Provides Response to Generic Ltr 93-04, Rod Control Sys Failure & Withdrawal of Rod Control Cluster Assemblies. Rod Control Sys Deenergized as Part of Permanent Shutdown Process & No Longer Operable
ML20046C339
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 08/04/1993
From: Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-93-04, GL-93-4, NUDOCS 9308100160
Download: ML20046C339 (3)


Text

.;

O

~ j Portland General ElectricCompany James E. Cross Vice President and Chief Nuclear Officer Trojan Nuclear Plant Docket 50-344 License NPF-1 August 4, 1993 U.S. Nuclear Regulatory Commission Attn: Document Control Desh Washington, DC 20555

Dear Sirs:

Trojan Nuclear Plant Response to Generic Letter 93-04 Rod Control System Failure and Withdrawal of Rod Control cluster Assemblies Generic Letter 93-04 required licensees to provide an assessment of whether or not the licensing basis for the facility remains satisfied with regard to the requirements for system response to a single failure in the rod control system in light of information generated as a result of the Salem event.

This letter provides Portland General Electric Company's response to Generic Letter 93-04 with respect to the Trojan Nuclear Plant.

On January 4, 1993, the Board of DLrectors for Fortland General Electric Company (PGE) decided to permanently cease operation of the Trojan Nuclear Plant.

In support of this decision, the reactor was defueled and the irradiated fuel assemblies were placed in the spent fuel pool. On March 24, 1993, the Nuclear Regulatory Commission issued an order prohibiting movement of fuel into the Trojan Containment Building.

This order was followed on May 5, 1993, by the issuance of an amendment to the Trojan Operating _ License which allows possession of, but not the use of, reactor fuel at Trojan.

Since the current licensing basis for Trojan prohibits movement of. fuel into the Containment Building, the use of the Control Rod Drive System within a functional reactor core at Trojan is effectively prohibited.

Therefore, a.

single failure of the Rod Control System would have no effect upon fuel design limits. Additionally, the Rod Control System has been deenergized as part of the permanent shutdown process and is no longer operable.

Sincerely py=

S. M. Quennoz for J. E. Cross

.I 9308100160 930804 Fl P

PDR

[+

-- {U<

PDR ADOCK 05000344 8

\\

\\

\\

i21 S W Salmon Stree@ art!ani Oregon 97204 (503) 464-8897

Trojan Nuclear Plant Document Control Desk Docket 50-344 Augustf4, 1993 License NPF-1 Page 2 c:

Mr. Bobby Faulkenberry Regional Administrator, Region V U.S. Nuclear Regulatory Commission Mr. David Stewart-Smith state of Oregon Department of Energy Mr. James Melfi NRC Resident Inspector Trojan Nuclear Plant i

r I

l l

i 1

)

l 1

-I i

i j

j

a

.o 9

STATE OF OREGON,

)

)

)

COUNTY OF COLUMBIA )

I, S. M. Quennoz, being duly sworn, subscribe to and say that I am the General Manager, Trojan Nuclear Plant for Portland General Electric Company, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information, and belief the statements made in it are true.

Date NCrW 1993 A &-

Q S. M. Quennoz General Manager, Trojan Nuclear Plant Portland General Electric Company On this day personally appeared before me S. M. Quennoz, to me known to be the individual who executed the foregoing instrument, and acknowledged that he signed the same as his free act.

GIVEN under my hand and neal this b day of On.ne.3[~

1993.

N/Gv<d Y)7 Nkit n Yrur Notary Public in and for the i

State of Oregon

.*Nf((s..,

d.

\\

.s

',f N' lYll.jO j My commission expires 8-99-W Residing at b2)/ ndd

-. % l'U ULIO (.';l^

[, n E

,.,s r (1 4

w my w-- - - - -

w m

-