ML20046C985

From kanterella
Jump to navigation Jump to search
Informs That Util Continues to re-evaluate Enduring & Recurring Commitments to Determine Applicability to Plant During Permanently Defueled Mode & Pol.Commitment Tracking Sys General CTS Repts Encl
ML20046C985
Person / Time
Site: Rancho Seco
Issue date: 07/15/1993
From: Shetler J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
DAGM-NUC-93-138, NUDOCS 9308130171
Download: ML20046C985 (41)


Text

{{#Wiki_filter:, -f l# l t. ',,m p"r - n ( )SMU = ^ SACRAMENTO MUMCIPAL UTIUTY DISTRICT C 6201 S Street. P.O. Box 15830, Sacrame o CA 958h2-1830, (916) 452-3211 AN ELECTRIC SYSTEM SE VING THE HEART OF CALIFORNIA DAGM/NUC 93-138 July 15, 1993 U. S. Nuclear Regulatory Commission Attn: B. Faulkenberry, Regional Administrator Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 Docket No. 50-312 j Rancho Seco Nuclear Station License No. DPR-54 j COMMITMENT UPDATE l

Reference:

J. Shetler (SMUD) to J. B. Martin (NRC) letter DAGM/NUC 92-172, dated July 10,1992, Deferral of Commitments . Attention: Mr. Faulkenberry The District continues to re-evaluate Enduring and Recurring commitments to determine their applicability to Rancho Seco during the Permanently Defueled. Mode (PDM) and with a Possession-Only License (POL) and submits the L enclosed reports. Enduring commitments are continuing closed commitments that the Rancho Seco staff generally implements through design documents, procedures, instructions, directives, or other plant documents. Recurring commitments are continuing closed commitments that the Rancho Seco staff meets through procedure development or revision. The District defines three categories of enduring and recurring commitments: 1. Those commitments still applicable to Rancho Seco during the PDM and with a POL Rancho Seco staff reviews these periodically, as appropriate, to determine their continued applicability. 2. Those commitments not applicable to Rancho Seco during the PDM and with a POL The District inactivated and archived these commitments l (see Attachment A). 19001S-9308130171 930715 ?7 PDR ADOCK 05000312 f3 l P PDR Q nANCHo SECo NUCLEAR GENERATING STATION O 14440 Twin Cities Road, Herald, CA 95638-9799; (209) 333 2935pg

. m. -- q .7 g w) n. ( g b Mr. Faulkenberry DAGM/NUC 93-138 L: 3. Those commitments that Rancho Seco staff recently evaluated for permanent closure. These include commitments that are complete and satisfy' permanent closure requirements, or commitments that are no longer applicable to Rancho Seco during the PDM and with a POL The District permanently closed and archived these commitments (see Attachment B). In Reference 1, the District concluded NRC Information Notices, Bulletins, and Generic Letters addressed to "All Holders of Operating (emphasis added) Licenses or Construction Permits for Nuclear Power Reactors" do not apply to Rancho Seco because Rancho Seco is permanently shut down and has a POL Consistent with this position, Rancho Seco staff reviewed Generic Letter 89-10,- Supplement 5, " Inaccuracy of Motor-Operated Valve Diagnostic Equipment," and determined it does not apply to Rancho Seco during the PDM and with a POL Additionaljustification is as follows: i 1. Spent Fuel Pool cooling compensatory measures do not rely on Motor-Operated Valve (MOV) operation, i 2. The In-service Confirmation Program contains no MOVs, and 3. Rancho Seco no longer has a MOV testing program. Members of your staff requiring additional information or clarification may contact Jerry Delezenski at (916) 452-3211, extension 4914. Sincerely, \\ h James R. Shetler Deputy Assistant General Manager Nuclear i Attachments cc: H. Wong, NRC, Walnut Creek Document Control Desk, NRC, Washington, D. C. j d _J

1 1 w w .4 1 i I i l i 1 1 l ATTACHMENT A i 4 1 1 l l 4 1 l l I i l l 1 4 i 1 l

O W W Printed: Runcho Seco Nuclear Generating Station Page: 1 06/28/93 Comitment Tracking System Report: CTS 7:27:24 General CTS Report Version: 080390 STDRPT1 Table: CTS s============================================================================================================================== CTS #: 10015 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 860425035 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A in POL Phase

Title:

IN 84-19-01, HYDROGEN ALARM PANEL (841901) Stage Date: 06/17/93 Stage Dept: Maint Agency: WRC Stage Due Date: Final Due Date: 12/31/86 Resp Dept: Maint Due Date Rev: 1 Manager: Brock, D. Sched Start Phone: 4570 Sched Finish: 12/31/86 Mall Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 12/31/86 Area: NM320 QA Reg'd? origin Dt: 04/25/86 Licensing Rea'd? : Originatr: R ep>rt able". Orig Dept: CCTS Closure?

L Storage box:

Hardware / Software:

== Description:== IN 84-19-01, HYDROGEN ALARM PANEL (841901) Requirements: NRC OFEW ITEM PREVENTIVE MAINTENANCE ON HYDROGEN PANEL ALARM NOT BEING PERFORMED. (ELECTRICAL)

Response

THE SEAL OIL SYSTEM LOCAL HYDROGEN ALARM PANEL HAS BEEN ADDED TO THE PREVENTIVE MAINTENANCE PROGRAM. THE FREVELTIVE MAINTENANCE WILL INCLUDE CLEANING RELAY CONTACTS AND FUNCTION TESTING OF ALL THE ALARMS AND ANNUNCI ATORS. Coments: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase because this system is abandoned. Related Doctznents: Doctsnent: Rev: CTS Code: CCTS Type: INTCOR 10/08/84 C: Closure Document ]N8419 0: Originating Docunent

\\ ) j (J y J ' Printed: Rancho Seco Nuclear Generating Station Page: 1 06/28/93 Comitment Tracking System Report: CTS 7:27:33 General CTS Report version: 080390 STDRPT1 Table: CTS am============-=================,===============,s============================================================================= CTS #: 10018 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 860428011 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A in POL Phase

Title:

IN 84-19-04 (841904) Stage Date: 06/17/93 Stage Dept: Maint Agency: NRC Stage Due Date: ] Final Due Date: 12/31/86 Resp Dept: Maint Due Date Rev 1 Manager: Brock, D. Sched Start: Phone: 4570 Sched Finish: 12/31/86 Matt stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 12/31/86 Area: NM320 QA Req'd? Origin Dt: 04/28/86 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== IN 84-19-04 (841904) Requirements: NRC OPEN ITEM EXPANDED REVIEW OF BACKUP SEAL REGULATOR OPERATION. (MECHANICAL)

Response

THE GENERATOR SEAL OIL SYSTEM WAS VERIFIED IN PROPER WORKING ORDER. THE BACKUP REGULATOR WAS REPLACED. C.0007, " GENERATOR SEAL O!L SYSTEM FAILURE" WAS REVISED. OPERATIONS CREWS HAVE BEEN INFORMED. CAUTION AND INFORMATION SIGNS HAVE BEEN PLACED ON THE SOS DRAIN REGULATOR TANK. Comments: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase because this system is abandoned. C.0007, Rev. 3 was volded 11/2/92, and not superseded. Related Docunents: Docunent: Rev: CTS Code: CCTS Type: C.7 PRO I: Implementing INTCOR 05/05/86 C: Closure Docunent i

.o. w. . ~ - - s ~g l ~ w-w .6 . Printed: Rancho Seco Nuclear Generating Station Paget '1 l .l07/15/93 Conunitment Tracking System Report: . CTS . 9:27:57. General CTS Report Version: 080390-

. )

STDRPT1 . Table: CTS- !i .j CTS #: 10019 Rev: r l . System: N/A Status

Closed I

Priority -f .XREF: PDQ #: DQ #: CCTS #: 860428012 LRSL #: Mig Pri

B-

' NRC Report: . j CTS Stage N/A in POL Phase - t

Title:

IN 84-19-05 (841905) Stage Date: 06/17/93' s Stage Dept: Maint 'l Agency: NRC Stage Due Date: ..l Final Due Date: 12/31/86; 8 . RIsp Depts Maint Due Date Rev: '1 Manager: Brock, D. Sched Start: Phone: 4570 Sched Finish: 12/31/86 i Mill Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: - 01/17/87 'l Area: NM320 QA Req'd?- . Origin Dt: 04/28/86 Licensing Req'd? : j Driginatr: Reportable?' -l l Orig Dept: .CCTS Closure?

L.

-) Storage Box: 8390 Hardware / Software- 'I cf D2scription: IN 84-19-05 (841905) Requirements: NRC OPEN ITEM DOCUMENTED MAINTENANCE HISTORY NEEDS TO BE DEVELOPED. (MECHANICAL) 1

Response

PROCEDURES AP.0650 WAS REVISED TO DOCUMENT MAINTENANCE HISTORY AND IDENTIFY TRENDS-i Conenents: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase because maintenance _ l history is not being trended. Trending is not needed at a permanently defuted plant because there are no active conponents that are Class 1. ' AP.650 was volded 7/31/87, and not superseded. {.i ' Ratated Documents: Document: Rev: ' CTS Code: CCTS Type: ~ NEP.5107.3 PRO-I Implementing AP.6'50 PRO I Inplementing AP.650 PRO C: Closure Docunent r - .) 1 11 -l i l r; v +

/' s GI y 4 ~ ' Printed: Rancho Seco Nuclear Generating Station Page: 1 06/28/93 Comitment Tracking System Report: CTS 7:27:50 General CTS Report version: 080390 STDRPT1 Table: CTS

===================================================================================================================

CTS #: 10077 Rev: System: N/A Status

Closed Priority :

XPEF: PDQ #: DQ #: CCTS #: 860428355 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A in POL Phase

Title:

IN 85-14 Stage Date: 06/17/93 Stage Dept: Maint Agency: NRC Stage Due Date: Final Due Date: 12/31/86 Resp Dept Maint Due Date Rev: Manager: Brock, D. Sched Start: Pnone: 4570 Sched Finish: 12/31/86 Mail Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 10/03/57 Arca: NM320 QA Req'd? Origin Dt: 04/28/86 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== IN 85-14 Requirements: IMPLEMENT EQ PROCEDURE. COMMENT: REASSIGNED TO C MERRIL 04/18/86. COMMENT PER MEMO DAA 86-0107 PREPARE AND ISSUE ADDITIONAL MAlWTENANCE PROCEDURES REQUIRED TOR FUTURE MAINTENANCE ACTIVITIES. SMUD IS COMMITED TO HAVE APPROVED PROCEDURES 30 DAYS PRIOR TO ANY REQUIRED MAINTENANCE ACTIVITY BEING PERFORMED. (MECHANICAL)

