Requests That Util Provide Schedule for Completion of Original CAP Since Util Withdrew Deviation & Described Actions That Have Been Taken to Address Catd,Per
ML20046C379
Person / Time
Site: Sequoyah  
Issue date: 07/20/1993
From: Labarge D
Office of Nuclear Reactor Regulation
To: Medford M
Tennessee Valley Authority
References
TAC-M76941 NUDOCS 9308100220
Download: ML20046C379 (3)


Text

.

%l, July 20, 1993 Docket Nos. 50-327 q

and 50-328 i

Tennessee Valley Authority ATIN:

Dr. Mark 0. Medford, Vice President i

Technical Support 3B Lookout Place

i 1101 Market Street Chattanooga, Tennessee 37402-2801

Dear Dr. Medford:

SUBJECT:

TVA CORRECTIVE ACTION PLAN DEVIATION 223.03-SQN-01, SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 (TAC N05. M76941 AND 1

J M76942)

By letter dated April 15, 1991, we forwarded our evaluation of various.

I submittals from the Tennessee Valley Authority.'(TVA) describing the Employee Concerns Special Program (ECSP) process for deviating from a correct.ive action plan (CAP).

The only CAP deviation that was found to be unacceptable for Sequoyah was the deviation for Corrective Action Tracking Document (CATD) 223.03-SQN-01, " Seismic Adequacy of Field-Mounted Instruments." This finding was based on TVA letter dated June 8, 1990, which described the deviation, but did not provide justification for the deviation.

By letter dated July 7, 1993, TVA withdrew the deviation and described the actions'that have been taken to address the CATD.

The staff recognizes that by withdrawing the deviation, TVA will take the necessary action to address the original CAP.

It is requested that TVA provide a schedule for completion of the original CAP to the staff. This action closes TAC Nos. M76941 and M76942.

Sincerely, Original signed by David E.'LaBarge, Senior, Project Manager Project Directorate 11-4.

Division of Reactor Projects

I/II Office of Nuclear Reactor Regulation Cc:

'See next page i

L OFC:

PDIl-4/LA PDII-4/PM)[

EMER7;,9-PDil-)4 /D NAME:

BClayton [

DLaBarge Jfbg FHeMo'n j

DAT E:

1 /R /93 7 //3/93 7 /::v/93 7 Aq/93 DOCUMENT NAME: '76941.LlR

- wp (WiY gB100220930720 k' [3 S

ADOCK 050000gy p

PDR 1 0 Ji

y Tennessee Valley Authority Sequoyah Nuclear Plant ATTN: Dr. Mark 0. Medford cc:

Mr. W. H. Kennoy, Director County Judge Tennessee Valley Authority Hamilton County Courthouse ET 12A Chattanooga, Tennessee 37402 400 West Summit Hill Drive Knoxville, Tennessee 37902 Regional Administrator U.S.N.R.C. Region II Mr. R. M. Eytchison, Vice President 101 Marietta Street, N.W.

Nuclear Operations Suite 2900 Tennessee Valley Authority Atlanta, Georgia 30323 3B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. William E. Holland Senior Resident Inspector Sequoyah Nuclear Plant Mr. B. S. Schofield, Manager U.S.N.R.C.

Nuclear Licensing and Regulatory Affairs 2600 Igou Ferr'y Road Tennessee Valley Authority Soddy Daisy, Tennessee 37379 5B Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. Robert Fenech, Vice President Sequoyah Nuclear Plant

/

Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, Tennessee 37379 l

TVA Representative Tennessee Valley Authority 11921 Rockville Pike Suite 402 Rockville, Maryland 20852 Mr. Ralph Shell, Site Licensing Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 i

Soddy Daisy, Tennessee 37379 Mr. Michael H. Mobley, Director Division of Radiological Health 3rd Floor, L and C Annex 401 Church Street Nashville, Tennessee 37243-1532 General Counsel Tennessee Valley Authority ET 11H 400 West Summit Hill Drive Knoxville, Tennessee 37902

C 3..

e, Distribution Docket File ~

f1RC & Local PDRs SON Rdg. File S. Varga G. Lainas F. Hebdon W. Holland J. Crlenjak P. Kellogg E. Merschoff D. LaBarge B. Clayton OGC ACRS (10)

O d

9 I

i

___-_-mm-_-__--__.-e--=

- " ^ - - - - - - " - ^

- - -