ML20046C167

From kanterella
Jump to navigation Jump to search
Discusses 930625 Meeting Between Avn & NRC Re Request That NRC Provide Avn W/Copy of Approved Westinghouse Software Verification & Validation Plan for Plant.Document Can Not Be Released by NRC
ML20046C167
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/19/1993
From: Wermiel J
Office of Nuclear Reactor Regulation
To: Ashley R
AFFILIATION NOT ASSIGNED
References
NUDOCS 9308090286
Download: ML20046C167 (1)


Text

.

.=.

July 19, 1993 i

Mr.

R. Ashley AIB - Vincotte Nuclear 2

Avenue du Roi 157-B-1060 Brussels, Belgium

Dear Mr. Ashley:

During the meeting between AVN and the U.S. NRC on June 25, 1993, l

it was requested that the NRC provide AVN with a copy of the approved Westinghouse software verification and validation plan for the Eagle-21 digital instrumentation and control system retrofit for Zion Nuclear Power Stati1n.

The only version of j

this document, Topical Report WCAP-12374 entitled " Eagle-21 Microprocessor - Based Process Protection System" is marked "WEC l

Proprietary Class 2",

and as such can not be released by the NRC.

However, I suggest that you contact the Westinghouse Energy Systems Europe Office, Rue de Stalle, 73-B-1180, Brussels, phone 3223702718, and ask for a copy of this document.

We appreciate the opportunity to have met with you to discuss digital instrumentation and control system issues.

If I can be of further assistance, call ne at 301-504-2821.

j r

Original signed by:

l Jared S.

Wermiel, Chief, f

Instrumentation and Controls Branch Division of Reactor Controls l

and Human Factors Office of Nuclear Reactor Regulation CC.

PDR HICB R/F J. Wermiel BC:HIqB:,DRCH WNhmel J.

i 7/ /I'/ 93

[

Name: Ashley.Ltr i

9308090286 93071o I l0!

I[-

PDR ADOCK 05000295 P

PDR

/

i i

l l