Response

MAINTENANCE ADMINISTRATION PROCEDURES IN PLACE TO COMPLY TO INSPECTION ITEM ENSURING APPROPPRIATE EQ REVIEW AND PLANNING PRIOR OF REQUIRED EQ MAINTENANCE ACTIVITIES. Coments: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase because there is no EQ program during POL. MAP.0009, Rev. 5 is active (ef fective 1/21/93). MAP.0006 was voided and superseded by RSAP-0803 (Rev. 8 currently effective.) There is nothing on EQ Review / Planning in the current revision of RSAP-0803. Related Doc m ents: Document: Rev: CTS Code: CCTS Type: MAP.0009 PRO 1: Inplementing MAP.0006 PRO 1: Implementing INTCOR 10/03/87 C: Closure Doceent IN8514 0: Originating Document

,,,i 2 .m.- ~ if J. j { g_ _j j y i + i 'f $Pr_inteds; Rancho Seco Nuclear Generating Station Page: 1 s 06/28/93 Conssitment Tracking Systom Report: ' CT$.

l

~7:27:59 -General CTS Report . Version: 080390 -l STDRPT1 Tables CTS. j -j ..m m m.m m m m..m m..m..m m m..m..m.......m.m.........m m.m m.m.m...m..m..m.m CTS #: 10117 Rev: } f System: 'N/A. Status

Closed f

Priority : XREF: PDQ #: DQ #: CCTS #: 861031103 LRSL #: Mig Pri

A

[ NRC Report: CTS Stage : N/A in POL Phase

Title:

IN 86-31 (841103) METEOROLOGICAL Stage Date: 06/17/93 Stage Dept: Maint-l -Agency: NRC Stage Due Date: ,j Final Due Date: 10/21/87 Resp Dept Maint Due Date Rev: '2 l Manager Brock, D. Sched Start: -f Phones 4570 Sched Finish: -10/21/87 1 Malt Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 12/08/87: i T Area: NM320 QA Req'd? origin Dt: 10/31/86 - Licensing Req'd? : 'f Originatr: Reportable? } Orig Dept: ~ CCTS Closure?

L-il

-Storage Box: Hardware / Software: [ i!

== Description:== IN 86-31 (841103) METEOROLOGICAL I . Requirements: THE LICENSEE SHOULD INSURE THAT BEARING ARE CHANGED ON REGULAR BASIS TO INSURE ACCURACY OPEN ITEM IN 84-11-03' l EPIC 07/63/56. (EMERGENCY PREPAREDNESS)

Response

THE WEATHERMEASURE/QUALIMETRICS CONTRACT #B859 SECTION 3.B.2 CONTAINS A REQUIREMENT THAT THE BEARINGS BE CHECKED REGULARLY. -(EMERGENCY PLANNING) I Conenents: Management reviewed the consnitment on 6/17/93, and determined it is N/A in the POL Phase because the MET j Station is no longer required. l -t Retsted Documents: Docunent: Rev: CTS Code: .CCTS Types EP871959 'C: Closure Document .1 IN8631 0: Originating Document I I e 1 -m e

>i IPrinted: Rancho Seco Nuclear. Generating Station x Page: 1 06/28[93 ' Consnitaent Tracking System . Report: CTS j 7:28:08 General CTS Report version: . 080390 STDRPT1 Table: CTS l J ....,m.......... . CTS #2 10331 Rev: System: N/A Status

Closed Priority :

'XREF: PDQ # DQ #: CCTS #: 870222201 LRSL #: Mig Pri

A-NRC Report:

. CTS Stage : N/A in POL Phase Iltle: LER 87-06, MOV OPERABILITY PROBLEMS /PM REQUIREMENTS Stage Date: 06/17/93 i Stage Dept Maint i i Agency: NRC Stage Due Date i Final Due Date: 06/01/87 Resp Dept: Maint Due Date' Rev: Manager: Brock, D. Sched Start: Phone: 4570 Sched Finish: 06/01/87 j Mall Stop: 253 Actual Starts-' Assigned: MANAGER - BROCK Actual Finish: ~ 08/19/87. 1 Area: NM320 'OA Req'd7 Origin Dt 02/22/87 Licensing Req'd?':. Originatre Reportable? j Orig Dept:' CCTS Closure?

L' i

Storage Box: Hardware / Software.

== Description:==

~ LER 87-06, MOV OPERABILITY PROBLEMS /PM REQUIREMENTS -

Requirements: MOV REQUIREMENTS SHOULD BE INCLt0ED IN THE PREVENTIVE MAINTENANCE PROGRAM PRIOR TO RESTART (PROGRAMS)

Response

MAP.0009 DESCRIBES PM REQUIREMENTS FOR MOVS. Consnents: Management reviewed the consnitment on 6/17/93, and determined it is N/A in the POL Phase because there is no PM being performed on MOVs. However, MAP.0009, Rev. 5 is active (effective 1/21/93). Related Documents: Docunent: Reva CTS Code: CCTS Type: ' MAP.0009 PRO I s'Inplementing MAP.0009 PRO C: Closure Document LER8706 0: Originating Docunent ~ NOI i i t i ) 'l 1 '1 s 1 i 'j .l f.]

e . - ~. .~ e -. g f.. i 10 1 '* Printed: Rancho Seco Nuclear Generating Station Page: 1, . 06/28/93 Comitment Tracking System . Reports CTS. l 7:28:16 Genera 1 CTS Report-version: 080390~ STDRPT1 --Table: CTS.; j -+ t . osassmassssassessme===sssssessmas s===sss===mmss============amassss===ss==========mssssssssssssssssssssemasssssssusassamassssas. ~ CTS #: 10356.Rev: ' System: N/A Status

Closed -

Priority : XREF: PDQ #: DQ #: CCTS #: 861110101 LRSL #: Mig Pri

B l

NRC Report; CTS Stage : N/A in POL Phase' N -Title: IEIN 86 092, PRESSURIZER SAFETY VALVE RELIABILITY Stage Date: 06/17/93. Stage Depts Maint. Tgency: NRC Stage Due Date: l Final Due Date: 08/01/88-' Resp Dept: Maint Due Date Rev: 2 Manager: Brock, D. Sched Start: l Phone: 4570 Sched Finish: 08/01/88 - l . Matt Stop: 253 Actual Start: i Assigned: MANAGER - BROCK Actual Finish: 08/23/88 -l . Area: NM320 QA Req'd? l Origin Dt 11/10/86 Licensing Req'd? : Originatra Reportable? j Drig Dept: CCTS Closure?

L?

Storage Box: Hardware /Softwere:

j

== Description:== IEIN 86-092, PRESSURIZER SAFETY VALVE RELIABILITY Requirements: EVALUATE INFORMATION NOTICE REGARDING POTENTIALLY SIGNIFICANT PROBLEM PERTAINING TO THE RELIABILITY OF l PRESSURIZER SAFETY VALVES. (BRUCE STIVER)

Response

MAINTENANCE REVIEW HAS DETERMINED THAT PROCEDURES M.0006Ai MT.0003 AND SP.0213 ADEQUATELY ADDRESS PROBLEMS .j IDENTIFIED IN lEIN 86-092. . Coments: Management reviewed the commitment on 6/17/93, and determined it is N/A in the POL Phase because the system is drained and layed up. M.0006A was voided 4/1/93. MT.0003 was volded 6/22/92. SP.0213 was volded 4/1/93. Retsted Documents: Document: Rev: CTS Code: CCTS Type: DAA870078 X: Cross Reference MPG 870037 X: Cross Reference PLNB80057 X: Cross Reference. IE1W86092 X: Cross Reference j IEIN88092 X: Cross Reference - PLN880115 X: Cross Reference. MNM880440 C Closure Document 'IEIW86092 0: Originating Document I i o -

5 4 . (O b / V 4 ' Printed: -Rancho Seco Nuclear Generating Station Page: 1 06/28[93 Comnitment Tracking System Report: CTS 7:28:26 General CTS Report version: 080390-STDRPT1 Table: CTS

===================================================================================================================

CTS #: 10357 Rev: i System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 870112300 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A _in POL Phase l

Title:

IEIN 86-102, REPEATED MULTIPLE FAILURES STEAM GEN HYDRAULIC $NUBBERS Stage Date: 06/17/93 Stage Dept: Maint Agency: NRC Stage Due Date Final Due Date: 04/25/87 Resp Dept: Maint Due Date Rev: Manager: Brock, D. Sched Start Phone: 4570 Sched finish: 04/25/87. Mail Stop: 253 Actual Start: Assigned: MANACER - BROCK Actual Finish: 08/21/87 Area: NM320 QA Req'd? Origin Dt: 01/12/87 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== 1EIN 86-102, REPEATED MULTIPLE FAILURES STEAM GEN HYDRAULIC SNUBBERS Requirements: REVIEW INr0RMATION. RE: REPEATED MULTIPLE FAILURES OF STEAM GENERATOR HYDRAULIC SNUBBERS DUE TO CONTROL VALVE SENSITIVITY. DETERMINE APPLICABILITY TO RANCHO SECO AND FOLLOWUP ACTIONS TO BE TAKEN DUE TO MANPOWER CONSTRAINTS. (MECHANICAL)

Response

VIA MEMO DATED 08/21/87 (B. STIVER 70 CCTS COORDINATOR), THIS DISTRICT HAS REVIEWED IEIN 86-102 AND FOUND IT i APPLICABLE TO RANCHO SECO. THE DISTRICT HAS BEEN IMPLEMENTING SP.0201.10 (SAFETT SYSTEM HYDRAULIC SNUBBER j FUNCTICNAL TEsi!NG) TO ADDRESS THESE CONCERNS. connents: Management reviewed the connitment on 6/17/93, and determined it is N/A in the POL Phase because snubbers are not being tested. SP.0201A&B were superseded by SP.203 and SP.204, which were voided 4/1/93. j Related Documents: Document: Rev: CTS Code: CCTS Type: ~ l SP.201.10B PRO I: Implementing INTCOR 08/21/87 C: Closure Docunent IEINS6102 0: Originating Docunent l l

..~ .. ~ ~. -- [4 < ~ 3 [ Printed:, Rancho Seco Nuclear Generating Station .Pages 1 l. 1 06/28/93 commitment Tracking System Report: CTS - t W '7:28:34 General CTS Report Version: 08G390 .' ? STDRPT1 Table: ' CTS ' \\,: . essn====sussssssssssssssssmus==ssssassassanssaan=======ss==sessasssssssssssssssssss==sssssssssssassseme====s====ssassmassessess ' l CTS #2 10388 Rev:. I l System: N/A Status ~ Closed. .. l Priority ; l XREF: PDQ #: DQ #: CCTS #: 861210235 LRSL #: Mig Pri

B WRC poport:

i CTS Stage N/A in POL Phase ~- l

Title:

LER 85-12, REV 1, LOSS OF REACTOR BUILDING INTEGRITY Stage Date: 06/17/93 'l ~, Stage Depts Maint; Agency: WRC Stage Due Dater j Final Due Date: 09/15/88 [ Rasp Depts Maint Due Date Rev: N nager: Wrocr, D. Sched Start: j Phone: 4570 Sched Finish: ,09/15/88. - Mill Stop: 253 Actual Starts Assigned: MANAGER - BROCK Actual Finish: 110/03/87 _[ Area: NM320 { QA Req'd? j ' origin Dt: 12/10/86 Licensing Req'd? : l l Originatra . Reportable? orig Dept: CCTS Closure?

