ML20046C167
| ML20046C167 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 07/19/1993 |
| From: | Wermiel J Office of Nuclear Reactor Regulation |
| To: | Ashley R AFFILIATION NOT ASSIGNED |
| References | |
| NUDOCS 9308090286 | |
| Download: ML20046C167 (1) | |
Text
.
.=.
July 19, 1993 i
Mr.
R. Ashley AIB - Vincotte Nuclear 2
Avenue du Roi 157-B-1060 Brussels, Belgium
Dear Mr. Ashley:
During the meeting between AVN and the U.S. NRC on June 25, 1993, l
it was requested that the NRC provide AVN with a copy of the approved Westinghouse software verification and validation plan for the Eagle-21 digital instrumentation and control system retrofit for Zion Nuclear Power Stati1n.
The only version of j
this document, Topical Report WCAP-12374 entitled " Eagle-21 Microprocessor - Based Process Protection System" is marked "WEC l
Proprietary Class 2",
and as such can not be released by the NRC.
However, I suggest that you contact the Westinghouse Energy Systems Europe Office, Rue de Stalle, 73-B-1180, Brussels, phone 3223702718, and ask for a copy of this document.
We appreciate the opportunity to have met with you to discuss digital instrumentation and control system issues.
If I can be of further assistance, call ne at 301-504-2821.
j r
Original signed by:
l Jared S.
Wermiel, Chief, f
Instrumentation and Controls Branch Division of Reactor Controls l
and Human Factors Office of Nuclear Reactor Regulation CC.
PDR HICB R/F J. Wermiel BC:HIqB:,DRCH WNhmel J.
i 7/ /I'/ 93
[
Name: Ashley.Ltr i
9308090286 93071o I l0!
I[-
PDR ADOCK 05000295 P
/
i i
l l