ML20049H691
| ML20049H691 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 02/19/1982 |
| From: | Bates J, Mcalpine E, Sabados J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20049H683 | List: |
| References | |
| 70-1151-82-02, 70-1151-82-2, NUDOCS 8203030452 | |
| Download: ML20049H691 (1) | |
Text
u. ATE #iAL 1RANittilw..... n CCt#AINs 2JPQ ltdoGAliOM
).E UNITED STATES o,
8" 3
NUCLEAR REGULATORY COMMISSION
,E REGION ll o,
'g 101 MARIETTA ST., N.W., SulTE 3100 g
ATLANTA, GEORGI A 30303 FEB 2 2.m Report No. 70-115/82-02 Docket No. 70-1151 License No. SNM-1107 Safeguards Group No.111 Licensee: Westinghouse Electric thrporation Drawer R Columbia, South Carolina 29205 Date of Inspection January 25-29, 1982 Type of Inspection:
Unannounced Material Control and Accountability Inspectors:. b / [ r/
/
~
9
/9 f1
- p. Bates, Safeguards Chemist Oate Signed
~
Q. s;w L1D ahqhw J.vd. Sabados, Safeguards Chemist
/Date Signed
~
Approved by:
tM db aviu 2/I9/62_.
t E. J. McAlpine Chief) Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Inspection Inspection Summary Areas Inspected:
Measurements, measurement control program and follow-up on a previous inspection finding.
The inspection involved 59 inspector hours by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliancs with NRC requirements 1n the three areas examined during the inspection.
JAATERIAL TRAN5URTLD HGr.VITH 8203030452 820222 CNAN W **
- POR ADOCK 07001151 C