{{#Wiki_filter:F. _: A ,1,% m yc, m,r
- on.,r+,x,so. u % m m.,an c
z o August 16, 1993 0 a w Zenngue m %-s t. s. s F rm, N av r: U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen: In the Matter Of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF JULY 1993 In accordance with the requirements of the BFN Technical j Specifications section 6.9.1.3, the Monthly Operating. Report for the month of July 1993 is provided in the enclosure. 1 If you have any questions, please telephone Pedro Salas (205) 729-2636. ~ Sincerely, O. J. Zeringue Enclosure cc: See page 2 I 1 1 , yI 9308190359 930731 3 I PDR ADOCK 05000259 7 R PDR' l
a i U.S. Nuclear Regulatory Commission Page 2 August 16, 1993 Enclosure I cc (Enclosure): Mr. R. V. Crlenjak, Project Chief U.S. Nuclear Regulatory Commission Region II l 101 Marietta Street, NW, Suite 2900-l Atlanta, Georgia 30323 { Mr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II Office of Nuclear Reactor i Regulation, Mail 13 H3 Washington, D.C. 20555 INPO Records Center Institute of Nuclear Power Operaticns 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30389 t Mr. Ted Martson, Director l Electric Power Research Institute P. O. Box 10412 Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Regional Administrator l U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Services, Utility Data Institute, Inc. j 1700 K Street, NW, Suite 400 i Washington, D.C. 20006 } i j ?
l ENCLOSURE I MONTHLY OPERATING REPORT i BROWNS FERRY NUCLEAR PLANT TENNESSEE VALLEY AUTHORITY j t JULY 1993 i i I DOCKET NUMBERS 50-259, 50-260, AND 50-296 { LICENSE NUMBERS DPR-33, DPR-52, AND DPR-68 i i I t f I 4 i j 't a E I
- i i
I I 4 i s j
i l f I OPERATIONAL
SUMMARY
JULY 1993 [ UNIT 1 i i Unit 1 remains on administrative hold to resolve various TVA and NRC concerns. The operating data report reflects the assignment i of administrative hold status to unit one effective June 1, 1985. Administrative hold status is considered by TVA to suspend the accrual of reporting period hours, because this unit is considered to have a maximum dependable capacity of 0 Mwe. For this reason, cumulative reporting period hours for the period I' after June 1, 1985, to present are not considered when calculating operating status variables such as cumulative capacity factor rate. These considerations will affect the other
- l operating status reporting variables accordingly.
4 r UNIT 2 l i Unit 2 operated continuously during the month of July at a capacity factor of 98.8 percent and generated 803,840 megawatt hours gross electrical power. i i ) UNIT 3 i l t Unit 3 remains on administrative hold to resolve various TVA and l NRC concerns. The operating data report reflects the assignment of administrative hold status to Unit 3 effective June 1, 1985. l Administrative hold status is considered by TVA to suspend the accrual of reporting period hours, because this unit is l considered to have a maximum dependable capacity of 0 Awe. For this reason, cumulative reporting period hours for the period after June 1, 1985, to present are not considered when ? calculating operating status variables such as cumulative I capacity factor rate. These considerations will affect the other operating status reporting variables accordingly. i i e 1 i a r- ...,--,,_n,,,-. -r-
E. - 1 7 i l l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-259 i UNIT: One PREPARED BY: S. A. Ratliff TELEPHONE: DO5) 729-2937 j MONTH JULY 1993 l t DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) (Mwe-Net) [ i 1 0 17 0 ~ l 2 0 18 0 f 3 0 19 0 -I 4 0 20 0 i 5 0 21 0 3 6 0 22 0 f 7 0 23 0 r B O 24 0 t f 9 0 25 0 1 10 0 26 0 1 11 0 27 0 4 t 12 0 28 0 [ 13 0 29 0 j 14 0 30 0 l 15 0 31 0 16 0 i i l I l l J ] -p yr .-7-s'- --. 1 - -2 -t-----
4 l
- i:
t AVERAGE DAILY UNIT POWER LEVEL .l DOCKET NO: 50-260
- j UNIT
Two PREPARED BY: S. A. Ratliff TELEPHONE: (205) 729-2937 i MONTH JULY 1993 l I { DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mwe-Net) (Mwe-Net) i 1 1056 17 1054 2 1050 18 1072 i 3 1060 19 1032 l l 4 1059 20 1058 5 1058 21 1058 6 1061 22 1048 l 7 1061 23 1051 i 8 1055 24 1048 j 9 1058 25 1050 i 10 1054 26 104' 11 1051 27 1017 12 1055 28 1048 13 1060 29 1048 t 14 1058 30 1056 15 1060 31 1035 l 16 1057 't I I i a ~ < -.. m-,i .r .c
