower Alliance, Inc., et al., one of the in ervenors. J N

i. ; >'

herein, moves the Atomic Safety & Licensing Board for itsYder staying the licensing proceedings until such time as the applicant as determined the extent of damage caused by its f ailure to properly install concrete in the bioshield at the Perry Nuclear Power Plent and until such time as it has established to intervenors and this board that the bioshield has been constructed in accordance with applicable regulations and procedures.

A Brief is attached in support of this Motion.

Respectfully submitted

/

)

['

Darfiel D. Wilt L 73p1 Chippewa Road Brecksville, OH 44141 (216) 526-2350 Attorney f or Sunflower Alliance

' PROOF OF SERVICE listed on the attached Service List on this (4)4V day of February, A copy of this Motion has been sent to 1 those persons 7

1982.

\\

Ys l

l 1 (#

//r 8203040454 820224 Danie1"D. Wil L' WV PDR ADOCK 05000440 PDR A torney for unflower Alliance