ML20046C978
| ML20046C978 | |
| Person / Time | |
|---|---|
| Issue date: | 06/01/1993 |
| From: | Marcus G Office of Nuclear Reactor Regulation |
| To: | Larhette R INSTITUTE OF NUCLEAR POWER OPERATIONS |
| References | |
| NUDOCS 9308130153 | |
| Download: ML20046C978 (8) | |
Text
7 June 1, 1993 Mr. Richard P.
LaRhette Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 t
Dear Mr. LaRhette:
Enclosed for your information is our listing of generic communications being considered or under development by the NRC staff.
The list includes all Generic Letters (GL), Bulletins (BL), Information Notices (IN), and Te"porary Instructions (TI) reported to us by June 1, 1993.
In addition, the list contains proposed documents designated as Administrative Letters (AL).
These proposed documents are being considered by the NRC to inform recipients of non-safety issues which are generic in nature.
Generic Letters will continue to be used to inform recipients of safety issues and regulatory matters.
New items on the list or changes in the status of previously listed items are identified by a notation in brackets.
Because the letter is currently being sent monthly, communications that have been issued or canceled will no longer be retained on the list for an additional cycle.
This change is being made in the interest of brevity and to improve overall clarity.
Sincerely,
/S/
Gail H. Marcus, Chief 9308130153 930601 Generic Communications Branch PDR ORG EPSINPD Division of Operating Reactor Support PDR Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
S.
D. Richardson, Defense Programs (Savannah River), DOE R.
W. Barber, Safety and Quality Assurance, DOE S.
Scott, Office of Nuclear Safety, NS-10, DOE DISTRIBUTION w/ enclosure JTShedlosky, OCM JScarborough, OCM KAConnaughton, OCM JGuttmann, OCM WHBateman, EDO JGPartlow, NRR All NRR Division Directors All NRR Branch Chiefs All Regional Division Directors KGray, NRR h
RIngram, NRR CACarpenter,NRR h[ (f
/
LCShao, RES WMinners, RES RFraley, ACRS TMNovak, AEOD
. m
<Qg Pc>
JERosenthal, AEOD PWBaranowsky, AEOD [
.O O G C B m M e m b e r s _ ---,
PDR L,') 'CentraliFiles-DORS R/F ff 4U1[k67)
CD"OGCB R/F JBirmingham R/F O
CD Document Name:
INPOLIST.LTR CD OGCB: DORS:NRR C/OGCB: DORS:1RR JBirminghan,[
GHMarcusfyqt sd
"# 6/ / /93 (#1 6/ l/93 j{ M g
a 1
1 h
[,( p m jo UNITED STATES g
w g
NUCLEAR REGULATORY COMMISSION 8
aE WASHINGTON, D. C. 20555
/
June 1, 1993 Mr. Richard P. LaRhette Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957
Dear Mr. LaRhette:
Enclosed for your information is our listing of generic communications being considered or under development by the NRC staff.
The list includes all Generic Letters (GL), Bulletins (BL), Information Notices (IN), and Temporary Instructions (TI) reported to us by June 1, 1993.
In addition, the list contains proposed documents designated as Administrative Letters (AL).
These proposed documents are being considered by the NRC to inform recipients of non-safety issues which are generic in nature.
Generic Letters will continue to be used to inform recipients of safety issues and regulatory matters.
New items on the list or changes in the status of previously listed items are identified by a notation in brackets.
Because the letter is currently being sent monthly, communications that have been issued or canceled will no longer be retained on the list for an additional cycle.
This change is being made in the interest of brevity and to improve overall clarity.
Sincerely, h la/M Gail H. Marcus, Chief Generic Communications Branch Division of Operating Reactor Support Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
S. D. Richardson, Defense Programs (Savannah River), DOE R.
W.
Barber, Safety and Quality Assurance, DOE S.
Scott, Office of Nuclear Safety, NS-10, DOE u
a
0 0
Page No.