l 1 AVERAGE DAILY UNIT POWER LEVEL i DOCKET NO: 50-296 UNIT: Three PREPARED BY: S, A. Ratliff TELEPHONE: (205) 729-2937 l ? MONTH JULY 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Hwe-Net) (Mwe" Net) s 1 0 17 0 s 2 0 18 0 I 3 0 19 0 l 4 4 0 20 0 [ 5 0 21 0 6 0 22 O l 1 j t 7 0 23 0 0 0 24 C 9 0 25 0 f r 6 10 0 26 0 i 11 0 27 0 1 I 4 12 0 28 0 13 0 29 0 i J l l 14 0 30 0 .j i i 15 0 31 O l 1 16 0 l s 4 4 t J 4 1
m PLG ET NO: 50-259 UN!T SHUTDOWNS AND POWER REDUCTIONS UNI T N Aa'E : One PRf9ARED BY: S. A. Rattiff REPORT MONTH: JULY 1993 TEL;rHONE: Gr@ 7394937 W r thod of License Cause and Corrective e Duration Shutting Event Syst m Component Action to Frevent No. Date Type' tHours) Reason # Down Reactor' Report No. Code' Code
- Recurrence 315 06/01/85 N/A 744 F
4 A&inistrative hold to resolve various TVA and NRC concerns. 'F : Forced Peason: Method: ' Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets f or Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D Regulatcry Restriction 4-Continuation of Existing Outage (NUREG-061) E-Operator Training and License Examination 5-Reduction F-A &inistrative 9-Other G-Operational Error (Explain) ' Exhibit I-Same source H-Other (Explain)
~ DOCKET NO: 50-260 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: Two PREPARED BY: S. A. Rattiff REPORT MONTH: JULY 1993 TELEPHONE: (205) 739-2937 1 Method of License Cause and Corrective Duration Shutting Event System Conponent Action to Prevent No. Date Type' (Hours) Reason
- Down Reactor' Report No.
Code
- Code' Recurrence N/A 4
'F Forced Reason: ' Method: ' Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual. for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage' (NUREG 061) E*cperator Training and License Examination 5 Reduction F-Achinistra t ive 9 Other. G-Operati mal Error (Explain) ' Exhibit I-Same Source M-Other (Explein) DOCKET NO: 50-296 - UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: Three ~..
PREPARED BY: S. A. Datliff REPORT MONTH: JULY 1993 TELEPHONE: (205) 739-2937 s Method of License Cause and Corrective Duration shutting Event System Component Action to Prevent No. Date Type' (Hours) Reason' Down Reactor' Report No. Code
- Code' Recurrence 315 06/01/85 N/A 744 F
4 Administrative hold to resolve various TVA and NRC concerns. i 'F: forced ' Reason: ' Method: ' Exhibit G-Instructions $: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-061) E-Operator Training and License Examination .5-Reduction F-Adninist rative 9-Other G-Operational Error (Explain) ' Exhibit I-Same Source H-Other (Explain) J
i I h l i I OPERATING DATA REPORT I DOCKET No. 50-259 'f PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 i t f OPERATING STATUS
- 1. Unit Name: BROWNS FERRY UNIT ONE
- 2. Reporting period: JULY 1993
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electric Rating (Net MWe): 1065
- 6. Maximum Dependable capacity (Gross MWe): 0 l
- 7. Maximum Dependable Capacity (Net MWe): 0 h
8. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A j
- 9. Power Level To which Restricted, If Any (Net MWe): 0
- 10. Reason For Restrictions, If Any: Administrative hold i
THIS YEAR-TO f MONTH DATE CUMULATIVE * [ I
- 11. Hours In Reporting Pariod 0.0 0
95743
- 12. Hours Reactor Was Critical 0.0 0
59521
- 13. Reactor Reserve Shutdown Hours 0.0 0
6997 I
- 14. Hours Generator On Line 0.0 0
58267
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
168066787 j
- 17. Grosn Electric Generation (MWh) 0.0 0
55398130
- 18. Net Electric Generation (MWh) 0.0 0
53796427 l
- 19. Unit Service Factor 0.0 0.0 60.9
- 20. Unit Availability Factor 0.0 0.0 60.9
- 21. Unit Capacity Factor {MDC Net) 0.0 0.0 52.8
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 52.8
- 23. Unit Forced Outage Rate 0.0 0.0 25.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined
- Excludes-hours under administrstive hold
I OPERATING DATA REPORT [ i 1 DOCKET NO. 50-260 PREPARED BY S.A.RATLIFF TELEPHONE 205-729-2937 OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT TWO
- 2. Reporting period: JULY 1993
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152 i
5. Design Electric Rating (Net MWe): 1065 3
- 6. Maximum Dependable Capacity (Gross MWe): 1098.4
[
- 7. Maximum Dependable Capacity (Net MWe): 1065 8.
