ML20049A922
| ML20049A922 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 09/23/1981 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Haynes R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20049A923 | List: |
| References | |
| 81-225, NUDOCS 8110020370 | |
| Download: ML20049A922 (1) | |
Text
V llt' r t1 Y CMLC f ?#7 p
i B O STO N EDISON COMPANY Ornemat Orrican aOO sortstou starrT SO Bv0 N. M ASS ACHUBrTTs 0219 9
- "M
NUCLEAR OPERATIONS SUPPORT DEPARTMENT September 23,1981 BECo. Ltr. #81-225 g
/
h (h 6
Mr. Ronald C. Haynes g
Office of Inspection and Enforcement
%I Region I
.c OCT2 IOOlh O.
U.S. Nuclear Regulatory Commission i-P., u'sMgma C 631 Park Avenue King of Prussia, PA.
19406 4
y h
. sY V/
License No. DPR-35 Docket No. 50-293 Radioactive Effluent Release Report January 1 through June 30, 1981
Dear Sir:
In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.C.1, Boston Edison Company hereby submits 2 copies of the Pilgrim Nuclear Power Station Radioactive Effluent Release Report.
The reporting period is from January 1,1981 through June 30, 1981.
The report format and content are in accordance with NRC Regulatory fraide 1.21:
MEASURING, EVALUATING, AND REPORTING RADI0 ACTIVITY IN SOLID WASTES An RELEASES OF RADI0 ACTIVE MATERIALS IN LIQUID AND GASE0US EFFLUENTS FROM LIGHT-WATER COOLED NUCLEAR POWER PLANTS, Revision 1, Tables IA,1B,1C, 2A, 2B, 3, 4A 4A-2 and Supplemental Information.
i Very truly oum,
(Y Y Av'//N' (2 copies) cc: Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation g
U.S. Nuclear Regulatory Commission v,
l Washington, D. C.
20555 (6 copies) i Commonwealth of Massachusetts Director, Executive Office of Manpower Affairs Dept. of Labor and Industries W
Division of Occupational Hygiene 39 Boylston Street (9th floor)
?
Boston, MA.
02116 (1 copy) 0110020370 810923 PDRADOCKOSOOOg R
t a
.