L'

-l ' Storage Box: Marchsare/ Software. Dsscription: LER 85-12, REV 1, LOSS OF REACTOR BUILDING INTEGRITY -l Requirements: ITEM 4) ESTABLISH THE CRITERIA FOR THE MAINTENANCE INTERVAL VERSUS DOOR USAGE FOR THE PERSONNEL-ACCESS l -(MECHANICAL) (BRUCE STIVER)-- RIsponse: PM HAS BEEN IMPLEMENTED FOR THE CONTAINMENT PERSONNEL ACCESS WITH A 90 DAY INTERVAL WHILE SHUTDOWN. l H Consnents: Management reviewed the couritment on 6/17/93, and determined it is N/A in the POL Phase because Reactor. Building integrity is no longer required. 1j i i Related Docunents: Docunent: Rev: CTS Code: CCTS Type:

)

INTCOR C: Closure Document j j u i I.. l. l L a

O O w w ' Printed: Rancho Seco Nuclear Generating Station Page: 1 06/28/93 Comitment Tracking System Report: CTS 7:28:42 General CTS Report version: 080390 STDRPT1 Table: CTS

==================...====.....====================================================================================

CTS #: 10398 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 861125101 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A in POL Phase

Title:

IEIN 86-056, REL!ABIL17Y OF MAIN STEAM OAFETY VALVES Stage Date: 06/17/93 Stage Dept: Maint Agency: NRC Stage Due Dete: Final Due Date: 03/02/87 R;sp Dept: Maint Due Date Rev: Manager: Brock, D. Sched Start: Phone: 4570 Sched Finish: 03/02/87 Mail Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 11/02/87 Area: NM320 QA Req'd? Origin Dt: 11/25/86 Licensing Reg'd? : Originstr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software: Drscription: IEIN 86-056, RELIABILITY OF MAIN STEAM SAFETY VALVES Requirements: AS A RESULT OF TESTlWG DRESSER ISSUED RECOMMENDATIONS TO ESTABLISH NEW RlWG SETTING FOR 3707 AND 3777 VALVES THESE RECOMMENDATIONS ARE BElbG INCORPORATED INTO MT.006 AND MT.25 AT WHICH TIME IT 15 ANTICIPATED THAT THE RINGS WILL BE RESET TO THE NEW SPECIFICATION ALSP REFER TO IEIN86-005 AND T860715002C AND CTS 20.0197 (BRUCE STIVER) (MECHANICAL) l RIsponse PROCEDURES REVIS10NS ADDRESS NEW RING SETTING RECOMMENDATIONS Connents: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase because the system is drained, leyed up, and will be abandoned. Rstated Doctanents: Document: Rev: CTS Code: CCTS Type: M.25 PRO I: Implementing MPG 870067 C: Closure Doctanent !EIN86056 0: Origireting Document

. ~,.,. n P g. l 'g M. w ~ il 'Phlnted: Rancho Seco Nuclear Generating Station Page: 1 l c. . 06/28/93 Connitment Tracking System . Report: CTS i ( 7:28:51 General CTS Report version: 080390 l STORPT1 Table: CTS-l l. sessssssssssssssssssssssssssssssssssssssssssssesssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssses-CTS #: 10541 Rev: l System: N/A Status

Closed j

-l l: Priority : l; XREF: PDQ #: D0 # CCTS #: 870604302 LRSL #4 Mig Pri

A

.{ NRC Report: l CTS S'

  • N/A in POL Phase

Title:

LER 87-27, USE OF RPS SHUTDOWN BYPASS KEYS Stes C;tt 06/17/93 f Stage %. Maint-t Agency: WRC Stage Due Date: j Final Due Date: 08/15/87 .. t l. Rasp Dept: Maint Due Date Rev: 1- { Manager: Brock, D. Sched Start - Phones 4570 Sched Finish: 08/15/87-Mall Stop: 253 Actua Jtart: Assigned: MANAGER - BROCK Actual Finish: 10/28/87' Areat NM320 l QA Req'd? Origin Dt: 06/04/87 Licensing Req'd? : 'i Originatr: Reportable? ~ .l I Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software: l Dzscription: LER 87-27, USE OF RPS SHUTDOWN BYPASS KEYS Requirements: REVISE SURVEILLANCE PROCEDURE I.108A/B/C/D (OR ITS SUCCESSOR PROCEDURE SP406A/B/C/D) TO TEST THE HSHUTDOWN. j ' BYPAS$" FUNCTION ONLY MONTHLY WHILE THE REACTOR 15 NOT CRITICAL. TO BE DONE PRIOR TO HEATUP.'(ART BROWN

  • il PROCEDURES) (PROJECTS)

] Risponse: PROCEDURES WERE REVISED TO REQUIRE TESTING OF THE SHUTDOWN BYPASS FUNCTION MONTHLY ONLY WHILE THE PLANT IS

l NOT CRITICAL' Connents

Management reviewed the commitment on 6/17/93, and' determined it is N/A in the POL Phase because the RPS has l been sold (Abandoned, cuality Class 4). Procedures I.108A, B, C & D were volded 4/1/93, as were SP.406A,'B, 2I C & D. - Related Documents: Document: Rev CTS Code: CCTS Type: I !.108C PRO I' : ImptementIng 1.108A PRO 1: Inplementing i' 1.108P PRO I: luplementing I.1088 PRO I: Implementing-l l MPG 870038 -C: Closure Document LER8727 0: Originating Document l I .l i l l l i l

ad < j m

c

_g g

y E

YPrinted:, Rancho Seco Nuclear Generating Station' .Pages 1-j l06/28/93-Commitment Tracking System - . Report: CTS -7:29:00 General CTS Report . Version: 080390 3 STDRPT1 Tabte, CTS Lk CTS #: 10616 Rev: B SyEtem: N/A Status 3 Closed Priority : XREF: PDQ #: DQ #: CCTS # 860428009 LRSL #: ' Mig Pri B NRC Report CTS Stage : N/A in POL Phase.-

Title:

1N 85-23-04 ' Stage Date: 06/17/93K i Stage Depts Maint l Agency: NRC Stage Due Dates

, j Finst Due Date

01/01/88 Rrsp Dept: Maint Due Date Rev: 2 MLnager: Brock, D. Sched Start: Phone: 4570 Sched Finish: -01/01/88 j -Mall Step: 253 Actual Starts-f Assigned: MANAGER BROCK 'Actunt Finish: 12/08/87 ' Area: NM320 QA Req'd? Origin Dt 04/28/86 Licensing Reg'd?.: Originstra Reportable? Orig Dept: CCTS Closure? L. Storage Box: Nardware/Scftware: Dracription: IN 85-23-04

I Requirements: FAILURE TO PERFORM ADDITIONAL TEST AFTER RELIEF VALVE TEST FAILURE. ITEM IN 85-23-04. MT.003 AND MT.004_

WILL BE REVISED PRIOR TO RESTART TO INCLUDE SET POINT VERIFICATION (BRUCE STIVER) (MECHANICAL).. Risponse: PROCEDURES FOR RELIEF VALVE TESTING WERE REVISED TO ADDRESS "AS FOUND" SET POINT TESTING. ^ connents: Management reviewed the connitment on 6/17/93, and determined it is N/A in the POL Phase because the - procedures were volded. MT.003 and MT.004 were both voided 4/1/93. Related Doctanents: Docunent: Rev: CTS Code: .CCTS Type: j MT.004 PRO I: Implementing MT.003 PRO I: Implementing 1 1 MPG 870103 C : Closure Doctament. l l 4 g g L j r> .j

e- - LqJ J .s

Printedt, Rancho Seco Nuclear Generating Station Page:

1 -96/28/93 Comitment Tracking System Report: CTS 7:29:09 General CTS Report version: 080393 STDRPT1 Table: CTS

===================================================================================================================

CTS #: 10635 Rev: i System: N/A Status Closed Priority.: XREF: PDQ #: DQ #: CCTS #: 861106287 LRSL #: Mig Pri

A NRC Report:

CTS Stage : N/A in POL Phase

Title:

PART 21 REPORT (8502P) Stage Date: 06/17/93 Stage Dept: Maint Agency: NRC Stage Due Date: Final Due Date: 12/07/87 Resp Depts Maint Due Date Rev: Kanager: Brock, D. Sched Start Phone: 4570 Sched Finish: 12/07/87 Mall Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 10/27/87 Area: NM320 QA Req'd? Origin Dt: 11/06/86 Licensing Reg'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== PART 21 REPORT (8502P) Requirements: REVIEW 10CFR21 REPORT REGARDING ANACON CL-2 MONITOR FOR APPLICABILITY TO RANCHO SECO (R DOBSON). DUE DATE CHANCED TO ALLOW FOR NRC REVIEW. (PROJECTS)

Response

PM HAS BEEN SCHEDULED FOR EACH 2 WEEKS. Coments: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase because the CL-2 monitors are turned off. They are not required because of site chlorine limits. Related Documents: Document: Rev: CTS Code CCTS Type: PM TASK 6641 1: Implementing MPG 870019 C: Closure Docunent 10CFR21.850107 0: Originating Document i i

= O M w w

  • Printed:

Ratho Seco Nuclear Generating Station " age: 1 06/28[93 Commitment Tracking System Report: CTS 7:29:18 General CTS Report Version: 080390 STDRPT1 Table: CTS

wss==========================================================================================================================

CTS #: 10693 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 870119307 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A in POL Phase

Title:

IN 86-06 & IN 86-07, NOV RESPONSE Stage Date: 06/17/93 Stage Depts Maint Agency: NRC Stage Due Date: Final Due Date: 05/01/87 Resp Dept: Maint Due Date Rev: ranager: Brock, D. Sched Start: Phone: 4570 Sched Finish: 05/01/87 tail Stop: 253 Actual Start: Assig wd: MANAGER - BROCK Actual Finish: 12/08/87 Area: NM320 QA Req'd? Origin Dt: 01/19/87 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== IN 86 06 & IN 86-07, NOV RESPONSE Requirements: DOCUMENT THE RESULTS OF VALVE MAINTENANCE, INSPECTIONS, TESTING, AND OPERATIONS TO VERIFY THE OPERATIONAL READINESS OF PLANT VALVES.