If Changes Occur in Capacity Ratings (Items Number 3 i Through 7) Since Last Report, Give Reason: N/A t f 9. Power Level To which Restricted, If Any (Net MWe): N/A i
- 10. Reason For Restrictions, If Any: N/A THIS YEAR-TO MONTH DATE CUMULATIVE *
- 11. Hours In Reporting Period 744.0 5087 109638
- 12. Hours Reactor Was critical 744.0 2181 71144
- 13. Reactor Reserve Shutdown Hours 0.0 0
14200
- 14. Hours Generator On Line 744.0 2081 68952
- 15. Unit Reserve Shutdown Hours 0.0 0
0 i
- 16. Gross Thermal Generation (MWh) 2442100.5 5805442 196534093
- 17. Gross Electric Generation (MWh) 803480.0 1889420 65167068
- 18. Net Electric Generation (MWh) 783134.0 1834660 63302480
- 19. Unit Service Factor 100.0 40.9 62.9 l
20 Unit Availability Factor 100.0 40.9 62.9
- 21. Unit Capacity Factor (MDC Net) 98.8 33.9 54.2
- 22. Unit Capacity Factor (DER Net) 98.8 33.9 54.2 l
- 23. Unit Forced Outage Rate 0.0 0.0 19.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None
- 25. If Shut Down At End Of Reporting Period, Estimated Date Of Startup: N/A
- Excludes hours under administrative hold (June 1, 1985, to May 24, 1991)
F 1 OPERATING DATA REPORT .] I l DOCKET NO. 50-296 PREPARED BY S.A.RATLIFF l TELEPHONE 205-729-2937 j { OPERATING STATUS i
- 1. Unit Name BROWNS FERRY UNIT THREE
- 2. Reporting period: JULY 1993
'l
- 3. Licensed Thermal Power (MWt): 3293 i
- 4. Nameplate Rating (Gross MWe): 1152 l
- 5. Design Electric Rating (Net MWe): 1065
{
- 6. Maximum Dependable Capacity (Gross MWe): 0
- 7. Maximum Dependable Capacity (Net MWe): 0 8.
If Changes Occur in capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To which Restricted, If Any (Net MWe): 0
- 10. Reason For Restrictions, If Any: Administrative hold i
i t THIS YEAR-TO MONTH DATE CUMULATIVE *
- 11. Hours In Reporting Period 0.0 0
73055 t
- 12. Hours Reactor Was Critical 0.0 0
45306 f
- 13. Reactor Reserve Shutdown Hours 0.0 0
5150
- 14. Hours Generator On Line 0.0 0
44195 j
- 15. Unit Reserve Shutdown Hours 0.0 0
0
- 16. Gross Thermal Generation (MWh) 0.0 0
131868267
- 17. Gross Electric Generation (MWh) 0.0 0
43473760 i
- 18. Net Electric Generation (MWh) 0.0 0
421140n9
- 19. Unit Service Factor 0.0 0.0 60.5
- 20. Unit Availability Factor 0.0 0.0 60.5
- 21. Unit Capacity Factor (MDC Net) 0.0 0.0 54.2
- 22. Unit Capacity Factor (DER Net) 0.0 0.0 54.2
- 23. Unit Forced Outage Rate 0.0 0.0 21.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Snut Down At End Of Reporting Period, Estimated Date Of Startup: To be determined
- Excludes hours under administrative hold