p pmarco UfelTED STATES y.
?g NUCLEAR REGULATORY COMMISSION ff j~
REGION IV h<, ikk f
611 RY AN PLAZA DRIVE. SUITE 400
'gj AR LINGTON, T E XAS 76011 8064 E - 31993 Dockets:
50-313 50-368 Licenses: DPR-51 NPF-6 Entergy Operations, Inc.
ATTN:
J. W. Yelverton, Vice President Operations, Arkansas Nuclear One Route 3, Box 137G Russellville, Arkansas 72801
SUBJECT:
JULY 19, 1993, PUBLIC MEETING This refers to the meeting, open to public observation, conducted at the NRC's request at Entergy Operations, Inc.'s Arkansas Nuclear One facility on July 19, 1993. This meeting related to the pending Arkansas Nuclear One Unit I refueling outage scheduled to begin in September 1993. This meeting was attended by those on the enclosed Attendance List.
'[
The subjects discussed at this meeting are described in the enclosed Meeting Summary.
It is our opinion that this meeting was beneficial and has provided a better understanding of how you plan to control outage activity to minimize i
shutdown risk.
We recognize that your Shutdown Operations Protection Plan provides, under certain circumstances, that reduced inventory operations may be conducted with only one operable onsite source of emergency AC power.
This is a matter that is currently under agency review.
In the interim, we request that you inform us if you plan to operate in a midloop or reduced inventory condition with fuel in the reactor vessel and with only one operable onsite source of emergency AC power.
l In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, l
(j/
C 930811o202 930803 PDR ADDCK 05000313 l./
/
i 1
P PDR A Bill Beach, Di e tor Division of Reactor Projects
Enclosure:
I Meeting Summary w/ attachments
/
t
Entergy Operations, Inc..
i cc w/ enclosure:
Entergy Operations, Inc.
ATTN: Donald C. Hintz, President &
Chief Operating Officer P.O. Box 31995 4
Jackson, Mississippi 39286 Entergy Operations, Inc.
ATIN: John R. McGaha, Vice President Operations Support P.O. Box 31995 Jackson,' Mississippi 39286 Wise, Carter, Child & Caraway ATTN:
Robert B. McGehee, Esq.
P.O. Box 651 i
Jackson, Mississippi 39205 Entergy Operations, Inc.
ATTN: James J. Fisicaro I
Director, Licensing Route 3, Box 137G
- +
Russellville, Arkansas 72801 Entergy Operations, Inc.
ATTN: -Michael B. Sellman, General j
Manager, Plant Operations Route 3, Box 137G Russellville, Arkansas 72801 Honorable C. Doug Luningham County Judge of Pope County Pope County Courthouse Russellville, Arkansas 72801 l
Winston &~Strawn
~
-ATTN: Nicholas S. Reynolds, Esq.
i 1400 L Street, N.W.
Washington, D.C.
20005-3502
.i Arkansas Department of Health j
A11N: Ms. Greta Dicus, Director Division of Radiation Control and Emergency Management 4815 West Markham Street
' Little Rock Arkansas 72201-3867 I
J j
i l
t i
Entergy Operations, Inc. :
B&W Nuclear Technologies ATTN: Robert B. Borsum Licensing Representative 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852 Admiral Kinnaird R. McKee, USN (Ret) 214 South Morris Street Oxford, Maryland 21654 ABB Combustion Engineering Nuclear Power ATTN: Charles B. Brinkman Manager, Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 A
t i
h i
9 L
I i
t i
=
m
r i
Entergy Operations, Inc. AUG - 31993 fbcc'tol.DMBL(IE45) l bcc distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Section Chief (DRP\\TSS)
Project Engineer (DRP/0)
E t
h RIV:DRP/D C:DRP/D N D:DRP WBJones:df SAFStetkahD ABBeachM 8/1 /93 8/t /93 8/ 3 /93 (
MEETING
SUMMARY
Licensee:
Entergy Operations, Inc.
Facility:
Arkansas Nuclear One License No.:
DPR-51 Docket No.:
50-313
Subject:
Refueling Outage Shutdown Risk Planning The licensee summarized for NRC management the initiatives planned for the upcoming refueling outage (IR11) with respect to minimizing the risk of core damage in the shutdown condition.
Attachments 1.
Attendance List 2.
Licensee Presentation (NRC distribution only) l i
i i
i
)
i I
~
i l
)
1 t
d 1
I ATTENDANCE LIST Attendance at the refueling outage meeting between Entergy Operations, Inc.,
i and NRC on July 19, 1993, at the Arkansas Nuclear One facility:
Enteray Operations. Inc.
M. Sellman, General Manager J. Fisicaro, Director, Licensing J. Yelverton, Vice President of Operations T. Van Schaik, Unit 1 Assistant Operation Manager B. Short, Unit 1 Operations Standards Supervisor J. Taylor-Brown, Director (Acting), Quality W. Eaton, Director Design Engineering T. Brown, Unit 1 Outage Manager D. Roderick, Unit 1 Assistant Outage Manager J. Vandergrift, Unit 1 Plant Manager D. Olson, Unit 1 Senior Outage Scheduler R. Clark, Nuclear Safety Analysis Design Engineer D. Boyd, Licensing Specialist NRC S. Collins, Director, Division of Reactor Safety (DRS)
T. Gwynn, Acting Director, Division of Reactor Projects (DRP)
T. Stetka, Chief, Project Section D, DRP i
D. Powers, Chief, Maintenance Section, DRS R. Bevan, Unit 1 Project Manager, Office of Nuclear Reactor Regulation L. Smith, Senior Resident Inspector at AND A. Gains, Resident inspector at ANO q
S. Campbell, Resident Inspector at AND
- j
- i i
I i
f f
1 l
Entergy Operations, Inc. AU3 - 31993 i
bec to DMB (IE45) bec distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS l
RIV File Section Chief (DRP\\TSS)
Project Engineer (DRP/D) t 1
4 r
i RIV:DRP/Du; C:DRP/D vik D:DRP Ik} [
WBJones;df
\\KFStetkaskh\\/
ABBeach-h*'
8/s/93 8/t /93 8/3 /93 h a