ML20049H632

From kanterella
Jump to navigation Jump to search
Forwards Scope & Objectives for Spring 1982 Emergency Planning Exercise,Per 820112 Request.Advance Notice Delayed Due to Timing of Request
ML20049H632
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 02/22/1982
From: Delgeorge L
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8203030392
Download: ML20049H632 (3)


Text

<

CommonwealtL Edison

/

) one First N:tional Plata. Chicago Ilknois

,,J M E UJ,STffF

~

7 Addr:ss R: ply to: Post Offica Box 767 t/ MR 3./a&4T ri i

(

/ ChtCago. Illinois 60690 MD l

h 4'r !/d ll v&TT l

l February 22, 1982 gj y

OEPmn viin f.)

9', -

.N Mr. James G.

Keppler, Regional Administrator j'

N Directorate o f Inspection ano Enforcement - Region III g/

U.S. Nuclear Regulatory Commission ryn 4 g((',}

[

, -l 799 Roosevelt Road 2

2*

Glen Ellyn, IL 60137

)j

Subject:

LaSalle County Station Unit 1 gq;g_;p/d)

Emergency Preparedness Exercize Description o f Objectives NRC Docket No. 50-373 Reference (1):

J.

G.

Keppler letter to Cordell Reed dated January 12, 1982

Dear Mr. Keppler:

The purpose of this submittal is to provide the Scope and Objectives for the LaSalle County Station emergency planning exercise scheduleo f or the spring of 1982.

This information was requested in Reference 1 to be submitted 75 days in advance of the planned exercize date.

Although Region III personnel were advised of and invited to planning meetings at which the attached materials were oeveloped, the 75 day advance notice by formal documentation could not be met due to the timing of the request in Reference (1),

i.e.

January 12, 1982.

However, these materials were telecopied to Mr.

W. Axelson of your staf f on February 19, 1982, as soon as they became available, and subsequent advence notice dates discussed in Reference (1) are expected to be met.

If there are any questions in this regard, please direct I

them to this of fice.

Very truly yours,

=

L. O. DelGeorg Director o f Nuclear Licensing Attachment cc:

NRC Resident Inspector - LSCS Mr. B. K.

Grimes, Director 3494N 8203030392 820222 FEB 2 5 7 DR ADOCK 05000

{

,,.-. -.. - ~...,. _.

......._._-._.m_..-.a..__._....

.m.

e

  • $'t Y

OBJECTIVES PRIMARY OBJECTIVE:

Demonstrate the capability to implement the Commonwealth Edison Generating Stations Emergency Plan in cooperation with the Illinois Plan for Radiological Accidents to protect the public in the event of a major accident at the LaSalle County Station.

SUPPORTING Olk7ECTIVES:

1.

Demonstrate the capability to classify accident conditions and make timely reports in accordance with the GSEP.

2.

Demonstrate the capability to activate the TSC and CCC with directors and appropriate staff in accordance with procedures.

3.

Demonstrate the capability to conduct in-plant radiation protection activities and collect amd simulate analyis of. liquid samples.

4.

Demonstrate the capability of environmental field teams to conduct initial activation of the EOF, conduct field radiation surveys and collect air, liquid, vegetation and soil samples as needed.

5.

Demonstrate the capability to exercise initial control of off-site environmental activities, transfer control to appropriate state agencies and coordinate employment of CECO environmental resources in support of state controlled environmental activities to the extent required by scope of CECO participation.

6.

Demonstrate the capability to calculate off-site dose projections in coordination with governmental agencies.

7.

Demonstrate the capability to provide accurate, timely information to the news media in coopration with governmental agencies.

8.

Demonstrate the capability to effectively communicate reports, information and assessments of the situation among all participating principal command and control centers.

9.

Demonstrate the capability to process information and take appropriate actions in accordance with plans and procedures.

10.

Demonstrate the capability to contact organizations that would normally assist in a given emergency situation, but are not fully participating in this exercise.

11.

Support Illinois State and local agencies during the phases of the exercise in which CECO is not actively participating by reading messages and reacting to questions in accordance with the scenario.

e t

e s

SCOPE OF PARTICIPATION Commonwealth Edison and the LaSalle County Station will participate in the first day of the exercise with a full complement of managers, directors, operators, technicians and staff prescribed by the GSEP and procedures subject to limitaitons imposed by the compressed time nature of the exercise and the need to provide for safe efficient operation of the LaSalle County and other CECO. nuclear generating stations.

During the second day of the exercise, Commonwealth Edison will provide information to State and local authorities, but will not participate with a f ull GSEP organization. Controllers and other CECO.

personnel deemed necessary will read scripted messages portraying the major events and react to questions f rom State and local agencies by referring to complete scenarios. CECO. second day participants will have full advance knowledge of scenario events and will not be participatns in the strict sense of the term.

Commonwealth Edison will demonstrate the capability to make contact with contractors whose assistance would be required by the simulated accident situation, but will not actually incur the expense of using contractor services to simulate emergency response except as s prearranged specifically for the exercise.

4 Commonwealth Edison will arrange to provide actual transportation and communicatior.s support in accordance with existing agreements to the extent specifically prearranged for the exercise.

Commonwealth Edison will provide unforeseen actual assistance only to the extent the resources are available and do not hinder normal operation of the company.

06279A l

l l

- --