Text
,.
,s 3
Northem States Power Company 4
414 Nicollet Mall Minneapolia. Minnesota 55401-1927 Teleptone (612) 355500 August 11, 1993 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 i
MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report July. 1993 Attached is the Monthly Operating Report for July,1993 for the Monticello Nuclear Generating Plant.
_ ?f,.,
l 64]([.
s.(// % 4 %
R,ger 0 Anderson Director Licensing and Management Issues c:
Director, Office of Resource Management Regional Administrator-III, NRC
'AR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment
/
9308160351 930731 F
PDR ADDCK 05000263 I
h'E
^
R PDR vuau
L OPERATING DATA REPORT v.
DOCKET NO.
50-263' DATE 8-2-93 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
-]
- 1. Unit Name :
Monticello
]
]
- 2. Reporting period:
July
)
-]
- 3. Licensed Thernal Power (MWt):
1670
)
]
- 4. Nameplate Rating (Gross MWe):
569
)
.]
j
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
=!
- 6. Maximum Dependable Capacity (Gross MWe): __564 1
]
'7. Maximum Dependable Capacity (Net MWe) :
536 1
]
8.. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last
,1 Report, Give Reasons-l
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A i
- 10. Reasons For Restrictions, If Any: __N/A
]
THIS MONTH YR.-TO-DATE CUMULATIVE-
-11. Hours In Reporting Period 744 5087 193608'
- 12. Number Of Hours Reactor Was Critical 722.6-
.3728.6 155713.3
- 13. Reactor Reserve Shutdown Hours 0.0' O.0 940.7
'14. Uours Generator On-Line 722'.6 3678.4 152954.6 1
15.. Unit Reserve Shutd.own Hours 0.0
- 0. 0
. 0.' 0 1
- 16. Gross Thermal Energy Generated (MWH) 1188523 5818873 235212286-
- 17. Gross Electrical Energy Generated (:MWH) 400179 1972684 79503484
- 18. Net Electrical Energy Generated (MWH) 382388 1889610 76045497 1
- 19. UnitLService Factor 97.1%
72.3%
79.0%.
20.' Unit Availability Factor
'97.1%
72.3%
79.0%:
i
- 21. Unit Capacity Factor (Using MDC Net) 95.9%
69.3%
73.3%-
'22. Unit Capacity Factor (Using DER Net) 94.2%.
68.1%
72.0%
j 23-._ Unit Forced Outage Rate 2.9%
2.2%
3.7%
2 4 -. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of'Each)
- None
-25. If Shut'Down At End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved.
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
'l i
U $.
P AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello._
DATE 8-2-93 l
COMPLETED BY
-H.
H. Paustian TELEPHONE.' 612/295-5151 ti e
i MONTH OF July 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 3
(MWe-Net)
(MWe-Net) 1 546.
17 534.
2
- 544, 18 532.
it 3
545.
19 533.
l f
4 545.
20 533.
5 543.
21 535.
6 542.
22 535.
7 542.
23 537.
8 543.
24 454.
9 542.
25 361.
10 540.
26 537;
-11 542.
27 527.
12
- 536, 28 536.
-13 535.
29
'536.14-538.
30' 535.
15 529.
31 48.
.16:
535.__
INSTRUCTIONS
-On this_ format, list the average daily unit power level in MWe-Net for each
. day in the reporting month.
Compute to the nearest;whole megawatt.
_ _. _ - _ _ = - _ _ _
--NARRATIVE
SUMMARY
DF' OPERATING EXPERIENCE l
p;.
DOCKET NO.
50-263.
.i l '
-DATE 8-2-93 I
COMPLETED BY H. H. Paustaan TELEPHONE 612/295-5151 l
MONTH JUL i
i 7-1-93 to Power operation.
7-24-93 7-24-93 i
to Power reduced to 30% to clean condenser tubesheets.
7-25-93 i
!l 7-25-93 to Power operation.
7-31-93 l
7-31-93 Reactor scram on level due to condensate pump trip.
E f
1 i
i l
2 Note: Power operation defined as-essentially 10'0%~of-
~i rated power except for. weekend load drops for-1 specifiec surveillance testing.
l
UNIT SHlTfDOUNS AND POWER REmK'fIONS DGGET $tD. 50-263 INIT NAME MonticE?io DATE 08-05-93 COMPLETED BT 1. H. Paustian REPORT Mormi July TELEPHONE 612/295-5151
- t Duration Reason Method LER System Comp.
Cause & Corrective No.
Date Ty(pe (hours)
(2) of No.
Code Code Action to 1)
Shutdown
.(4)
(5)
Prevent Recurrence (3) 5 07-24-93 S
0.0 B
4 N/A SG COND Power reduction to 30% to clean condenser tube sheets.
6 07-31-93 F
-21.4 A
3 93-008 SD 50 Automatatic reactor scram on level after conden-sate pump trip via ground fault relay.
1 2
3 4
Method:
Draft IEEE Standard F: Forced Reason:
- Manual 805-1984(P805-D5).
S: Scheduled
'A-Equipment Failure (Explain)'
' B-Maintenance or -Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)-
-*ww m-e4 iem vw h
w=w*
w rv to
- -v'*m w
1-w + Mm e s'
+-1**as mme et
'"N
'1 F *
1'M'
=
1" rv 9
e' 9-4++>-
T
""TP+
v
-4 h'-Y E-
- a ww e
N 4