Response

COMPLETION OF ONGOING VALVE MAINTENANCE IS DOCUMENTED THROUGH THE PM PROGRAM. ALL CATEGORY 1 VALVES HAVE BEEN INCLLDED IN THE PN PROGRAM. Coments: Management reviewed the commitment on 6/17/93, and determined it is N/A in the POL Phase because there are no longer Category 1 valves listed in RSAP-0803. Related Documents: Doctrnent: Rev: CTS Code: CCTS Type: HPG870096 C: Closure Document

.~ ~ 4 W 9 J w-ws w.. 9 I Printed: ' Rancho Seco' Nuclear' Generating Station ' Page: 1] f l06/28/93 Cceanitment Tracking System Report: CTS .7:29:26-General CTS Report version: 080390 I STDRPT1 Table: CTS' . ompassessamanassumessassmassusssssssssssssssssssssssssssssssssssssssssssssssammasasessamasassssssssamamassamassassssesmuzzassas . CTS #1-10774' Rev: System: N/A Status

Closed

'i [ Priority. : XREF: PDQ # DQ #: CCTS #: 870312369 LRSL # Mig Pri : B NRC Report: i ' CTS Stage ~ N/A in POL Phase- [

Title:

INPD SOER 83-09, REC 08

Stage Date: 06/16/93 Stage Depts Info Sycs Agency:

.INPO Stage Due Dates Final Due Date: 09/30/88 l Resp Dept: Info Sycs Due Date Rev: 4 '{ Manager: Ebberts, D. Sched Start I ' Phone: 5272 Sched Finishi 09/30/88i Matt Stop: 28 Actual Start: Assigned: MANAGER - EBBERTh Actual Finish 111/11/88 55 .' Area: NM220 QA Req'd? Origin Dt: 03/12/87 Licensing Req'd? : -[ Originatr: Reportable? 'i Orig Dept: CCTS Closure?

L-

-[' Storage Box: Hardware / Software:

== Description:== INPD SOER 83-09, REC 08 Requirements: REVIEW RECOMMENDATION RE PERFORMANCE OF POST MAINTENANCE AFTER ANY MAINTENANCE ACTIVITT THAT MIGHT AFFECT - I VALVE OPERABILITY. ACTION: -ISSUE MAP.0006 REV 5 TO INCORPORATE A TEST MATRIX. (PROCEDURES - YEtt.10TT) j

Response

MAP.0006, REV 5, PAGE 87 INCORPORATES A' TEST MATRIX FOR MOTOR OPERATED VALVES TO BE USED TO ASSIST THE WORK PLANNER IN DETERMINING POST MAINTENANCE TEST REQUIREMENTS. Comments: Management' reviewed the conunitment on 6/16/93, and determined it is N/A in the POL Phase because the test matrix for MOVs is not in RSAP-0803, Rev. 8. (Map-006 was volded and replaced by RSAP-0803.)' There are no. l conunitment documents listed in RSAP-0803. 'l .i - Related Documents: Docunent: Rev CTS Code: CCTS Type: ~ MAP.0006 PRO I Inplementing ]NPD $0ER8309 X: Cross Reference MPG 870081- -X: Cross Reference PLN880057 X: Cross Reference- .. j DPS870004 -X : Cross Reference RB70312369 C: Closure Doctanent 1 l

\\

i I

g . Printed;, Rancho Seco Nuclear Generating Station Page: 1'- l - 06/28/93 comitment Tracking System Report: CTS q 7:29:35 General CTS Report Version: 080390 STDRPT1 Table: CTS i .i, . CTS #: 10928 Rev ' i System: N/A Status Closed Priority : l XREF: PDQ #2 DQ #: CCTS #: 870424133 LRSL #: Mig Pri

A

_g MRC Report: j CTS Stage : N/A in POL Phase

Title:

IN 86-41 12, PR0ptEM 12, 120VAC LOCAL INDICATION BREAKER STATUS (864112) Stage Date: 06/17/93' Stage Depts Maint' l 11 Agency: NRC Stage Due Date: -) Final Due Date: 12/07/87 Resp Dept: Maint Due Date Rey: Kanager: Brock, D. Sched Starts ^l . Phone: '4570 Sched Finish: 12/07/87 l Malt Stop: 253 Actual Start -j Assigned: MANAGER - BROCK Actual Finish: 12/11/87 ' Areat NM320 l { QA Req'd?. I - Origin Ot: 04/24/87 Licensing Req'd?.: Originatr: Reportable? i p c Orig Dept: CCTS Closure? L: Storage Box: ' Hardware / Software: 'i i

== Description:== IN 86-41 12, PROBLEM 12, 120VAC LOCAL INDICATION BREAKER STATUS (864112) { Requirements: ADDRESS 120VAC SYSTEM PROBLEM RELATING TO LOCAL INDICATION OF 120V AC BREAKER STATUS. AN OVERVIEW STt27 WILL r l BE DONE TO PROVIDE A RESOLUTION OF IDENTIFIED CONCERNS. QTS 26.0356. PRIORITY 2R.DUE DATE CHANGE TO ALLOW TOR 't NRC REVIEW.NEMD FROM W.E. REQUESTED MAINT. TO FAINT. WHITE MARK ON BREAKERS TO A!D IN TRIP INDICATION. -f (PLANNING) j

Response

PER ACTION FROM ASRTP 11 INSPECTION, WHITE LINES WERE PAINTED ON BREAKERS TO IMPROVE POSITION INDICATION. 'l ' Coments: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase because this item is.' -f no longer a concern.

j b

-l . Related Docunents: Document: Rev: CTS Code: CCTS Types MPG 870112 .C: Closure Document _j F -h

3

.t t 5 i .. l i.l '1 .l I !, i ~ L

p 'V 4 ' Printed:, Rancho Seco Nuclear Generating Station Page: 1 06/16/93 Comnitment Tracking System Report: CTS 7:29:43 General CTS Report Version: 080390 r STDRPT1 Table: CTS

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

CTS #: 11007 Rev: System: N/A Status

Closed Priority a XREF: PDQ #:

DQ #: CCTS #: 870424165 LRSL #: Mig Pri

A NRC Report:

CTS Stage : N/A in POL Phase

Title:

IN 86-41-36, AIR OPERATED VALVE MAINT PROC Stage Date: 06/17/93 Stage Dept: Info Sves Agency:

NRC, Stage Due Date:

Final Due Date: 02/10/88' Resp Dept: Info Sycs Due Date Rev: 4 Manager: Ebberts, D. Sched Start Phone: 5272 Sched Finish: 02/10/88 Matt Stop: 28 Actual Start: Assigned: MANAGER - EBBERTS Actual Finish: 03/10/88 Area: NM220 QA Req'd? Origin Dt: 04/24/87 Licensing Req'd? : l Originstr: Reportable? Orig Dept: CCTS Closure?

L t

Storage Box: Hardware / Software:

== Description:== IN 86-41-36, AIR OPERATED VALVE MAINT PROC Requirements: ACTION IS TO COMPLETE PROCEDURES M186 AND A187. PROCEDURES M-165A, B AND M181-185 AND M-188 HAVE BEEN-COMPLETED. (PROCEDURES - YELLIOTT) l

Response

MAINTENANCE PROCEDURES APPLICABLE TO CATEGORY 1 AIR OPERATED VALVES ARE COMPLETE AND CURRENTLY CFFECTIVE. APPLICABLE PROCEDURES M-181, M-182, M-183, M-184, M-185, M-186, M-187, M-188, M-165A & M-165B ARE ISSUED FOR ADV MAINTENANCE. Comments: Management reviewed the connitment on 6/17/93, and determined it is N/A in the POL Phase because these procedures will be volded as systems are put in SAFSTOR (abancbned). Procedures M-181 through M-188 are 1:, effect, and M-165ALB are Inactive, as of 3/17/93. l Related Docunents: Document: Rev: CTS Code: CCTS Type d,183 PRO I Inplementing M.165A PRO I: Inplementing j M.187 PRO I: Implementing M.185 PRO I: Inplementing j M.181 PRO I: Implementing l M.165B PRO I: Inplementing M.188 PRO I: Inplementing i M.184 PRO I: Implementing M.182 PRO I: Implementing M.0186 PRO I: Implementing ADV MAINT. PRO C: Closure Document i I

.+, 4 t. -t

  • Printed:~

Rancho Seco Nuclear' Generating Station Page: 1 07/15/93 Commitment Tracking System Report: CTS 9:28:01 General CTS Report: Version: 080390 STDRPT1 Table: . CTS i omos s an== = s e s s as s ass==ss s ss ss = = wass=== === =s s = = s es=== =s se m as s ======= =======ss=========== = s============ ========ss = === ======3ss=== CTS # 11113 Rev 1 System: N/A Status-

Closed:

Priority : I XREF: PDQ #: DQ #: CCTS #: 861210212 LRSL #: Nig Pri - : 8 WRC Report: CTS Stage N/A in POL Phase

Title:

LER 86-20 Stage Date: 06/16/93 I Stage Dep's Tech Sycs i Agency: NRC Stage Due Date: Final Due Date: 12/01/86-Resp Dept: Tech Sycs Due Date Rev: 1-Manager:.. Field, J. Sched Start:, .j Phone: 4038 Sched Finish: 12/01/86 Malt Stop: 231 Actual Start: " Assigned: MANAGER - PEABODY Actual Finish: 09/21/87- { Area NM400 QA Req'd? - 1 . l ~0rigin Dt 12/10/86 Licensing Reg'd?. Originntr Reportabte7 Orig Dept: CCTS Closure? L Storage Box: 8398 Hardware / Software: 'f

== Description:== LER 86-20.. Requirements: THE DELETED AP.56 SECTION 3.10 WILL BE INSTERTED BACK INTO THE PROCEDURE AFTER PROPER REVISION ONLY.1F IT { PROVIDES CORRECT CORE DAMAGE ASSESSMENT RESULTS. Respor,ae: THIS COMMITMENT WILL BE MADE PERMANENT. NO ACTION CAN SE TAKEN UNLESS PROCEDURE AP.0056 SECTION 3'.10 WILL BE I REINSERTED. consnents: Management reviewed the commitment on 6/16/93, and' determined it is N/A in the POL Phase because AP.56 is void!.It was supersede'd by EPIP.5395, which is also void. Core damage assessment is not required for a plant .j in the permanently defueled ande. "] - Related Documents: Document: Rev: CTS Code: CCTS. Type: AP.56 PRO-1: Inptementing.- R861210212 C: Closure Document j LER8620 0: Originating Doctanent - .j I l i

g g w w ' Printed:. Rancho seco Nuclear Generating Station Page: 1 06/28/93 Commitment Tracking System Report: CTS 7:30:01 General CTS Report version: 080390 i STDRPT1 Table: CTS sesmasassassassansassassassassssssssssssssssmasassessassssssssssssssssmazzassssssssssazzzmusssssssssssssssssssssssssssssssssses CTS #: 11311 Rev: Systest: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 870831400 LRSL #: Mig Pri

