Discusses Insp Rept 50-285/93-12 on 930624-0716 & Forwards Notice of Violation.Nrc Concerned Re Unauthorized Maint in Switchyard Info Since Extensive Info Provided by NRC to Licensees Re Need to Ensure That Activities Controlled
ML20046C412
Person / Time
Site: Fort Calhoun 
Issue date: 08/04/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20046C413 List:
References
NUDOCS 9308110005
Download: ML20046C412 (4)


See also: IR 05000285/1993012

Text

.

h

pR RE C ,

UNIT E D ST AT ES

4

NUCLEAR REGULATORY COMMISSION

[&

y

.

fI

j

REGION IV

/

($2J%.

f

611 RYAN PLAZA DRIVE, SUITE 400

3

AR LINGTON, T E X AS 76011 8064

w

.....

AUG - 41993

Docket:

50-285

License: DPR-40

Omaha Public Power District

ATTN:

T. L. Patterson, Division Manager

Nuclear Operations

Fort Calhoun Station FC-2-4 Adm.

P.O. Box 399, Hwy. 75 - North of Fort Calhoun

Fort Calhoun, Nebraska 68023-0399

SUBJECT: NRC INSPECTION REPUT 50-285/93-12 (NOTICE OF VIOLATION)

This refers to the inspection conducted by Messrs. R. Mullikin, R. Azua, and

D. Kelley of this office on June 24 through July 16, 1993.

The inspection

included a review of activities authorized for your Fort Calhoun Station

facility. At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The purpose of the inspection was to determine

,

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, certain licensed activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). Two violations represent a failure to control switchyard

activities at your facility.

In addition, it was noted that inadequate and

ineffective communications between the work crews in the switchyard and the

licensed operator in the control room were contributing factors to this event.

We are particularly concerned regarding the unauthorized maintenance in the

switchyard since extensive information has been provided by the NRC to all

licensees regarding the need to ensure that switchyard activities are

controlled to prevent inadvertent offsite power interruptions. The violation

concerning an inadequate equipment tagout is important due to the potential

for personnel injury.

A management meeting has been scheduled for August 19, 1993, to gain a better

understanding of your view concerning the significance of this event, its

causes, and the actions you have taken and planned to ensure positive control

of switchyard activities.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

I

9308110005 930e04

l

,

PDR

ADOCK 05000285

G

PDR

- - . .

.

-

-.

--

-

i

i

ci

j

5

+

Omaha Public Power District

-2-

!

i

!

actions you plan to prevent recurrence. After reviewing your response to this

-

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

!

necessary to ensure compliance with NRC regulatory requirements.

>

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

!

'

this letter and its enclosures will be placed in the NRC Public Document Room.

I

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

,

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

!

Sincerely,

l

-

,/

,

'

,,

l

/

.

A. Bill Beach, Dir to

i

Division of Reacto P oje t

,

Enclosure:

.

Appendix - NRC Inspection Report

i

50-285/93-12 w/ attachments

!

-i

cc w/ enclosure:

e

LeBoeuf, Lamb, Leiby & MacRae

i

ATTN: Harry H. Voigt, Esq.

l

1875 Connecticut Avenue, NW

Washington, D.C.

20009-5728

j

Washington County Board

l

of Supervisors

ATTN: Jack Jensen, Chairman

i

Blair, Nebraska 68008

Combustion Engineering, Inc.

ATTN: Charles B. Brinkman, Manager

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852

_

_

.

-

- _.

.

.

!

<

.

'

{

' Omaha Public Power District

-3-

i

-l

Nebraska Department of Health

ATTN: Harold Borchert, Director

Division of Radiological Health

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509-5007

L

!

Fort Calhoun Station

ATTN: James W. Chase, Manager

P.O. Box 399

Fort Calhoun, Nebraska 68023

I

&

b

i

!

-

,

W

,

f

i

I

i

I

i

,

l

i

1

, . - - .

~

_ , _ _ _ _ _ _ _ _ _ _ _ .

-

4

Omaha Public Power District

-4-

@ _f gg

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

DRSS-FIPS

MIS System

RIV File

Section Chief (DRP/TSS)

Lisa Shea, RM/ALF, MS: MNBB 4503

Senior Resident Inspector - Cooper

D.

Kelley, DRS

D.

Powers, DRS

A. Beach, D/DRP

r.

,

p ~.

RIV: SRI

DRS/MSOk

C:DRS/MS M

C:DRP/TSS

D:DRP N d

a

PHarrell[M

ABBeach

RMullikikb

DKelley

i

DPowers

07/f/93

07/26/93

07j24/93

07/2 &/93

Oh Y/93h