Monthly Operating Rept for Jul 1993 for Millstone,Unit 1.W/
ML20046C984
Person / Time
Site: Millstone 
Issue date: 07/31/1993
From: Newburgh G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-93-620, NUDOCS 9308130170
Download: ML20046C984 (5)


Text

y,..

-n h

7.

l, i

j

.. '.

  • L NORTHEAST UTILITIES oenerei On,ce.. sonen street se,un. connecucy, u

m un w w m.e w mawe -

-1

~

  • "*"*""d""*"""

P.O. BOX 270 J [w[.c ).u,,, o,r.[m

' *7*

r~

HARTFORD. CONNECTICUT 06141-0270 l

k k

(203) 665-5000

-i I

August 9, 1993 MP-93-620 Re:

10CFR50.71(a)

U S. Nuclear Regulatory Commission Docue nt Control Desk Was'M.4gton, D. C. 20555

Reference:

Facility Operating License No. DPR-21 Docket No. 50-245

Dear Sir:

In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.

One additional copy of the report is enclosed.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY I

racts Stephen E. S ace Vice President - Millstone Station SES/GSN cc: T. T. Martin, Region I Administrator J. W. Andersen, NRC Project Manager, Millstone Unit No 1 P. D. Swetland, Senior Resident inspector, Millstone Unit Nos. 1, 2 & 3

]

1

(..

1 i

130035

[.s-hm

[bb 9308130170 930731

- ossui' nty' 4-es '

PDR ADOCK 05000245 m

. li.

([g-l

{.. 4 a

PDR 1

1

'C OPERATING DATA REPORT e-a UNIT NAllE Millstone Unit 1 DATE' 930804 COMPLETED BY G. Newburrh TELEPHONE (203) 447-1791 EXT 4400 1

OPERATING STATUS G

1.

Docket Number:

50-245 Notest 2.

Reporting Period:

July 1993 3.

Utility

Contact:

G.

Newburch 4

Licensed Thermal Power (MWt):

2011 5.

Nameplate Rating (Gross MWe):

662 6.

Design Electrical Rating (Net MWe):

660 17.

Maximum Dependable Capacity ' Gross MWe):

684

.i 8.

Maximum Dependable Capacity (Net MWe):

654 9.

If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Report.

Give Reasons:

i N/A 10 Power Level To Which Restri<. ted, If any (Net MWe):

N/A

11. Reasons For Restrictions, If Any:

N/A

._ t This Month Yr.-To-Date Cumulative

12. Hours In Reporting Period 744-

~5087 198743

13. Number Of Hours Reactor U'.4 2'itical 744 4989.5 154458.9

~

14. Peactor Reserve Shutdown Hour s 0

0 3283.3

15. Hours Generator On-Line 744 4974.7 150750.5
16. Unit Reserve Shutdown Hoare 0

0 93.7-

17. Cross Thermal Energy Generated (MWH) 1475006 9837072

_283703945.Q E18. Cross Electrical Energy Generated (MWH)

'83748 _

3264044 95675043.0

19. Net Electrical Energy Generated (MWH)

';11__

3122078 91274989.0

20. Unit Service Factor 90 97.8 75.9-
21. Unit Availability Factor

'100 97.8 75.9.

22. Unit Capacity Factor (Using MDC Net) 95.1 93.8 70.2_
23. Unit Capacity Factor (Using DER Net) 94.2 93.0 69.6
24. Unit Forced Outage Rate 0

2.2 12.2

25. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A i
26. If Utta '.ihutdown At End Of Report Period, Estimated Date of Startup:

N/A

-27.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY.

N/A N/A COMMERCIAL OPERATION N/A' N/A t

4 1

l l

i

^

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-245 UNIT:

Millstone Unit 1 DATE:

930804 COMPLETED BY:

G. Newburth e

TELEPHONE:

(203) 447-1791 EXT:

4400 MONTH:

JULY 1993 e

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 632 17 634 2

633 18 633 j

3 633 19 632 4

633 20 632 5

633 21 626 6

632 22 626 7

624 23 629 f

8 631 24 628 9

631 25 624 v

10 630 26 539 11 630 27

-631

-12 630 28

_626 i

13 629 29 632

]

14 462 30 63' l

15 632 31 630 16 633_

' INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in'the reporting month. Compute to the nearest whole megawatt.

j

'I 1

l

(-

..a DOCKET NO.

50-245 UNIT SHUTDOWNS AND POWER REDUCTIONS.

. UNIT NAME-Millstone 1 DATE 930804 COMPLETED BY C. Newbur2h TELEPHONE (203) 447-1791 REPORT MONTH JULY 1993 EXT.

4400 l

2 No.

Date Type Duration Reason Method.of License Systgm Compgnent Cause & Corrective (Hours)

Shutting Event Ccle Code Action to 3

Down Reactor Report #

Prevent Recurrence-93-07 930714-S 0

H 5

.N/A Power reduction to obtain condenser measurements in preparation for condenser tube replacement

.93-08 930726 F

0-B 5

N/A Power reduction to find and repair condenser tube'

+

leaks 2

3 O

A: Forced Reason:

Method IEEE-Standard 805-1984, F

S: Scheduled

.A-Squipment' Failure.(Explain) 1-Manual

" Recommended Practices for.

B-Maintenance or Test 2-Manual Scram System' Identification in, C-Refueling.

'3-t.utomatic Scram Nuclear: Power Plants and D-Regulatory Restriction

'4-Continued from Related-Facilities" E-Operator Training 6 Licenso Examination-Previous month 5

F-Administrative 5-Power Reduction 1EEE Standard 803A-1983 G-Operational Error'(Explain)

(Duration -0)

" Recommended Practice for H-Other (Explain) 6-Other.(Explain)

' Unique identification in.

Power Plants and Related Facilities - Component Function Identifiers"

,e Thu s4

~

TwNb*i-W W

t*mT

'N PPr^-*WW T

1r m

g-W g-'*%-e wth'-T'"4 44*'W"'#W W9' WV

't*Mr"NT'%

'F "t. P%

W

41MM

-#G-?W" F7 4

wdT't'9'Wv-4'M'P-'N1rs' w

t't*e'M-Y9

  • 'M'W'99"T'"MWYt** Dup *'S9s'940-WfF'94'r b'='W***Illib

1 a

REFUELING INFORMATION REOUEST 1.

Name of facility:

Millstone 1 2.

Puissculed date for next refueling shutdown:

January 1994 3.

Scheduled date for restart following refueling:

March 1994 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

No Technical Specification chances have been identified as of the time of this report.

5.

Scheduled date(s) for submitting licensing action and supporting i

-information:

N/A l

t 6.

Important licensing considerations associated with refueling, e.g.,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

t 188 GE10 Fuel Assemblies i

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

In Core:

(a) 580 In SFP:

(b) 2116 (Unconsolidated)

F I

8.

The present licensed spent fuel pool storage capacity and the size i

of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

Present Capacity: Maximum 3229 fuel assembly locations.

i 9.

.The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

'1997. Soent Fuel Pool Full. Core Off Load capacity is reached.

I E

,