A NRC Report:

CTS Stage : N/A in POL Pbese

Title:

IN 87 13-03, ACCEPTANCE CRITERI A NOT INCLUDED IN SPECIAL PROCESS WORK Stage Date: 06/17/93 Stage Dept: Maint Agency: NRC Stage Due Date: Final Due Date: 09/14/87 RIsp Dept: Maint Due Date Rev: 1 Manager: Brock, D. Sched Start: Phone: 4570 Sched Finish: 09/14/87 Malt Stop: 253 Actual Start: Aisigned: MANAGER - BROCK Actual Finish: 10/06/87 Area: NM320 QA Reg'd? Origin Dt: 08/31/87 Licensing Req'd? : Originatra Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== IN 87-13-03, ACCEPTANCE CRITERI A NOT INCLUDED IN SPICIAL PROCESS WORK Requirements: INSTRUCT PLANNING PERSONNEL TO RECOGNIZE AND TO INCLUDE THE APPROPRIATE QUANTITATIVE AND QUALITATIVE ACCEPTANCE CRITERIA FOR ALL SPECIAL PROCESSES. (PLANNING) Responses MAINTENANCE PLANNERS NAVE COMPLETED READING AS$1GNMENT QAP.009, SPECIAL PROCESSES. Conments: Management reviewed the commitment on 6/17/93, and determined it is N/A in the POL Phase because there is no trending being done. CAP 009 is an unknown procedure. QA!P-009, "Trerd-oriented QA Program," was volded 8/31/87. Related Doctsnents: Doctanent : Rev: CTS Code: CCTS Type: PLN870097 C: Closure Doctanent

m g d w Printed: Rancho Seco Nuclear Generating Station Page: 1 06/29/93 Commitment Tracking System Report: Ci$ 13:48:02 General CTS Report version: 080390 STDRPT1 Table: CTS

u============================================================================================================================

CTS #: 11522 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 870729021 LRSL #: Mig Pri

B WRC Report CTS Stage : N/A in POL Phase

Title:

ANI TRIENNIAL FIRE PROTECT!DN AUDIT / REINSPECTION, 07/13/87, REC 87-02 Stage Date: 06/24/93 Stage Dept: Tech Sves Agency: ANI Stage Due Date: Final Due Date: 10/27/87 Reap Cept: Tech Sycs Due Date Rev: 1 Manager: Field, J. Sched Start: Phone 4038 Sched Finish: 10/27/87 Mail Stop: 231 Actual Start: Assigned: MANAGER - PEABODY Actual Finish: 10/27/87 Area: NM400 QA Req'd? Origin Dt: 07/29/87 Licensing Req'd? : Originstr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== ANI TRIENNI AL FIRE PROTECTIDW AUDIT / REINSPECT 1DN, 07/13/87, REC 87-02 Requirements: REVISE PROCEDURE AP.30 PER AN! RECOMMENDAT10N 87-2

Response

THIS COMMITMENT COVERED BY T871027101. SEE ALSO THE RESPONSE TO THIS ANI AUDITS AGM/NPP 87-0303 Coments: Management reviewed the comitment on 6/24/93, and determined it is N/A in the POL Phase. T871027101 was automatically cancelled at POL because it had been deferred. This comitment is also N/A in POL. Related Documents: Document: Rev: CTS Code: CCTS Type: AP.30 PRO I: Implementing T871027101 C: Closure Document i i

Printed:, Rancho Seco Nuclear Generating Station Page: 1 06/29/93 Comitment Tracking System Report: CTS 13:48:06 General CTS Report Version: 080390 STDRPT1 Tables CTS CTS #: 11589 Rev: -l System: N/A Status

Closed Priority XREF: PDQ #

DQ #: CCTS #: 871228700 LRSL #: Mig Pri

A NRC Report:

CTS Stage : N/A in POL Phase

Title:

PROCEDURAL IMPLEMENTATION OF PA 159 AND PA 164 Stage Date: 06/24/93 Stage Dept: Info Sves Agency: SMUD Stage Due Date Final Due Date: 12/31/88 Resp Dept: Info Sves Due Date Rev: 5-Manager: Ebberts, D. Sched Start: ~ Phone: 5272 Sched Finish: 12/31/88 Mall Stop: 28 Actual Start: Assigned: MANAGER - EBBERTS Actual Finish: 02/08/89 Area: NMD0 QA Reg'd? Origin Dt: 12/28,87 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure? L Storage Box: Hardware / Software:

== Description:== PROCEDURAL IMPLEMENTATION OF PA 159 AND PA 164 Requirements: 1) PERMANENTLY INCORPORATE PICN-01 TO I.111 INTO SP.435 A THROUGH D 2) PERMANENTLY INCORPORATE REV 3 0F 1-65 A & B INTO SP.436 A & B 3) PERMANENTLY INCORPORATE PICN-04 TO l-042 INTO SP.481 AND INCORPORATE PICN-01 INT 0 SP.446. (PROCEDURES - TELLIOTT)

Response

PA 159 AND PA 164 MAVE BEEN IMPLEMENTED BY I.111, REV 19, SP.4364, SP.4368, SP.481, SP.446A, SP4468, SP.3 AND SP.4. 1.111 IS EXPECTED TO BE INCORPORATED INTO SP.435 SERIES. Comments: Management reviewed the comitment on 6/24/93, and determined it is N/A in the POL Phase because SP.435 A-C were never issued, and SP.435D, SP.436 A&B are inactive. Related Documents: Docunent: Rev: CTS Code: CCTS Type SP.481 PRO I: I glementing PA.164 1: Implementing SP.4 PRO I: ! @tementing SP.4364 PRO I: Implementing SP.446B PRO 1: Implementing I.111 PRO I: Implementing SP.446A PRO 1: Implementing SP.4368 PRO I: Imtementing SP.3 PRO I: Implementing PA.159 1: Implementing R871228700 C: Closure Document I AGM/NPP870457 0: Originating Document u

C, g g-j w: w- ' Printadt, Rancho Seco in.acLeae Generating Station Page: 1' '06/28/93 Comitment Tracking System Report: . CTS 7:30:09 General CTS Report - Version: 080390 STDRPT1 Table: CTS? l acess sues s ssenessmassassammasssessmu sassazzassassassassa:ssss s ssssssssss ssammassesamu ssammassmussssssmaassssmussmuasssssssssssau CTS #:..11595 Rev: System: N/A -Status

Closed Priority :

'XREF: PuQ #: DQ #: CCTS #: 871229001 LRSL #: Mig Pri

A NRC Report:

CTS Stage : N/A in POL Phase Vitle: PART 21 REPORT (8709P) Stage Date: 06/17/93 l Stage Depts Maint ~I, ' Agency: NRC Stage Due Date: { Final Due Date: 08/01/89 Resp D @t: Maint Due Date Rev: 3 Manag'er: Brock, D. Sched Starts-i Phore: 4570 Sched Finish: 08/01/89. Mail stop: 253 . Actual Start: Assl M : MANAGER - BROCK Actual Finish 04/03/89 t Area: 'M320 QA Req'd? . Origin Dt: 12/29/87 Licensing Req'd? : i Originatr: Reportable? Orig Dept: CCTS Closure? - ' : L Storage Box: . Hardware / Software:

== Description:== PART 21 REPORT (8709P) Requirements: REVISE PROCEDURES EM.126 A&B PRIOR TO PERFORMANCE IN THE CYCLE 8 REFUELING OUTAGE. CHANGE SHOULD INCLtJDE THE l ~ ADDITION OF STEP 6.3.1 AS STATED IN THE PROCEDURE REQUEST FORMS APPROVED 12/07/87. THIS REVISION IS REQUIRED TO MEET A COMMITMENT REGARDING.10CFR21 REPORT 87-09-P ON NORMALLY ENERGIZED SQUARE D RELATS.

Response

PROCEDURES EM.126A & EM.1268 WERE REVISED IN RESPONSE TO THIS PARTICULAR 10CFR21 REPORT. ADDITIONAL CORRECTIVE AC110NS ARE BEING TAKEN IN RESPONSE To SER 87-22 AND CCTS 7890324807. Coments: Management reviewed the connitment on 6/17/93, and determined it is N/A in the POL' Phase because EM.126A&8 were voided 8/6/92, and not stperseded. Management previously reviewed CTS #890324807 treferenced above) and determined it is N/A in the POL Phase. Related Doctmenta: Document: Rev: CTS Code: . CCTS Type: EM.126A PRO 'I: Inplementing EM 1268 PRO I: Implementing i EM.1268 PRO X Cross Reference EM.126A PRO X: Cross Reference- [ 8709P. X i Cross

Reference:

'{ PLN880057 X: Cross Reference MNM890237 'C: Closure Doctment 10CFR21.020487 0: Originating Doctment + .i l T

+ e+- L -4 4 ) r A .a '9 w e, - Printed: Rancho Seco Nuclear Generating Station Paget' -1 1 06/29/93 consnitment Tracking System . Report: CTS 13:48:11. General CTS Report version: !080390 STDRPT1-Tables l CTS- sautansesssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssses ' ,l - CTS #: 11652 Rev: d System: N/A Status - : Closed'-

Priority

'XREF: PDQ #: DQ #: CCTS #: 880125301 LRSL #: Mig Pri

B NRC Report:

'i

CTS Stage : N/A in POL Phase

Title:

LER 84-21, REV 3, FAILURE TO IMPLEMENT IN-SERVICE TESTING OF SAFETY VALVES _ Stage Date: 06/24/93 Stage Dept: Info Sycs [ Agency: NRC . Stage Due Dates Final Due Date: ' 07/28/88-Resp Dept Info Sves Due Date Rev: 3 -- . Kanager: Ebberts, D. Sched Start: Phone: 5272 Sched Finish: 07/28/88- + I Mall Stop: 28 Actual Starts t Assigned: MANAGER - EBBERTS . Actual Finish: ' 06/15/88 - Areat WM220 l QA Req'd? Origin Dt: 01/25/88 Licensing Req'd? : Originstra ~ Reportable?.. ] Orig Dept CCTS Closure?

