Forwards Insp Repts 50-277/93-14 & 50-278/93-14 on 930621-25.No Violations Identified
ML20046C443
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/13/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20046C444 List:
References
NUDOCS 9308110032
Download: ML20046C443 (3)


See also: IR 05000277/1993014

Text

.

.

tr S

N

JUL 131993

Docket Nos. 50-277

50-278

Mr. D. M. Smith

Senior Vice President-Nuclear

.

Philadelphia Electric Company

'

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, Pennsylvania 19087-0195

Dear Mr. Smith:

SUBJECT: COMBINED INSPECTION REPORT NUMBERS 50-277/93-14; 50-278/93-14

This refers to the announced safety inspection of maintenance activities conducted by

Mr. F. Bower of this office from June 21 - 25,1993, at Peach Bottom Units 2 and 3, Delta,

Pennsylvania, of activities authorized by NRC License Nos. DPR-44 and DPR-56 and to the

discussions of our findings held by Mr. F. Bower with members of your staff at the

conclusion of the inspection.

Areas important to public health and safety examined during this inspection are described in

,

the NRC Region I Inspection Report, which is enclosed with this letter. Within these areas,

the inspection consisted of selective examinations of procedures and records, interviews with

.

personnel, and observations by the inspector.

,

In summary, maintenance activities were conducted safely, in accordance with regulatory

requirements and, in most instances, in accordance with licensee approved procedures. A

potential personnel safety issue was identified. Minor Maintenance may be performed

downstream of a potential energy source that has been isolated by methods that are not

covered by procedures. Your Clearance and Tagging Manual does not provide clear

guidance and precautions for circumstances that may reduce personnel safety. Management

personnel at the exit meeting committed to review of this concern. The details for this issue

7

are contained in section 2.5 of the enclosed report.

,

Within the scope of this inspection, no unresolved items'nor violations of NRC requirements

were identified. We appreciate your cooperation with us.

OFFICIAL RECORD COPY

G:PB931414. INS

9308110032 930713

iI

PDR

ADOCK 05000277.

G

PDR _

/

g

!f

.

% ,

.

-

-

.

..

Mr. D. M. Smith

2

JUL 131993

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

its enclosures will be placed in the NRC Public Document Room.

Sincerely,

Original Signed By:

Lee 11. Bettenhat:sen

Lee H. Bettenhausen, Chief

Operations Branch

Division of Reactor Safety

Enclosure: Combined NRC Region I Inspection

Report Numbers 50-277/93-14 and

50-278/93-14

cc w/ encl:

J. Doering, Chairman, Nuclear Review Board

D. B. Miller, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Vice President, Nuclear Services Department

G. Cranston, General Manager, Nuclear Engineering Division

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

G. Edwards, Plant Manager

A. J. Wasong, Manager, Experience Assessment

G. A. Hunger, Jr., Manager, Licensing Section

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Director, Generation Projects Department,

Atlantic Electric

B. W. Gorman, Manager, External Affairs

R. McLean, Power Plant Siting, Nuclea' Evaluations

r

D. Poulsen, Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)-

-

-

NRC Resident Inspector

Commonwealth of Pennsylvania

TM1 - Alert (TMIA)

OFFICIAL RECORD COPY

G:PB931414. INS

.

_ _ _______ __ _ __, w

- -

r-

a

.

.

Mr. D. M. Smith

3

JUL 131993

bec w/ encl:

Region I Docket Room (with concurrences)

i

bec w/ encl: (Via E-Mail)

V. McCree, OEDO

J. Shea, NRR

M. Boyle, Acting PDI-2, NRR

(VIA F MAIL AND NO ATTACIIMENTS)

L. Bettenhausen, DRS

N. Blumberg, DRS

F. Bower, DRS

,

i

!

.

DRS:RI

DRS:RI

DRS:RI

Bower / jk/dm

berg

hausen

i

07/ /

q

07A 493

07/1493

OFFICIAL RECORD COPY

G:PB931414. INS