1 06/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC I
TP SUBJECT SOURCE CONTACT PHONE NO j
j GL ISI OF MARK I & II STEEL CONTAINMENTS, NRR DE Chen P Tan (301)
REFUEL CAVITIES, & DRAINAGE SYSTEMS ESGB 504-3315 1
GL [ TEMPORARILY REMOVED) CONTROL ROOM NRR DSSA Ralph (301)
HABITABILITY SYSTEMS SPLB Architzel 504-2804-GL LINE ITEM TS IMPROVEMENT, ACCELERATED NRR DORS Om Chopra (301)
- 3 EDG TESTING OTSB Tom Dunning 504-3150 GL INST OF MICROPROCESSORS IN SAFETY NRR DRCH Paul Loeser (301)
SYSTEMS VIA 10 CFR 50.59 HICB 504-2825
]
GL GROUNDS IN DIRECT CURRENT DISTRIBUTION NRR DE F Burrows (301)
SYSTEMS EELB 504-2901 GL UTILITY IMPLEMENTATION OF ACCIDENT NRR DSSA Robert (301)
MANAGEMENT PLANS SPSB Palla 504-1095 1
GL MODIFICATION OF TS REQUIREMENTS FOR NRR DORS Tom Dunning (301)
EMERGENCY & SECURITY PLANS OTSB 504-1189 GL TS IMPROVEMENT: REDUCED TESTING DURING NRR DORS Tom Dunning (301) j POWER OPERATION OTSB-504-1189 GL MODIFICATION OF TS REQUIREMENTS FOR NRR DORS Bob Tjader (301)
MOVABLE CONTROL ASSEMBLIES OTSB 504-1187 GL REMOVAL OF TECH SPEC TABLES FOR NRR DORS Tom Dunning (301)
RESPONSE TIME LIMITS OTSB 504-1189 IN REVIEW OF MFR's INFO ON COMPUTERIZED NMSS IMNS Cathy Haney (301)
THERAPY PLANNING SYSs IMOB 504-2628 GL INSERVICE LEAK AND HYDROSTATIC TESTING NRR DORS Carl S (301)
TS BACKFIT APPEAL OTSB Schulten 504-1192 l
IN CONCERNS WITH SEALS ON PRESSURE NRR DORS Vern Hodge (301)
BOUNDARIES OGCB 504-1861 j
TI TI FOR BL 91-01, REPORTING LOSS OF NMSS IMNS A T Clark (301) 3 CRITICALITY SAFETY CONTROLS IMSB 504-3424 GL NRC-POSITION ON EPRI OBE CRITERIA AND NRR DE Goutam (301)
EPRI GUIDE FOR EARTHQUAKES ECGB Bagchi 504-2733 GL [TMPRLY REMOVED) INTERFACING SYSTEMS RES RPSIB Gary' (301)
LOCA IN LIGHT WATER REACTORS Burdick 492-3812
O O
J l
Page No.
2 06/01/93 PROPOSED GENERIC COMMUNICATIONS l
IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO GL EMERGENCY CLASSIFICATION DURING NRR DRSS Scott (301) i CONTAINMENT VENTING PEPB Boynton 504-2919
)
i GL LONG TERM ACTIONS FOR THERMAL HYDRAULIC NRR DSSA Laurence E (301)
STABILITY SRXB Phillips 504-3232 GL MODIFICATION OF TECH SPEC REQUIREMENTS NRR DORS Tom Dunning (301)
FOR ACCIDENT MONITORING INSTRUMENTATION OTSB 504-1189 GL MODIFICATION OF TECH SPEC REQUIREMENTS NRR DORS Tom Dunning (301)
FOR CYCLIC / TRANSIENT LIMITS OTSB 504-1189 i
IN APPLICABILITY OF 10 CFR 70.24, NRR DRPW L Kokajko (301) i
" CRITICALITY ACCIDENTS,"
PD5 504-1369
)
i IN NON-POWER REACTOR SOFTWARE VERIFICATION NRR DORS Marvin (301)
AND VALIDATION REGULATORY EXPERIENCE ONDB Mendonca 504-1128 9
IN REPORTING FUEL CYCLE AND MATERIALS NMSS IMNS Kevin (301) l INCIDENTS TO THE NRC OPS CENTER IMOB Ramsey 504-2534 IN EXTENDED STORAGE OF GREATER-THAN-NMSS IMNS Kevin (301)
CLASS-C SEALED SOURCES IMOB Ramsey
-504-2534 GL GENERIC LETTER ON MODEL TECHNICAL NRR DRSS S P Klemen- (301)
SPECIFICATIONS TO INCORPORATE THE PRPB towicz 504-1084 REVISED 10 CFR PART 20 i
IN SUPPLEMENT TO IN 92-51, MISAPPLICATION NRR RVIB Steve (301) l AND INADEQUATE TESTING OF MCCBs DRIL Alexander 504-2995 IN [IN 93-39, 5/25/93) RADIATION BEAMS NRR DRSS Jack Bell (301) l FROM POWER REACTOR BIOLOGICAL SHIELDS DRPB
-504-1083 TI SHUTDOWN RISK AND OUTAGE MANAGEMENT NRR DRIL Don Norkin (301)
INSPECTION RSIB 504-2954 GL AVAILABILITY AND ADEQUACY OF DESIGN NRR DRIL Eugene (301)
BASES INFORMATION RSIB Imbro 504-2967 GL GENERIC LETTER ON PLANT OPERATION NRR DRSS Mark Caruso (301) l DURING SHUTDOWN AND LOWPOWER SRXB 504-3235 l
IN MAIN STEAMLINE BREAK ANALYSIS INDICATES REGION II Nancy (301)
I PROBLEMS IN VALVE VAULTS Campbell 504-2836 l
IN FAILURES OF WESTINGHOUSE 7300 PROCESS REGION II T J Kim (301)
CARDS FROM INCORRECT FUSING 504-2841 l
l a
O O
Page No.