L-Storage Box:

Hardware / Software-s

== Description:== LER 86-21, REV 3, FAILURE TO IMPLEMENT IN SERVICE TESTING OF SAFETY VALVES Requirements: REVISE SP 28 A & B TO INCLUDE MANUAL STROKE TESTING OF VALVES SIM 78, SIM 79 AND SIM 81. REF. QTS ITEM 20.0134 AND CCTS ITEM T870119204C. A TEMPORARY REVISION HAS BEEN MADE TO SP.28 WHICH INCORPORATES THESE VALVES. THIS - ITEM WILL CLOSE WHEN IT BECOMES PERMANENT. (PROCEDURES - YELLIOTT)

Response

VALVE STROKE TESTING FOR SIM-78, SIM 79 AND SIM-81 HAS BEEN INCLUDED INTO REVISION 1 0F SP.28A, SP.288,- SP.28C (PROCEDURES - YELLIOTT) Consnents: Management reviewed the consnitment on 6/24/93, and determined it is N/A in the POL Phase because procedares SP.28A, 8, and C are inactive. f Related Documents: Docunent: Rev: CTS Code: CCTS Type: SP.38B PRO I: Inplementing SP.38A PRO I: Imptementing .SP.38C PRO ' I: Inplementing j MPP880079 X: Cross Reference ~ ~LER8621 REV 2 X: Cross Reference; GCA870096 =X: Cross Reference MPP880259 'X: Cross Reference ' l QTS 20.0134

X
Cross Reference

'DPS870004 X: Cross Reference > LER8621 X: Cross Reference GCA870340-X: Cross Reference 50ER8406 X: Cross Reference T870119204 'X Cross Reference - P2-410-X: Cross Reference I 'OA8508 X: Cross Reference l { RSL 4026 X: Cross Reference 8621L3-X: Cross Reference SP.28A SP.288 SP.28C PRO X: Cross Reference GT880034 - X: Cross Reference. . GY880034~- C: Closure Document

+ (x G .g-a ' Printed: Rancho Seco Nuclear Generating Station Page: 1 06/28/93 Comitment Tracking System Report: CTS 7:30:19 ceneral CTS Report version: 080390 STDRPT1 Table: CTS

===================================================================================================================

CTS #: -11718 Rev: System: N/A Status Closed Priority : XREF: PDQ #: DQ #: CCTS #: 880229101 LRSL #: Mig Pri

B NRC Report:

i CTS Stage : N/A in POL Phase

Title:

APPENDIX R COMPENSATORY MEASURES Stage Date: 06/17/93 Stage Dept: Maint Agency: NRC Stage Due Date: Finat Due Date: 03/31/88 Resp Dept: Maint Due Date Rev: 3 Manager: Brock, D. Sched Start: Phones 4570 Sched Finish: 03/31/38 t Mall Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 03/30/88 Area: hM320 QA Req'd? Origin Dt: 02/29/88 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== APPENDIX R COMPENSATORY MEASURES Requirements: INSTALL 3-HOUR F]RE WRAP DN ONE TRAIN OF CABLES IN FIRE AREA 70 TRANSFORMER ALLEY. (MODIFICAT]ONS)

Response

3 HOUR FIRE WRAP WAS INSTALLED PER ECW R-2714 AND WR 137494 Connents: Management reviewed the connitment on 6/17/93, and determined it is N/A in the POL Phase because Appendix R is N/A. R-2714 was closed 3/28/88. Related Docunents: Document: Rev: CTS Code: CCTS Type: ECN R2714 I: Inptementing ECN R2714 C: Closure Docunent GCA880082 0: Originating Docunent i ll 1 i r h J l

( ,/ ( U 3 s %0 e 'Printei Rancho Seco Nuclear Generating Station Page: 1 06/28/93 Comitment Tracking System Report: CTS -7:30:27 General CTS Report version: 080390 STDRPT1 Table: CTS

===================n===============================================================================================

CTS #: 12209 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 881021800 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A in POL Phase

Title:

SER 23-88, COMMENT 4, WORK ON WRONG TRAIN RADWASTE EVAPORATOR /PERS INJURY Stage Date: 06/16/93 Stage Dept: Info Sves Agency: INPO Stage Due Date: Final Due Date: 12/30/88 Resp Dept: Info Sycs Due Date Rev: 1 Manager: Ebberts, D. Sched Start: Phone: 5272 Sched Finish: 12/30/88 Mail Stop: 28 Actual Start: Assigned: MANAGER - EBBER15 Actual Finish: 11/07/88 Area: NM220 QA Req'df Origin Dt: 10/21/88 Licensing Req'd? : Originatr: Reportablef Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== SER 23-88, COMMENT 4, WORK ON WRONG TRAIN RADWASTE EVAPORATOR /PERS INJURY Requirements: INCLLOE " EQUIPMENT VERIFICATION FORM" INTO MAP.0006 (YELLIOTT, MS 208-107)

Response

EQUIPMENT VERIFICATION FORM WAS ADDED TO MAP.0006, REV 5. Coments: Managenent reviewed the comitment on 6/16/93, and determined it is N/A in the POL Phase because the equipment verification form was deleted from RSAP-0803, which replaced MAP-006 when it was voided. Related Doctraents: Docunent: Rev: CTS Code: CCTS Type: MAP.0006 PRO 1: Implementing R881021800 C: Closure Document-SER2388 0: Originating Document 1 1 ) i i j

4 (wg O (w/ I

  • Printed:

Rancho Seco Nuclear Generating Station Page 1 06/28/93 Connitment Tracking System Report: CTS 7:30:36 General CTS Report Veraton: 080390 STDRPT1 Table: CTS 333335E33333333333333333333333333329333333333333332E2233 E E5EE33333333333333 E 3R333335335333E323533E53E25333333333333333333583333 ' CTS #: 12301 Rev: System: N/A Status

Closed Priority :

XREFs PDQ #: DQ #: CCTS #: 881123038 LRSL #: Mig Pri

A i

NRC Report: l CTS Stage : N/A in POL Phase l

Title:

INPO EVALUATION RESPONSE, FINDING DE.4-1 Stage Date: 06/17/93 Stage Dept Maint Agency: INPO Stage Due Date: Final Due Date: 01/31/89 Resp Dept: Maint Due Date Rev: 3 Manager: Brock, D. Sched Start Phone: 4570 Sched Finish: 01/31/89 [ Mall stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish; 02/10/89 Area: NM320 QA Req'd? Origin Dt: 11/23/88 Licensing Req'd? : Orlpinstr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== INPO EVALUATION RESPONSE, FINDING DE.4-1 Requirements: REVISE MEL PROCEDURE (RSAP.0306) BY 01/89 TO ENSURE FUTURE MEL ADDITIONS ADDRESS NPRDS REPORTABILITY.

Response

MEL PROCEDURE RSAP.0306, REV 2 STEP 6.5 ADDRESSES NPRDS REPORTABILITY FOR MEL ADDITIONS. j Comnents: Management reviewed the connitment on 6/17/93, and determined it is N/A in the POL Phase because RSAP-0306, Rev. 7, Section 6.5 "NPRDS Data Administration," says that NRPDS is not maintained during the long term defueled condition. Related Docunents: Doctanent: Rev: CTS Code: CCTS Type: RSAP.0306 REV 2 PRO 1: Isplementing RSAP.0306 PRO I: Inplementing RSAP.0306 PRO C: Closure Document 4 I J I

a m w b Printed; Rancho Seco Nuclear Generating Station Pages 1 06/29/93 Conunitment Tracking System Report: CTS 13:48:16 General CTS Report Version: 080390 STDRPT1 Table: CTS

================....================================================================================================

CTS #: 12444 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 881229018 LRSL #: Mig Pri

A NRC Report:

CTS Stage : N/A in POL Phase

Title:

IN 88-30, RESPONSE, PDQ 88-0110 ISSUE 1 Stage Date: 06/24/93 Stage Depts Info Sves Agency: NRC Stage Due Date: Final Due Date: 01/01/90 Resp Dept: Info Sves Due Date Rev: 3 Manager: Ebberts, D. Sched Start: Phone: 5272 Sched Finish: 01/01/90 Mail Stop: 28 Actual Start: Assigned: MANAGER - EBBERTS Actual Finish: 08/16/89 Area: NM220 QA Req'd? Origin Dt: 12/29/88 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software

== Description:== IN 88-30, RESPONSE, PDQ 88-0110 ISSUE 1 Requirements: MAINTENANCE SHALL COMPLETE VR 148939, RBS FLOW TRAVERSE TEST, BEFORE THE END OF THE CTCLE 8 REFUELING OUTAGE. (HVAC) WR 148939 COMPLETE. COMPLETE SCR SOFTWARE CHANGE REQUEST) TO CHANGE FLOW DATA IN R-15044.

Response

ISWR 2808 (SCR) WAS COMPLETED. CHANGED FLOW DATA To R-15044 (STACK) MONITORS. Coments: Management reviwed the comitment on 6/23/93, and determined it is N/A in the POL Phase because DQ 88-0110 closed 7/25/90. Related Documents: Doctsnent: Rev: CTS Code: CCTS Type: ISWR 2808 1: Implementing VR 148939 X: Cross Reference IN8830 X: Cross Reference CE0880371 X: Cross Reference PDQ88-0110, ISSUE 1 X Cross Reference MS/IS890069 C: Closure Doctanent

,a-g g W () s ' Printed:, Rancho Seco Nuclear Generating Station Page: 1 06/28/93 Comitment Tracking System Report: CTS 7:30:45 General CTS Report Version: 080390 STDRPT1 Table: CTS

sa===========================================================================================================================

CTS #: 12743 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 890323949 LRSL #: Mig Pri

B NRC Report:

CTS Stage : N/A in POL Phase

Title:

ROOT CAUSE 85-27, REC B001 Stage Date: 06/17/93 Stage Depts Maint Agency: IIRG Stage Due Date: Final Due Date: 04/17/89 Resp Dept Maint Due Date Rev: 3 Manager: Brock, D. Sched Start: Phone: 4570 Sched Finish: 04/17/89 Mall Stop: 253 Actual Start: Assigned: MANAGER - BROCK Actual Finish: 04/19/89 Area: NM320 QA Req'd? Origin Dt: 03/23/89 Licensing Req'd? : Originatr: Reportable? Orig Dept: CCTS Closure?

L Storage Box:

Hardware / Software:

== Description:== ROOT CAUSE 85-27, REr B001 Requirements: CHANGE EM.198 TO REQUIRE A REVIEW OF THE "AS FOUND" DATA FOR POTENTIAL TS VIOLATIONS.

