ML20049H414
Jump to navigation
Jump to search
| ML20049H414 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/16/1982 |
| From: | TOLEDO EDISON CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20049H413 | List: |
| References | |
| NUDOCS 8203020758 | |
| Download: ML20049H414 (1) | |
Text
..
4 DAVIS-BESSE REVISION COVER SHEET i
j February 16, 1982 DATE TO: J kh & / 'J$n t. /hM hrnst.
FROM: EMERGENCY PLANNING & PREPAREDNESS SUPV.
SUBJECT:
Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual Changes This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual.
Control Copy $ d.
Inutructions for the material are as follows:
REMOVE AND RETURN INSERT Revision Index, Rev. 9 Revision Index, Rev. 10 T-6059 in front of EI-1300.03.1 T-6060 in front of EI-1300.04.1 T-6061 in front of EI-1300.05.1 T-6051 in front of EI-1300.08.2 P
Date Revision Entered Addressee Signature RETURN TO THE OFFICE MANAGER STOP #3050 8203020758 820224 PDR ADOCK 05000346 F
-