August 4 1993 4
Docket No. 50-331 DISTRIBUTION:
Docket File RPulsifer NRC & Local PDRs OGC Mr. Lee Liu PDIII-3 Reading ACRS (10)
Chairman of the Board and JRoe PDIII-3 Gray Chief Executive Officer JZwolinski Region III DRP Iowa Electric Light and Power Company JHannon HRathbun (I3-H-3)
P. O. Box 351 MRushbrook Cedar Rapids, Iowa 52406
Dear Mr. Liu:
SUBJECT:
DUANE ARNOLD ENERGY CENTER - CONFORMANCE TO REGULATORY GUIDE 1.97, REV. 2 (TAC M84788)
By letters dated July 3 and October 16, 1985, March.31, 1987, and May 3, 1989, Iowa Electric Light and Power Company, the licensee for Duane Arnold Energy Center (DAEC), submitted information regarding the implementation of Regulatory Guide (RG) 1.97, Revision 2.
The NRC staff's Safety Evaluation Report (SER) dated May 9,1990, accepted the licensee's proposal for compliance with RG 1.97, Revision 2.
During the period December 9-13, 1991, Region III conducted an inspection of the DAEC facility to examine the licensee's implementation of RG 1.97.
No deviations were found during the inspection. However, as a result of later discussions held with the licensee, several additional action items were identified and by letter dated June 26, 1992, the licensee submitted a report addressing these additional items. One item regarding Class IE power for Category 1 instruments required further clarification, and by letter dated July 9,1993, the licensee provided the staff with the additional information.
i The staff has reviewed the licensee's submittals and has concluded that the licensee either conforms to, or is justified in deviating from, the guidance of RG 1.97 for each post-accident monitoring variable.
i Enclosed is the subject supplemental safety evaluation report. The licensee's program for Regulatory Guide 1.97, Rev. 2 is subject to inspection.
Sincerely, Original Signed By:
Robert M. Pulsifer, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation
.L cc: w/ enclosure 060036 See next page OFFICE PDMPifSdLA:DRPW PDIII-3:PM;[)4W PDIII-3:PD:DRPW MRuNrook RPulsifehnp/bj JHannonDfw NAME DATE
\\ /k /93
[/L[/93 f/ f/93 0FFICIAL RECORD D FO l DOCUMENT NAME: g:\\duanearn\\du84788A.LTR F M,f a5 g h h I
P i
9308200099 930804 PDR ADOCK 05000331 1
p PDR
"****Q;t p3 UNITED STATES f
'o NUCLEAR REGULATORY COMMISSION E
'E WASHINGTON, D.C. 205150001 4,*****,k August 4, 1993 Docket No. 50-331 l
l Mr. Lee Liu Chairman of the Board and H
Chief Executive Officer
)
Iowa Electric Light and Power Company j
P. O. Box 351 H
Cedar Rapids, Iowa 52406
Dear Mr. Liu:
SUBJECT:
DUANE ARNOLD ENERGY CENTER.CONFORMANCE TO REGULATORY GUIDE 1.97, REV. 2 (TAC M84788)
By letters dated July 3 and October 16, 1985, March 31, 1987, and May 3, 1989, Iowa Electric Light and Power Company, the licensee for Duane Arnold Energy Center (DAEC), submitted information regarding the implementation of Regulatory Guide (RG) 1.97, Revision 2.
The NRC staff's Safety Evaluation Report (SER) dated May 9,1990, accepted the licensee's proposal for compliance with RG 1.97, Revision 2.
-l During the period December 9-13, 1991, Region III. conducted an inspection of the DAEC facility to examine the licensee's implementation of RG 1.97.
No deviations were found during the inspection. However, as a result of later discussions held with the licensee, several additional action items were identified and by letter dated June 26, 1992, the licensee submitted a report' addressing these additional items. One item regarding Class IE power for Category 1 instruments required further clarification, and by letter dated July 9,1993, the licensee provided the staff with the additional information.
The staff has reviewed the licensee's submittais and has concluded that the licensee either conforms to,.or is justified in deviating from, the guidance of RG 1.97 for each post-accident monitoring variable.
Enclosed is the subject supplemental safety evaluation report. The licensee's program for Regulatory Guide 1.97, Rev. 2 is subject to inspection.
u Sincerely,
/
ober M. Puls' er, Project Manager Project Directorate III-3 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosure:
Safety Evaluation cc: w/ enclosure See next page
Mr. Lee Liu Iowa Electric Light and Power Company Duane Arnold Energy Center cc:
Jack Newman, Esquire Kathleen H. Shea,' Esquire Newman and Holtzinger 1615 L Street, N.W.
Washington, D.C.
20036 Chairman, Linn County Board of Supervisors Cedar Rapids, Iowa 52406 lowa Electric Light and Power Company ATTN: David L. Wilson Plant Superintendent, Nuclear 3277 DAEC Road Palo, Iowa 52324 Mr. John F. Franz, Jr.
Vice President, Nuclear l
Duane Arnold Energy Center 3277 DAEC Road Palo, Iowa 52324 P
Mr. Keith Young Manager, Nuclear Licensira Duane Arnold Energy Cente.
3277 DAEC Road Palo, Iowa 52324 U.S. Nuclear Regulatory Commission Resident Inspector's Office Rural Route #1 Palo, Iowa 52324 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Stephen N. Brown Utilities Division Iowa Department of Commerce Lucas Office Building, 5th Flomt Des Moines, Iowa 50319
.