ML20046C818

From kanterella
Jump to navigation Jump to search
Forwards SER Accepting Topical Rept BAW-10184P for Ref in Licensing Applications.Staff Proposes That CRGR Review Be Waived in Accordance W/Suggested Revised Procedures in El Jordan 890929 Memo to TE Murley
ML20046C818
Person / Time
Issue date: 06/24/1993
From: Thadani A
Office of Nuclear Reactor Regulation
To: Russell W
Office of Nuclear Reactor Regulation
Shared Package
ML20045E001 List:
References
TAC-M83405, NUDOCS 9308120228
Download: ML20046C818 (2)


Text

- - _ _ - - _ _ _ _.

h June 24, 1993 J

MEMORANDUM FOR:

William T. Russell, Associate Director for Inspection and Technical Assessment FROM:

Ashok C. Thadani, Director Division of Systems Safety and Analysis

SUBJECT:

WAIVER OF CRGR REVIEW FOR TOPICAL REPORT BAW-10184P (TAC NO. M83405)

REFERENCE:

Memorandum from E. L. Jordan to T. E. Murley, "CRGR Consideration of Topical Reports," September 29, 1989.

Enclosed is the safety evaluation report (SER) prepared by the Division of Systems Safety and Analysis in which the staff accepts Topical Report BAW-10184P for referencing in licensing applications.

The staff proposes that the Committee to Review Generic Requirements (CRGR) review be waiired in accordance with the suggested revised procedures in the above referenced memorandum.

BAW-10184P describes modifications to the approved B&W Fuel Company TAC 03 code, incorporating the material properties of gadolinium oxide.

Extension of the model will enable the licensee or applic<.nt to cal ulate the thermal-mechanical fuel performance for individual urania-gadolinia fuel pins.

The CRGR charter states that the CRGR shou?d review each of the staff's approvals of topical reports.

However, since this SER does not represent a new staff position, the staff believes that CRGR review is not necessary because the methodology is identical to the existing approved code and the included gadolinium properties are to be applied only to the range of fuel designs and operating states that were evaluated in the report.

If you agree that a CRGR review is not necessary, please indicate by signing on the line below. Otherwise, the staff will prepare an appropriate CRGR package.

StGNED BY A.C.THADANI ORlYshkC.Thadani,Diractor Division of System:; Safety and Analysis

Enclosure:

As stated William T. Russell TtCH. ED:

M. F. Me.iac Approved:

CRGR review is not necessary.

DATE:

06/ 08/93

Contact:

E. Kendrick, SRXB/DSSA 504-2891 DISTRIBUTION:

Central Files /PDR SRXB R/F CRGR file AThadani RJones fy pp LPhillips SWu EKendrick EKendrick R/F v

\\

68Y OFC SRXB:CSSA*

SRXB:DSSA*

SRXB:DSSA*

D:DSSA AD:ADT

,b

/s s /D NAME EKENDRICK:

LPHILLIPS RJ0NES ATpADANI fkEY' I, E y /[I>-

8t>

DATE 06/ 08 /93 06/ 08 /93 06/ 09 /93 [/%/9[/(p / g 93

!j' Document Name: G:\\BWGDTAC0.SER

  • See previous concurrence gg, /f[S) t jn"18!!!Eng NRC FM CMI53 CDPV gg

e--

r Os j

A V

Wae22,1993 e

~

Mr. J. H. Taylor DISTRIBUTION Central Files /PDR SRXB R/F AThadani RJones LPhillips GMarcus (8D-22)

JConran (MNBB-3701)

LTremper (MNBB-4503)

LSapp (12H-5)

EPoteat (12H-7)

EKendrick EKendrick R/F i

W-