Submits Monthly Status Rept Re Evaluations Performed in Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping, Per 800818 Request
ML20049H704
Person / Time
Site: Dresden, Quad Cities, Zion, 05000000
Issue date: 02/19/1982
From: Rausch T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-79-14, NUDOCS 8203030469
Download: ML20049H704 (2)


Text

^

rh Commonwealth Edison

{-] ) ona First National Pitzs, Chictgo Illinois Addr ss R: ply to: Post Office Box 767

's Chicage. tilinois 60690 February 19, 1982 91 t,

REctyyyD

,3 Mr. James G. Keppler, Regional Administrator a

M4R Qg 7 0286 Directorate of Inspection and Q

Enforcement - Region III 1;

U.S. Nuclear Regulatory Commission 6

799 Roosevelt Road Glen Ellyn, IL 60137 Q>

N J

Subject:

Dresden Station Units 2 and 3 Quad Cities Station Units 1 and 2 Zion Station Units 1 and 2 Monthly Report o f Status o f I.E.

Bulletin 79-14 Evaluations (through January,1982)

NRC Docket Nos. 50-237/249, 50-254/265 and 50-295/304 References (a):

J. G.

Keppler letter to Cordell Reed dated August 18, 1980.

(b):

T.

J.

Rausch latter to J. G.

Keppler dated November 9, 1981.

(Actions Taken to Correct CCSW Piping Support Damage.)

Dear Mr. Keppler:

In accordance with the request of Reference (a), the following monthly status report is provided for your use regarding the evaluations performed at Dresden, Quad Cities and Zion Statons in response to I.E. Bulletin 79-14.

The content of this report now only addresses systems found to be inoperable per discussions with Messrs.

I.

Yin and D. Daniellson of your office.

At Dresden ano Quad Cities Stations, there are no changes since the last status report for I.E. Bulletin 79-14.

At Zion Station, stress points in subsystem 2SW-50A have been found to exceed the 2.4 Sh primary pipe stress SSE loading limit.

The nodal points in the subsystem where this condition occurs, as well as the associated stress, is as follows:

Nodal Point 2.4 Sh (psi)

Computed Stress (psi) 816 36,000 52,946 818 36,000 54:061 FEB 24 1982 8203030469 820219 PDR ADOCK 05000237 G

PDR SK//

.~

O J. G. Keppler Februa ry 19, 1982 In addition, stress points in subsystem RH-8 have been found to exceed the 2.4 Sh Limit.

The nodal points in the sybsystem where this condition occurs, as well as the associated stress, is as follows:

Nodal Point 2.4 Sh (psi)

Computed Stress (psi) 50 35,880 39,369 55 35,880 38,168 Appropriate repairs to these subsystems have been performed such that pipe system stresses are within the FSAR allowables.

The revised Dresden and Quad Cities I.E. Bulletin 79-14 schedules discussed in Reference (b) will be provided under separate cover.

Please address any questions you may have concerning this matter to this office.

Very truly yours, N

Thomas J. Rausch Nuclear Licensing Administrator 1m cc: