h
pR RE C ,
4
NUCLEAR REGULATORY COMMISSION
[&
y
.
fI
j
REGION IV
/
($2J%.
f
611 RYAN PLAZA DRIVE, SUITE 400
3
AR LINGTON, T E X AS 76011 8064
w
.....
AUG - 41993
Docket:
50-285
License: DPR-40
Omaha Public Power District
ATTN:
T. L. Patterson, Division Manager
Nuclear Operations
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399, Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPUT 50-285/93-12 (NOTICE OF VIOLATION)
This refers to the inspection conducted by Messrs. R. Mullikin, R. Azua, and
D. Kelley of this office on June 24 through July 16, 1993.
The inspection
included a review of activities authorized for your Fort Calhoun Station
facility. At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The purpose of the inspection was to determine
,
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
Based on the results of this inspection, certain licensed activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). Two violations represent a failure to control switchyard
activities at your facility.
In addition, it was noted that inadequate and
ineffective communications between the work crews in the switchyard and the
licensed operator in the control room were contributing factors to this event.
We are particularly concerned regarding the unauthorized maintenance in the
switchyard since extensive information has been provided by the NRC to all
licensees regarding the need to ensure that switchyard activities are
controlled to prevent inadvertent offsite power interruptions. The violation
concerning an inadequate equipment tagout is important due to the potential
for personnel injury.
A management meeting has been scheduled for August 19, 1993, to gain a better
understanding of your view concerning the significance of this event, its
causes, and the actions you have taken and planned to ensure positive control
of switchyard activities.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
I
9308110005 930e04
l
,
ADOCK 05000285
G
- - . .
.
-
-.
--
-
i
i
ci
j
5
+
Omaha Public Power District
-2-
!
i
!
actions you plan to prevent recurrence. After reviewing your response to this
-
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
!
necessary to ensure compliance with NRC regulatory requirements.
>
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
!
'
this letter and its enclosures will be placed in the NRC Public Document Room.
I
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
,
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
!
Sincerely,
l
-
,/
,
'
,,
l
/
.
A. Bill Beach, Dir to
i
Division of Reacto P oje t
,
Enclosure:
.
Appendix - NRC Inspection Report
i
50-285/93-12 w/ attachments
!
-i
cc w/ enclosure:
e
LeBoeuf, Lamb, Leiby & MacRae
i
ATTN: Harry H. Voigt, Esq.
l
1875 Connecticut Avenue, NW
Washington, D.C.
20009-5728
j
Washington County Board
l
of Supervisors
ATTN: Jack Jensen, Chairman
i
Blair, Nebraska 68008
Combustion Engineering, Inc.
ATTN: Charles B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite 330
Rockville, Maryland 20852
_
_
.
-
- _.
.
.
!
<
.
'
{
' Omaha Public Power District
-3-
i
-l
Nebraska Department of Health
ATTN: Harold Borchert, Director
Division of Radiological Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
L
!
Fort Calhoun Station
ATTN: James W. Chase, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
I
&
b
i
!
-
,
W
,
f
i
I
i
I
i
,
l
i
1
, . - - .
~
_ , _ _ _ _ _ _ _ _ _ _ _ .
-
4
Omaha Public Power District
-4-
@ _f gg
bcc to DMB (IE01)
bcc distrib. by RIV:
J. L. Milhoan
Resident Inspector
DRSS-FIPS
MIS System
RIV File
Section Chief (DRP/TSS)
Lisa Shea, RM/ALF, MS: MNBB 4503
Senior Resident Inspector - Cooper
D.
Kelley, DRS
D.
Powers, DRS
A. Beach, D/DRP
r.
,
p ~.
RIV: SRI
DRS/MSOk
C:DRS/MS M
C:DRP/TSS
D:DRP N d
a
PHarrell[M
ABBeach
RMullikikb
DKelley
i
DPowers
07/f/93
07/26/93
07j24/93
07/2 &/93
Oh Y/93h