ML20049H816
| ML20049H816 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 02/09/1982 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20049H811 | List: |
| References | |
| NUDOCS 8203040116 | |
| Download: ML20049H816 (1) | |
Text
-
7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSIOM DOCKETS NOS. 50-277 AND 50-278 PHILADELPHIA ELECTRIC COMPANY, ET AL NOTICE OF ISSUANCE OF Af1ENDMENTS TO FACILITY OPERATING LICENSES The U. S. Nuclear Regulatory Commission (the ' Commission) has issued Amend-ments Nos. 83 and 82 to Facility Operating Licenses Nos. DPR-44 and DPR-56, issued to Philadelphia Electric Company, Public Service Electric and Gas Company, Delmarva Power and Light Company, and Atlantic City Electric Company, which revised Technical Specifications (TSs) for operation of the Peach Bottom Atomic Power Station, Units Nos. 2 and 3 (the facility) located in York County, Pennsylvania. The amendments are effective as of the date of issuance.
These amendments make administrative changes to the TSs which correct the Low-Low water level designation on Table 3.2.B; correct responsibilities of the Plant Operations Review Committee; and modify the startup report description.
The application for the amendments c' mplies with the standards and require-o l
I ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards considera-tion.
8203040116 820209 PDR ADOCK 05000277 P
r-
~
~
f
.. 7590-01 The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environ-mental impact appraisal need not be prepared in connection with issuance of these amendments.
For further details with respect to this action, see (1) the application for amendments dated October 1,1981,(2) Amendment No. 83 to License No. DPR-44 dnd Amendment No. 82 to License No. DPR-56 and (3) the Commission's related Safety Evaluation.
All of these items are available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C., and at the Government Publications Section, State Library of Pennsylvania, Education Building, Commonwealth and Walnut Streets, Harrisburg, Pennsylvania.
A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.
20555, Attention:
Director, Division of Licensing.
Dated at Bethesda, Maryland, this 9th day of February 1982.
FOR THE NUCLEAR REGULATORY COMMISSION
)
Joh F. Stolz, Chief s/
s 1_pjrating Reactors Branch #4 0mvision of Licensing l
l
-