Response

EM.19BA, EM.19BB RAVE BEEN SUPERCEDED BT SP.322A, SP.3228, SP.315A & SP.315B. TS REVIEW DATA SHEETS ARE ATTACHED. THIS RECOMMENDATION hAS BEEN CCMPLIED WITH. Connents: Management reviewed the comitment on 6/17/93, and determined it is N/A in the POL Phase becaure the SPs i e no longer required. SP.322A&B and SP.345A&B were voided 10/5/92. Related Doctments: Document: Rev: CTS Code: CCTS Type: SP.322B PRO I: Inplementing SP.315B PRO I: Implementing SP.322A PRO I: Inplementing SP.315A PRO I: Inplementing R890323949 C: Closure Document RC8527 0: Originating Docunent t

~. -. - .~ if, 'l g g. 1.- W' -.W j '_ Printed:. Rancho Seco Nuclear Generating Station Page: -1 07/15/93 Connitment Tracking System Report: CTS { 9:28:06 General CTS Report Version: 080390 ? STDRPT1 Tables CTS j

===============================================================================================================================. CTS #2 12772 Rev i . System: N/A -Status ~ : Closed Priority : i . XREF: PDQ #: DQ #: CCTS #: 890323988 LRSL #: Mig Pri

B

-) NRC Report: CTS Stage : _N/A in POL Phase . Title ROOT CAUSE 88 15, REC M002 - Stage Date: 06/16/93 J; Stage Dept: Info Sves Agency: !!RG Stage Due Date: l f Final Due Date: 01/02/90 Resp Dept: Info Sves Due Date Revt. 12 I f Manager: Ebberts, D. 'Sched Start: j Phone 5272 Sched Finish: 01/02/90 j Mail Stop: 28 Actual Start: Assigned: MANAGER - EBBERTS Actual Finish: 12/29/89 Area: NM220 QA R'eq'd?' origin Dt: J3/23/89 Licensing Req'd? : [ Originatra Reportable? '[ .. Orig Dept: CCTS Closure?L : L [ Storage Box: 8413 Hardware / Software

== Description:== ROOT CAUSE 88-15, REC M002.. l f Requirements: ENSURE TPAT TROUBLE SHOOTING WORK REQUESTS ARE USED TO DI AGNOSE EQUIPMENT PROBLEMS AS REQUIRED BY MAP.0006. ACTION: CLOSE ISWR 2805- (SUDA)

Response

.ISWR 2805 WAS CLOSED.. ANALYZED & IDENTIFIED. SOLUTIONS FOR PRINTING PITS FORM, PREPARED SPEC DOCUMENTS FOR~ WORK CONTROL STSTEM MODIFICATIONS, PERFORMED TESTS,. TRAINING AND MADE CHANGES TO PROD IDMS. ~ Comnents: Management reviewed the coenitment on 6/16/93, and determined it is N/A in the POL Phase because there is no - Pli form in RSAP-0803 (which replaced volded MAP-006). Related Documents ~ Document: ' Rey: CTS Code: ' CCTS Type: R890323988 C: Closure Document i t t f! 3 r r i 'E t i h ..t '.-[ v f r -w r

O E* w ATTACHMENT B 1 1 l

w a Printed:. Rancho Seco Nuclear Generating Station Page: 1 06/29/93 Commitment Tracking System Report: CTS 14:05:45 General CTS Report Version: 080390 STDRPT1 Table: CTS ss============================================================================================================================= CTS #: 10302 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 861212305 LRSL #: Mig Pri

A NRC Reports CTS Stage : Closed

Title:

LER 86 26, TP.!PPING BISTABLE ERROR NOT ACCOUN1ED FOR (8626LO) Stage Date: Stage Dept: Info Sycs Agency: WRC Stage Due Date: Final Due Date: 01/01/89 Resp Dept: Info Sves Due Date Rev: Manager: Ebberts, D. Sched Start: Phone: 5272 Sched Finish: 01/01/89 Mall Stop: 28 Actual Start: Assigned: MANAGER - EBBERTS Actual Finish: 02/23/88 Area: NM220 QA Reg'd? Origin Dt: 12/12/86 Licensing Req'd? t Originatr Reportable? Orig Dept: CCTS Closure? C Storage Box: Hardware / Software:

== Description:== LER 86-26, TRIPPING BISTABLE ERROR NOT ACCOUNTED FOR (8626LO) Requirements: ACTION: 1) NE-REQUEST INFORMATION FROM B&W ($1MILAR TO DATA PROVIDED TO ANO 1)ON HOW MUCH INSTRUMENT ERROR IS ASSUMED WHEN SFAS SETPOINTS WERE SELECTED 2)SRTP-TO THIS INFORMATION SRTP WILL ADD CONSIDERATION FOR THE NEW GOULD pts TO BE USED IN THE SFAS INSTRUMENT STRINGS 3) YELLIOT-EVALUATE AND REVISE SFAS SETPOINTS IN SPs 4) NE-UPDATE PROSCESS STANDARDS. ACTIONS 1 & 4 COMPLETE (DIRECTOR - STRANGE)

Response

LER 86-26, REV 1 HAS BEEN WRITTEN AND DOCUMENTS ACTION THAT THE SFAS SETPOINTS DESIGNATED IN THE MONTHLY CHANNEL TEST PROCEDURES (SP.0420A, SP.0420B, & SP.0420C) HAVE BEEN RE EVALUATED AND REVISED PER INFORMATION FROM THE B&W ANALYSIS # 51-1171052-00, 12/23/87 Corments: Management reviewed the connitment on 6/9/93, and oetermined it may be permanently closed. Sp.420A, B & C were voided on 4/1/93. Related Doctanents: Document: Rev: CTS Code: CCTS Type: SP.420B PRO 1: Implementing SP.420A PRO I: Inplementing SP.420C PRO I Implementing LER8626 REV 1 C: Closure Doctanent

s, f+ ~

  • g

'g l w .i w Printed: Rancho Seco Nuclear. Generating Station Page: 1 06/29/93 Conunitment Tracking System ' . Report: CTS l. 1 14:05:58 General CTS Report-Version: 080390 STDRPT1 Tables-CTS 1 \\ -CTS #: 11337 ' Rev: f -I System N/A Status

Closed j

Priority. 3 XREFt PDQ # DQ #: CCTS #: 870917001 LRSL #: Mig Pri 5. NRC Report: CTS Stage : Closed-

Title:

REQUEST FOR ADDITIONAL INFORMATION Stage Date: 06/09/93-Stage Dept: System Review & Test" 'I Agency: NRC Stage Due Date: Finsi Due Date: 09/30/87 Resp Depts System Review & Test Program Due Date Rev: 1' ( Manager: Shetter, J. Sched Start: Phone 4154 Sched finish: 09/30/87 .l Mall Stop: 252 Actual Starts Assigned: DIRECTOR - SHETLER Actual Finish: 11/10/87.- Area: NM681 s QA Req'd? Origin Dt 09/17/87 Licensing Req'd? : l Originstr: Reportable? Orig Depts CCTS Closure?

C Storage Box:

Hardware / Softwares ] I

== Description:== REQUEST TOR ADDITIONAL INFORMATION Requirements: PROVIDE FINALIZED ICS/NNI PROCEDURES FOR FUNCTIONAL TESTS, CALIBRATIONS, TUNING, MONITORING ETC. USED TO ENSURE PROPER SYSTEM OPERATION. (P.'WACNER) f

Response

ICS TUNING PROCEDURE STP.0660 HAS BEEN SUBMITTED TO THE NRC PER AGM/NPP 87-0368. OTHER INFORMATION IS

)

PROVIDED PER AGM/NPP 87-0297. h Conunents: Management reviewed the commitment on 6/9,93, and determined it may be permanently closed. STP.0660 was' I Inactivated on 11/6/89. I Related Documents: Document: Rev; CTS Code CCTS Type: ^ DSR870201 1 0226 C: Closure Document - q l, a i s 1 i l s ~ e [v e

e.

2 't ,.g-y w ) ' Printed: Rancho Seco Nuclear Generating Station l Page 1. 06/29/93< Coasnitment Tracking System Report: CTS 14:06:06 General CTS Report versions :080390 STDRPT1 Tables CTS

===================================================================================================================

' CTS #: 116 % Rev: I I system: N/A. Status. : Closed -Priority -XREF: PDQ #: DQ #: CCTS #: 880216005 LRSL #: Mig Pri-3A NRC Report: CTS Stage : Closed Title IN 87-37-01, FOLLOWUP ITEM Stage Date: 06/09/93 r Stage Dept: Info Sves Agency: NRC Stage Due Date: + Final Due Date: 08/01/89.- Resp Dept:' Info Sycs Due Date Rev: 5. r.anager: Ebberts, D. Sched Start: Phone: 5272 Sched Finish: '08/01/89 Malt Stop: 28 Actual Start: Assigned: MANAGER

  • EBBERTS Actual Finish:

'05/16/89-Area: NM220 - QA' Req'd? - Origin Dt: 02/16/88 Licensing Req'd? : .Originatra Reportable? l Orig Dept: 'CCTS Closure?'

C' Storage Box:

Hardwcre/ Software.

== Description:== IN 87-37-01, FOLLOWUP ITEM i Re wirassents: INCORPORATE INTERIM CHANGES IN PICN-01 INTO SP.621 PERMANENTLY. (PROCEDURES r YELLIOTT) i Responses CORRECTIONS WERE INCORPORATED IN REV 2 0F SP.621. Comments ' Management reviewed the coasnitment on 6/9/93, and determined it may be permanently cLesed.. SP.621 is the Refueling Interval for Reactor Building Exhaust Purge Vent System Test.

I Related Documents: Doctanent Rev:

CTS Code: CCTS Type: SP.621 PRO I: Inplementing SP.621 PICN 01 PRO X: Cross Reference IN873701' .X: Cross Reference $P.621 PRO C: Closure Document l d a 7 b n b ^i.l

_m m._ _.c. e .'I p o o i 'i Printed: Rancho Seco Nuclear Generating Station Page: 1 06/29/93 Conmitment Tracking System Report: CTS-f 14:06:15 General CTS Report Versions 080390 STDRPT1 Tables CTS'

======6==================================u====================================================================================l l CTS # 11710 Rev: [ System: N/A Status

Closed Priority f

XREF: PDQ #: DQ #: CCTS # 880224204 LRSL #: Mig Pri

A
j NRC Report

+[ CTS Stage : Closed.

Title:

LER 86-26, SFAS CAL. PROC. DOES NOT ACCOUNT FOR ERROR OF TRIP BI-STABLE Stage Date: 06/09/_93 Stage Depts. Info Sves' i Agency: NRC Stage Due Dates Finst Due Date: 06/05/88 Resp Dept: Info Sves Due Date Rev: 1 l Ranager: Ebberts, D. Sched Start: { Phone: 5272 Sched Finish 06/05/88 j Mall Stop: 28 Actual Start: ~ Assigned: MANAGER

  • EBBERTS Actual Finish:

06/06/88 j Area: NM220 t GA Req'd?- 2 origin Dt 02/24/88 Licensing Reg'd? : -f Originatri Reportable? Orig Dept: CCTS Closure?

C Storage Box:

Hardware / Softwares l

== Description:== LER 86-26, SFAS CAL. PROC. DOES NOT ACCOUNT FOR ERROR OF TRIP BI-STABLE- . l Requirements: REVISE PROCEDURE I.104 TO PRECLLOE EXCEEDING TECHNICAL SPECIFICATIONS SET POINT.1.104 SETS THE RPS OVER POWER BI-STABLE MODULES. INCORPORATE PICW-01 INTO PERMANENT REV 0F 1.104 (PROCEDURES - YELLIOTT)

Response

PROCEDURE I.104,-REV 6, EFFECTIVE 04/25/88,.INCORPOPATES PICN-01 TO REV 5 TO PRECLUDE EXCEEDING THE TECH SPEC LIMITS FOR THE RPS OVERPOWER BISTABLE TRIP POINT. (PROCEDURES - YELLIOTT) Comments: Management reviewed the commitment on 6/9/93,' and determined it may be permanently closed. I.104 was inactivated on 12/15/89. Related Doctanentst. Document: Rev: CTS Code: CCTS Type: -1.104 PRO I: Inplementing I.104 PRO X: Cross Reference - GCA880092 X: Cross Reference-LER8626 X: Cross Reference j 1.104 REV 6 PRO X: Cross Reference' I.104 REV 6 PRO C: Closure Doctanent LER8626 REV 1 - 0: Originating Document : r

)

l 1 i t i

1

o ' Printed: Rancho Seco Nuclear Generating Station Pages 1 06/29/93 Comitment Tracking System Report: CTS .14:06:24 General CTS Report Version: 080390 STDRPT1 Table: CTS sus============================================================================================================================ CTS # 11711 Rev: System: RPS Status

Closed Priority a XREF: PDQ #:

DQ #: CCTS #: 880224205 LRSL #: Mig Pri B NRC Reports CTS Stage : Closed

Title:

LER 86-26, SFAS CAL. PROC. DOES NOT ACCOUNT FOR ERROR OF 1 RIP BI-STABLE Stage Date: 06/09/93 Stage Dept Info Sves Agency: NRC Stage Due Date: Final Due Date: 08/01/89-Resp Dept Info Sves Due Date Rev: 1 Manager: Ebberts, D. Sched Start: Phone: 5272 Sched Finish: 08/01/89 Mall Stop: 28 Actual Start: Assigned: MANAGER - EBBERTS Actual Finish: 03/21/88 /.rea: NM220 QA Req'd? Origin Dt: 02/24/88 Licensing Reg'd7 : Originatra Reportable? Orig Dept: CCTS Closure?

C Storage Box:

Hardware / Software:

== Description:== LER 86-26, SFAS CAL. PROC. DOES NOT ACCOUNT FOR ERROR OF TRIP BI-STABLE Requirements: PRIOR TO THE PERFORMANCE OF REFUELING INTERVAL PROCEDURE SP.424, IT WILL BE REVIEWED AND REVISED (IF NECESSARY) TO ENSURE THAT SFAS SETPolNT DESIGNATION CONFORMS TO THE B&W ANALYSIS. (PROCEDURES - YELL 10TT)

Response

SP.424 WAS REVIEWED FOR CONCERNS POSTED IN RSL 2633 AND WAS FOUND TO BE ACCEPlABLE. (PROCEDURES - YELLIOTT) Coments: Management reviewed the commitment on 6/9/93, and determined it may be permanently closed. $P.424 was volded on 4/1/93. Related Docunents: Docunent: Rev: CTS code: CCTS Type: SP.424 PRO I: Inplementing PSG880012 C: Closure Document k 'l

  • j.

- ans ) 7 [, sq' - .. Printed: Rancho Seco Nuclear Generating Station Page 1 06/29/93 Conniteent Tracking Systesi Reports CTS f 14:06:32 General CTS Report version: 080390 l STDRPT1 Table STS meessamessnessessemassesessssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssssanusssssssssse CTS #: 11737 Rev: System: N/A Status

Closed

[ Priority : XREF: PDQ #2 DQ #1 CCTS #: 880307200 LRSL # Mig Pri.: A

(

NRC Report:- CTS Stage : Closed 1 j Titles tu 87-37, NOV RESPONSE Stage Date: 06/17/93 Stage Depts Maint Agency: NRC - Stage Due Date: Final Due Date: 03/18/88 g g Resp Dept: Maint Due Date Rev: '1 Manager: Brock, D. Sched Start: l P Phone: 4570 Sched Finish: 03/18/88 j Mall Stop: 253-Actual Start: Assigned: MANAGER - BROCK Actual Finish: 03/23/88 Area: WM320 QA' Req'd? origin Dt: 03/07/88 Licensing Req'd? : { Originatra Reportable? Orig Depts CCTS Closure? C Storage Box: Harchare/ Software:

== Description:== IN 87-37, NOV RESPONSE Requirements: PROVIDE ADDITIONAL TRAINING FOR MAINTENANCE SUPERVISORS ON PROCEDURES MAP-0002, RSAP-0803, ~ AND QAP-117 Bf l INCLUSION OF.THESE PROCEDURES IN THE REQUIRED READING LIST. PROVIDE READING LIST TRAINING $1GN OFF SHEET FOR> THESE PROCEDURES. i

Response

ADDITIONAL TRAINING HAS BEEN PROVIDED FOR MAINTENANCE SUPERVISORS ON PROCEDURES MAP.0002 REV 1, RSAP.0803 REV f 3 AND QAP.17, REV 7 PER REQUIREMENTS OF NOV IN 87-37. }f Connents: Management reviewed the ccanitment on 6/17/93, and determined it may be permanently closed because the-training was provided. 'i Related Documents: Doctment Rev: CTS Code: CCTS Type: ,l MNM880113 C: Closure Doctment GCA880111 0: Originating Document -- ,?8 -i bi t a 1 'I p ij r

f *J ; W 'l Rancho Seco Nuclear Generating Station-Page: 1 f

  • Printed:

i 06/29/93 Comitment Tracking System _ Reports CTS 14:06:41 General CTS Report version: 080390 - STDRPT1 Tables. CTS' l

{

CTS #2 11781 Rev: System: N/A Status

Closed

_~ j Priority a j 'XREF: PDQ #: DQ #: CCTS #: 880429006 LRSL #: Mig Pri

A NRC Report:

CTS Stage : Closed l Title INPO EVALUATION, JANUARY 1988, FINDING MA.3-1 Stage Date: 06/17/93 Stage Dept: Maint Agency: INPO Stage Due Date: Final Due Dates - 06/30/88' f Resp Dept Maint Due Date Revs 1-Manager: Brock, D. Sched Start: -{ Phone: 4570 Sched Finish: 06/30/88 + Malt Stop: 253 Actual Start: 3 Assigned: MANAGER - BROCK Actual Finish: 07/13/88 f Area: NM320 QA Req'd? Origin Dt: 04/29/88 - Licensing Req'd? : Driginatra Reportable? Orig Dept: CCTS Closure?

C N

Storage Box: Nardware/ Software:

== Description:== IMPO EVALUATION, JANUARY 1988, FINDING MA.3-1 ~ Requirements: DEVELOP AN ACTION PLAN TO ADDRESS THE IDENTIFIED WEAKNESSES IN THE PLANNING PROCESS. COMPLETE ACTION PLAN BY JUNE 1988 AND INCLUDE FOLLOWUP DN PLANNING PROCESS CHANGES TO ENSURE THEIR EFFECTIVENESS. Responses A MAINTENANCE PLANNING ACTION PLAN WAS DEVELOPED AND IMPLEMENTATION AS$1GNED TO THE PLANNING SUPERINTENDENT. [ EFFECTIVENESS REVIEWS HAVE BEEN INCLUDED IN THE PLAN. 'I Conments: Management-reviewed the comitment on 6/17/93, and determined that it may be permanently closed because the.- required actions are complete. Retsted Documents: Document: Rev: CTS Code: CCTS Type: INP01988JAN - X: Cross Reference MNMB80333 C: Closure Document i f f;

t i

h 3 4 w ~-w v -w w

I e 33 (~) m U W fo_ = Rancho Seco Nuclear Generating Station Page: 1 Printed: 06/29/93 Commitment Tracking System Report CTS 13:26:44 General CTS Report version: D80390 STDRPT1 Table: CTS

===================================================================================================================

CTS #: 12293 Rev: System: N/A Status

Closed Priority :

XREF: PDQ #: DQ #: CCTS #: 881123027 LRSL #: Mig Pri

A NRC Report:

CTS Stage : Closed

Title:

INPO EVALUATION RESPONSE, FINDING OA.1-1 Stage Date: 06/24/93 Stage Dept Info Sves Agency: INPO Stage Due Date: Final Due Date: 12/31/88 Resp Dept: Info Secs Due Date Rev: 1 Manager: Ebberts, D. Sched Start: Phone: 5272 Sched Finish: 12/31/88 Mail Stop: 28 ActLal Start: Assigned: MANAGER - EBBERTS ActLat Finish: 01/11/89 Area: NM220 QA Reg'd? Origin Dt: 11/23/88 Licensing Req'd? : Originat r: Reportable? Orig Dept. CCTS Closure?

C Storage Box:

Hardware / Software:

== Description:== INPO EVALUATIDW RESPONSE, FINDING OA.1-1 Requirements: REVISE APPROPRIAIE ADMINISTRATIVE PROCEDURES Bf 12/88 TO STRENGTHEN THE ROLE OF TRAINING COORDINATORS IN ASSURING TRAINING IS PROVIDED ON PROCEDURE CHANGES.

Response

RSAP.0502 WAS REVISED IN SECTION 6 TO STRENGTHEN THE ROLE OF TRAINING COORDINATORS. Conrents: Management reviewed the commitment on 6/24/93, and determined it may be permanently closed. RSAP-0502 was voided 9/18/89. Each department is responsible for its own training, as outlined in RSAP-1204, Training Programs. The current training program is different than the one committed to INPO. Related Docunents: Doctanent: Rev: CTS Code: CCTS Type: RSAP.0502 PRO 1: Implementing RSAP.0502 PRO C: Closure Document l 1 i i I i 1 L}}