ML20046D376
| ML20046D376 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 08/11/1993 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Opeka J NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| NUDOCS 9308190061 | |
| Download: ML20046D376 (4) | |
Text
y i
~
i j
l II D Docket No. 50-336 Mr. John F. Opeka Executive Vice President - Nuclear Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUlUECT:
REACTOR OPERATOR INITIAL LICENSING EXAMINATIONS AND REQUALIFICATION RETAKE EXAMINATION - MILLSTONE 2 In a telephone conversation on August 9,1993, between Mr. L. Briggs and Mr. R. Spurr, arrangements were made for the administration of licensing examinations at the Millstene Unit 2 facility.
The examinations are scheduled for the week of December 13, 1993. Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in NUREG-1021, " Operator Licensing Examiner Standards," ES-201, Attachment 4, during the week of November 29,1993.
To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by September 27,1993. Any delay in receiving approved and indexed reference material or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled.
The NRC will prepare and administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures,
/)
and levels) generated during the dynamic operating tests until the examination results are y
fm' al.
e OFFICIAL RECORD COPY G:MS121393 l
i
$at r
180070 9308190061 930811 6
Pk(4) 3 8 4
PDR ADOCK 05000336
(
V PDR Q
- i j
Mr. Jofm F. Opeka.
2 AUG 111993
'j o
ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.
Your staff should submit preliminary reactor license applications and waiver requests at least 1
30 days before the first examination date so that the NRC will be able to review the -
applications and the medical certifications and evaluate any requested waivers. If the.
i applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed i
should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number ~
3150-0101, which expires October 31,1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including.
.i suggestions for reducing this burden, to the Information and Records Management Branch, j
MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the
-}
Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
Thank you for your consideration in this matter. Mr. Spurr has been advised of the NRC-guidelines and policies addressed in this letter. If you have any questions on the evaluation l
process, please contact me at (215) 337-5211.
Sincerely, l
o Original Signed By:
Glenn W. Meyer Glenn W. Meyer, Chief PWR Section Operations Branch Division of Reactor Safety 1
J OFFICIAL RECORD COPY G:MS121393
q
'Mr. John F. Opeka 3
g 3.gg3
-y cc:.
j W. D. Romberg, Vice President - Nuclear, Operations Services J.' S. Keenan, Nuclear Unit Director R. M. Kacich, Director, Nuclear Licensing -
G. H. Bouchard, Director of Quality Services
'l M. Wilson, Nuc%ar Licensing
- j S. E. Scace, Vice President, Millstone Station R. Spurr, Supervisor - Operator Training Gerald Garfield, Esquire l
Nicholas Reynolds, Esquire Public Document Room (PDR) j Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC) t NRC Resident Inspector State of Connecticut, SLO
'l l
bec:
Region I Docket Room (w/ concurrences) j L. Briggs, DRS j
OL Facility File DRS File lu bec w/ encl; w/o Attachments (VIA E-MAIL):
V. McCree, OEDO G, Vissing, PM, NRR R. Gallo, Chief, OLB, NRR
[
i i
l l
)
i l
l OFFICIAL RECORD COPY G:MS121393
I- -,..
l -_
Mr. John F. Opeka 4;
AUG 111993 NOTIFY VIA E-MAIL AND NO ATTACHED FILE J. Wiggins, DRP L. Bettenhausen, DRS R. Blough, DRP J. Durr, DRS R. Conte, DRS G. Meyer, DRS L. Doerflein, DRP RI:DRS
[-
RI:DRS Briggs /dmg Meyer 08/k'93 08////93 OFFICIAL RECORD COPY G:MS121393