ML20046C609

From kanterella
Jump to navigation Jump to search
Submits Daily Highlights Re 930810 Meeting w/ABB-CE in Rockville,Md Re AAB-CE Nuplex 80+ Standards,Guidelines & Bases Document
ML20046C609
Person / Time
Site: 05200002
Issue date: 08/06/1993
From: Stewart Magruder
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9308110223
Download: ML20046C609 (4)


Text

hw a us UNITED STATES 8

o,,

8 NUCLEAR REGULATORY COMMISSION n

WASHINGTON, D. C. 20555 r,

j e

%,,.,/

August 5, 1993 Docket No.52-002 MEMORANDUM FOR:

T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger W. Russell J. Zwolinski C. Thomas J. Partlow E. Adensam F. Congel D. Crutchfield B. Grimes E. Butcher W. Travers J. Wiggins W. Bateman, ED0 T. Gody, Acting B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center J. Calvo M. Virgilio C. Rossi THRU:

R. W. Borchardt, Acting Director Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation FROM:

Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (REVIEW 0F NUPLEX 80+

STANDARDS, GUIDELINES, AND BASES DOCUMENT)

DATE AND TIME:

August 10, 1993 (9:45 a.m. - 5 p.m.)

LOCAT ION:

U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 Room 3-B-13 PURPOSE:

Meeting to review the staff's comments, and the ABB-CE responses, regarding ABB-CE's Nuplex 80+ Standards, Guidelines, and Bases Document. A proposed agenda is enclosed.

$$h 9308110223 930806 PDR ADOCK 05200002

/

A PDR y

. August 5, 1993 PARTICIPANTS *:

NRC ABB-CE G. West D. Harmon S. Magruder R. Fuld BNL W. Stubler (Original signed by)

Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation Enclosure Meeting Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-3139.

DISTRIBUTION:

Docket File PDST R/F MCullingford, 12E18 RBorchardt PDR TWEssig JNWilson TVWambach MXFranovich SMasruder PShea EJordan, MNBB 3701 OPA TGo(y, ED0 ACRS (11) (w/o encl)

P0' Dell, PTSB JMoore, 15B18 J0'Brien, RES REckenrode, 10D24 GWest, 10D24 MPratt, 7E4 NRR Mailroom, 12G18 0: 2 SC:PyT/ADkR 0FC:

LA:PDST:ADAR PM:PDST:ADAR NAME: PShe g g SMagrudek[

TNAs'ig DATE:

08/ b I /93 08/ S /93 08/f /93 0FFICIAL DOCUMENT COPY:

CEHFMTG.SLM

b d

2-ABB-Combustion Engineering, Inc.

Docket No.52-002 cc:

Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager

+

Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

20585 t

Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 Washington, D.C.

20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C.

20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 i

r 4

4 ABB-CE NUPLEX 80+

STANDARDS, GUIDELINES, AND BASES DOCUMr.NT REVIEW MEETING August 10, 1993 PROPOSED AGENDA 9:45 - 10:00

Introductions

10:00 - 12:00 Discuss staff comments and ABB-CE responses regarding Stendards, Guidelines and Bases document 12:00 - 1:00 Lunch i

1:00 - 4.00 Continue discussion from morning 4:00 - 5:00 Wrap-up and discuss review schedule Y

h Enclosure i