3 06/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION UITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO 1
GL PROPOSED SUP TO GL 89-10 MOV TESTS AND NRR DE Dick (301) i SURVEILLANCES EMEB Kiessel 504-2840
)
IN POTENTIAL FAILURES OF EDGs CAUSED BY REGION 1 Vern Hodge (301) i COLD FUEL OIL 504-1861 i
IN INDETERMINATE SOLENOIDS IN THE MSIV NRR DRIL Kamal Naidu (301) l AIR-MANIFOLD OPERATORS RVIB 504-2980 IN [IN 93-37, 5/19/93] EYEBOLTS WITH REGION II Stephen (407)
INDETERMINATE PROPERTIES INSTALLED IN Elrod 464-7822 LIMITORQUE VALVE OPERATOR COVERS IN WESTINGHOUSE REACTOR COOLANT PUMP REGION III Rick Roton (815)
SHUTDOWN PROCEDURES FOR NO. 1 SEALS 458-2852 IN NBC STUDY ON PRESSURE LOCKING & THERMAL NRR DE Tom (301)
BINDING OF GATE VALVES EMEB Scarbrough 504-2794 IN PROBLEMS WITH COMMERCIAL GRADE REGION II T J Kim (301) i LUBRICANTS IN SAFETY-RELATED SYSTEMS 504-2841 IN UNRECOGNIZED LOSS OF CONTROL ROOM REGION III B Bartlett (314)
ANNUNCIATORS 676-3181 GL GL RE VERIFICATION OF PLANT RECORDS NRR DRCH Vern Hodge (301)
HOLB 504-1861 GL RESOLUTION OF GSI 106 PIPING & USE OF RESEARCH Vern Hodge (301)
COMBUSTIBLE GASES IN VITAL AREA 504-1861 GL GL: TS AMENDMENT RE VOLTAGE BASED NRR DSSA Bill Long (301)
PLUGGING CRITERIA FOR SG TUBES SCSB 504-3026 IN [IN 93-36, 5/7/93] NOTIFICATIONS, NMSS IMNS Patricia (301)
REPORTS AND RECORDS OF Holahan 504-2694 MISADMINISTRATIONS GL RVW GUIDANCE ON TEMP CORRECTIVE EMEB DE Don (301)
MEASURES FOR MEDIUM ENERGY ASME-3 PIPE NRR Kirkpatrick 504-1849 IN DEFICIENCIES IN OPERATOR TRAINING &
REGION II T J Kim (301)
STAFFING PROGRAMS 504-2841 IN TEMPER EMBRITTLEMENT OF BYRON JACKSON EMCB DE J Davis (301)
PUMP COUPLINGS NRR 504-2713 IN DUAL UNIT REACTOR TRIP DURING REGION II G MacDonald (404)
SWITCHYARD BREAKER TESTING 331-5576
5 If )
1 1
Page No.
4 06/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC 1
TP SUBJECT SOURCE CONTACT PHONE NO IN TESTING OF BACKUP EMERGENCY RESPONSE NRR DRSS Edwin F Fox (301)
FACILITIES PEPB 504-2908 IN DEGRADATION OF SR SYSTEMS DURING VALVE REGION II P Kim (704)
STROKE SURVEILLANCE TESTING VanDoorn 875-1681 AL PROPOSED: NRC TO USE ADMIN LETTERS NRR DORS Dick (301)
I RATHER THAN GLs FOR NONSAFETY ISSUES OGCB Kiessel 504-2840 IN QA ACTIVITIES RELATED TO AMSAC NRR DORS Chris (301)
EAB Orsini 504-1172 IN LOW TEMPERATURE OVER PRESSURE SETPOINT NRR DORS Thomas (301)
ISSUE EAB Koshy 504-1176 IN DIRTY OIL IN THE TD OIL PUMP CONTROLS NRR DORS Thomas (301) j DEFEATS RV OVERFILL PROTECTION EAB Greene 504-1175 IN [IN 93-38", 5/24/93) INADEQUATE TESTING REGION II Bill Miller (404)
OF ENGINEERED SAFETY FEATUREAS 331-4198 ACTUATION SYSTEMS IN THERMAL STRATIFICATION IN A BWR REACTOR NRR DORS Jerry (301)
VESSEL EAB Carter 504-1153 IN IN SUPPLEMENT, FALSIFICATION OF PLANT NRR DORS Tom Greene (301)
RECORDS EAB 504-1175 IN INADEQUATE CONTROL OF OPERATING REGION I Peter Wen (301)
PROCEDURES 504-2832 GL GL SUPPLEMENT ON USE OF THERMOLAG 331 NRR DES Dick (301)
FIRE-SYSTEM SPLB Kiessel 504-2840 IN UNEXPECTED OPENING OF BOTH DOORS OF NRR DORS Jerry (301)
CONTAINMENT AIRLOCK EAB Carter 504-1153 TI INSPECTION OF IMPLEMENTATION OF STATION NRR DE Amar Pal (301)
BLACKOUT RULE EELB 504-2760 IN POTENTIAL BREACH OF PRIMARY CONTAINMENT NRR DORS Tom Greene (301)
EAB 504-1175 IN TURBINE OVERSPEED & RCS COOLDOWN DUE TO NRR DORS Eric Benner (301)
RELATCHING OF MAIN TURBINE EAB 504-1171 IN COMPUTER AND SOFTWARE DEFICIENCIES NRR DORS Chris (301)
EAB Orsini 504-1172
l Page No.
