Ack Receipt of Util 930609 Response to NRC Bulletin 93-002, Debris Plugging of ECCS Strainers. Response Acceptable
ML20046D295
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/28/1993
From: Labarge D
Office of Nuclear Reactor Regulation
To: Medford M
Tennessee Valley Authority
References
TAC-M86615, TAC-M86616 IEB-93-002, IEB-93-2, NUDOCS 9308170194
Download: ML20046D295 (3)


Text

___ - ___-____ _

July 28, 1993 Docket

. 50-327 and 50-328 Tennessee Valley Authority ATIN:

Dr. Mark 0. Medford, Vice President Technical Support p

30 Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801

Dear Dr. Medford:

SUBJECT:

RESPONSE TO NRC BULLETIN 93-02, " DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" - SEQUOYAH NUCLEAR PLANT, UNITS I AND 2 (TAC N05. M86615 AND M86616)

This letter acknowledges receipt of TVA's response dated June 9,1993, to NRC Bulletin 93-02 for the Sequoyah Nuclear Plant, Units I and 2.

The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.

It. requested licensees to identify fibrous air filters or other temporary sources of fibrous material, not designed to withstand a loss of coolant accident, which are installed or stored in the primary containment.

It also required I

licensees to take any immediate compensatory measures that may be required to j

assure the functional capability of the emergency core cooling systems,.and to I

take prort action to remove any such material.

TVA's response stated that fibrous material, such as described in the Bulletin, is not installed in the containment during normal power operation.

During outages, the use of equipment containing fibrous material is-controlled by a procedure for the particular job and its removal is controlled by a cleanliness inspection of the work area following its use.

In addition, a final containment inspection procedure is performed prior to entry into Mode 4 from Mode 5 that ensures containment clearliness.

Based on this information, we considar your response to be satisfactory.

Please retain any records of your actions in response to the Bulletin in the-event an audit is conducted.

Sincerely, Original signed by David E. LaBarge, Senior Project Manager Project Directorate 11-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page 0FC:

PDII-4/LA PDII-4/PMk PQHt-A p PDII-4/D NAME:

BClayton,[

DLaBarge:as JNkman FHebdon N DATE:

7/p/93 7/@/93 7/.27/93 7/2f/93I J

DOCUMENT.NAME:

G:SQN\\86615.LlR

{[ h

gas 9auZiTag7 p

a 9

e I i i 1 Tennessee Valley Authority Sequoyah Nuclear Plant ATTN: Dr. Mark 0. Medford cc: Mr. W. H. Kennoy, Director County Judge Tennessee Valley Authority Hamilton County Courthouse l ET 12A Chattanooga, Tennessee 37402 400 West Summit Hill Drive Knoxville, Tennessee 37902 Regional Administrator U.S.N.R.C. Region II Mr. R. M. Eytchison, Vice President 101 Marietta Street, N.W. Nuclear Operations Suite 2900 Tennessee Valley Authority Atlanta, Georgia 30323 3B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. William E. Holland Senior Resident Inspector Sequoyah Nuclear Plant Mr. B. S. Schofield, Manager U.S.N.R.C. Nuclear Licensing ar.d Regulatory Affairs 2600 Igou Ferry Road Tennessee Valley Authority Soddy Daisy, Tennessee 37379 5B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. Robert Fenech. Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, Tennessee 37379 TVA Representative Tennessee Valley Authority 11921 Rockville Pike Suite 402 Rockville, Maryland 20852 Mr. Ralph Shell, Site Licensing Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, Tennessee 37379 Mr. Michael H. Mobley, Director Division of Radiological Health 3rd Floor, L and C Annex 401 Church Street Nashville, Tennessee 37243-1532 General Counsel Tennessee Valley Authority ET llH 400 West Summit Hill Drive Knoxville, Tennessee 37902 I a

e d .;,v -fr ' / L p_1. sit ribut ion ,Dockete[it le ~ INRC & 1od W PDRs ^ SQN Reading S.:Varga- -G. Lainas F. Hebdon B. Clayton-H D. LaBarge F 'ACRS-(10). l' E. Merschoff, Ril-P. Kellogg, Rll J. Crienjak, Ril J. Hickman R. Barrett cc: Plant Service list j ll l 1 i i I i}}