Forwards Electrical Distribution Sys Functional Insp Repts 50-454/93-06,50-455/93-06,50-456/93-09 & 50-457/93-09 on 930601-0716
ML20046D272
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 08/12/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Delgeorge L
COMMONWEALTH EDISON CO.
Shared Package
ML20046D273 List:
References
NUDOCS 9308170149
Download: ML20046D272 (3)


See also: IR 05000454/1993006

Text

,i-

..

UNITED STATES

  • -

pm Mcg$ ,

.

NUCLEAR REGULATOnY COMMISSION

+

,

. ,

O!

REGION til

799 ROOSEVE LT .RO AD

,

e

g

GL EN ELLYN. ILLINO45 60137

.....

AUG 121993

Docket Nos. 50-454, 50-455,

50-456, and 50-457

Commonwealth Edison Company

ATTN: Mr. L. O. De1 George

Vice President

'

Nuclear Oversight and

Regulatory Services

Executive Towers West III

1400 Opus Place, Suite 300

Downers Grove, IL 60515

Dear Mr. DelGeorge:

This refers to the special electrical distribution system functional

inspection-(EDSFI) conducted by Mr. David S. Butler and others of this office

on June 1 through July 16, 1993. The inspection evaluated activities at the

Byron Station, Units 1 and 2 and at the Braidwood Station, Units 1 and 2,

authorized by NRC Operating Licenses No. NPF-37, No. NPF-66, No. NPF-72, and

No. NPF-77.

We discussed our inspection findings with Messrs. K. Graesser and

S. Berg and other members of your staff at the exit interview on July 16,

1993.

,

Areas examined during the inspection are identified in the report.

The team

assessed the design, implementation, and engineering technical support

relative to the electrical distribution system (EDS).

The purpose of the

'

inspection was to determine whether activities authorized by the above

licenses were conducted safely and in accordance with NRC requirements.

The

inspection consisted of a selective review of design calculations, relevant

procedures, representative records, installed equipment, and interviews with

engineering and technical support staff. This inspection was a comprehensive

four week onsite effort with two weeks spent at each station.

The team concluded that Byron's and Braidwood's EDS were designed, operated,

-

and maintained in an effective manner and that engineering and technical

support was good. The EDS and related support equipment materiel condition

was also good. Although overall experience level of the technical staff was

i

!

not a concern, several relatively inexperienced system engineers were assigned

to some of the more important systems. The team identified.several

t

weaknesses. Most significant was improperly sized fuses installed in Byron's

,

IB diesel driven auxiliary feedwater pump control panel.

t

i

160038

'

9309170149 930812

g

PDR

ADOCK 05000454

1

l

8

L

G-

PDR

.

. -

.

.

PuM/c -1Eo/

'

.

.

_

.

,

,

,

1

l

Commonwealth Edison Company

2

AUG 121993

'

,

No violations of NRC requirements were identified during the course of this

,

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

,

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

,

n

I

fl v' .

\\C

-

T. O. Martin, Acting Director

'

Division of Reactor Safety

Enclosures:

1.

Inspection Reports

,

'

No. 50-454/93006(DRS);

No. 50-455/93006(DRS);

i

No. 50-456/93009(DRS); and

No. 50-457/93009(DRS)

2.

Appendix A - Personnel

Contacted

!

3.

Appendix B - Request

for Information

See Attached Distribution

l

l

.

!

l

!

I

i

i

!

.

!

i

f

. . -

--

(

, --

-

.

.

.

!

'

.

. . .;

i

I

Commonwealth Edison Company

3-

AUG 121993

i

i

i

Distribution

!

r

cc w/ enclosures:

D. Farrar, Nuclear Regulatory

_

Services Manager

i

S. Berg, Site Vice President,

Braidwood

3

K. Graesser, Site Vice President,

Byron

.{

K. Kofron, Station Manager,

.Braidwood

v

G. Schwartz, Station Manager,

Byron

.

i

A. Haeger, Regulatory Assurance

Supervisor, Braidwood

'

D. Brindle, Regulatory Assurance

Supervisor, Byron

j

OC/LFDCB

_;

Resident Inspectors-Braidwood,

Byron, and Zion

j

R. Assa, LPM, Braidwood

i

J. Hickman, LPM, Byron

-f

D. W. Cassel Jr., Esq.

Richard Hubbard

ll

J. W. McCaffrey, Chief, Public

Utilities Division

.,

Robert Newman, Office of Public

l

Counsel, State' of Illinois Center

'i

State Liaison'0fficer

Chairman, Illinois Commerce Commission

'

R. M. Thompson, Administrator, Wisconsin

Division of Emergency Government

.

W. Hodges, RI

-

J. Durr, RI

A. Gibson, RII

.!

.

C. Julian, RII

.'

S. Collins, RIV

T. Stetka, RIV

~l

K. Perkins, RV

y

L. Miller, RV

.)

E. Imbro, NRR

j

t

I

E

I

.)

l

5

- . - -

-

-

.

..

- -

f

i