5 06/01/93 I
PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO-IN FAILURES OF ANTI-ROTATION KEYS IN VELAN NRR DE Dave (301)
VALVES EMEB Fischer 504-2728 i
GL THERMAL GROWTH AND STRUCTURAL DESIGN NRR DE Vern Hodge (301)
ECGB 504-1861 IN STEAM GENERATOR TUBE RUPTURE AT PALO REGION V Dennis (510)
VERDE Kirsch 975-0290 IN TIME DELAYS NOT INCLUDED IN TS TIME REGION IV Bill (817)
RESPONSE LIMITS Johnson 860-8148 IN [IN 93-35, 5/12/93) INSIGHTS FROM AEOD Vern Hodge (301)
COMMON-CAUSE FAILURE EVENTS 504-1861 IN [NEW) FIRE EVENT AT CHERNOBYL PLANT NRR DORS Jerry (301)
OEAB Carter 504-1153 IN [NEW) UNDETECTED LEAKAGE THRU DOUBLE REGION II Peter Wen (301)
I O-RING FLANGE CONNECTIONS 504-2832 IN [NEW] PROBLEMS WITH TESTING OF TURBINE REGION IV Peter Wen (301)
DRIVEN AFW PUMPS 504-2832 IN [IN 93-40, 5/26/93] FIRE ENDURANCE TEST NRR DSSA K Steven (301)
RESULTS FOR THERMAL CERAMICS FP-60 FIRE SPLB West 504-1220 BARRIER MATERIAL i
J IN [IN 93-34 S1 5/6/93) POTENTIAL FOR LOSS NRR DSSA Roger (301)
OF EMERGENCY COOLING FUNCTION DUE TO A SCSB Woodruff 504-2917 i
COMBINATION OF OPERATIONAL & POST-LOCA DEBRIS IN CONT'MT j
IN [IN 93-33, ISSUED 4/28/93] POTENTIAL NRR DSSA Paul (301)
DEFICIENCY OF CSRTAIN CLASS 1E SPLB Shemanski 504-1377 INSTRUMENTATION AND CONTROL CABLE IN [NEW) POTENTIAL CHARGING PUMP NRR DSSA Don (3010 MALFUNCTIONS SPLB Kirkpatrick 504-1849 BL [BL 93-02, 5/11/93] DEBRIS PLUGGING OF NRR DSSA Roger (301)
EMERGENCY CORE COOLING SUCTION.
SCSB Woodruff 504-2917 STRAINERS i
IN [NEW) PROBLEMS WITH SWITCHOVER TO NRR Nancy (301)
HOTLEG INJECTION AFTER A LOCA Campbell 504-2836 IN [ REOPENED) 1E BUS AND LOAD NRR DE C Morris (301)
VULNERABILITY TO UNEXPECTED EUS EELB 504-2778 j
TRANSFER i
Page No.
6 06/01/93 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP SUBJECT SOURCE CONTACT PHONE NO IN [NEW) CERTIFYING OFFICIALS ON NRC FORM NMSS IMNS Scott W (301) 313, " APPLICATION FOR MATERIAL LICENSE" IMOB Moore 504-2514 IN [NEW) UNDERVOLTAGE RELAY SETTINGS NRR DSSA Nancy (301)
EELB Campbell 504-2836 IN [IN 93-41 5/28/93] 1 HR FIRE ENDURANCE NRR DSSA Pat Madden (301)
TEST RESULTS FOR THERMAL CERAMICS SPLB 504-2854 KAOWOOL, 3M CO FS-195 & 3M CO INTERAM E-50 FIRE BARRIER SYSTMS BL [BL 93-03, 5/28/93] RESOLUTION OF THE NRR DSSA Amy Cubbage (301)
ISSUES RELATED TO REACTOR VESSEL WATER SRXB 504-2875 LEVEL INSTRUMENTATION IN BWRs e
f i h
,