ML20046C018

From kanterella
Jump to navigation Jump to search
Submits Daily Highlights Re Meeting w/ABB-CE in Windsor,Ct to Discuss Status of Steel Containment Design Verification for ABB-CE Sys 80+
ML20046C018
Person / Time
Site: 05200002
Issue date: 08/04/1993
From: Stewart Magruder
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Russell W
NRC
References
NUDOCS 9308090121
Download: ML20046C018 (4)


Text

ec/u tf&

l s

gm Rf C

/

UNITED STATES E 'PI'tE NUCLEAR REGULATORY COMMISSION i

{ \\'(

[

WASHINGTON, D.C. 20555N1 j

\\...../

August 4, 1993 j

Docket No.52-002 l

i I

MEMORANDUM FOR:

T. Murley G. Lainas R. Zimmerman F. Miraglia J. Roe B. Boger l

W. Russell J. Zwolinski C. Thomas l

l J. Partlow E. Adensam F. Congel D. Crutchfield B. Grimes E. Butcher t

W. Travers J. Wiggins W. Bateman, EDO T. Gody, Acting B. D. Liaw A. Vietti-Cook S. Varga A. Thadani Operations Center

~

J. Calvo M. Virgilio C. Rossi THRU:

R. W. Borchardt, Acting Director-t Standardization Project Directorate h Associate Directorate for Advanced Reac r and License Renewal Office of Nuclear. Reactor Regulation FROM:

Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

SUBJECT:

DAILY HIGHLIGHT - FORTHCOMING MEETING WITH ABB-COMBUSTION ENGINEERING (ABB-CE) FOR SYSTEM 80+ (STEEL CONTAINMENT DESIGN REVIEW)

DATE AND TIME:

August 10, 1993 (2:30 p.m. - 5:30 p.m.)

August 11, 1993 (8 a.m. - 5 p.m.)

LOCATION:

ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 PURPOSE:

Meeting to review the status of the steel containment design verification for ABB-CE System 80+.

A proposed agenda is enclosed.

c 4

NRC FRICBER COPY I

9308090121 930803 PDR ADOCK 05200002 PDR A

3 l\\t

. August 4, 1993 PARTICIPANTS *:

NRC ABB-CE G. Bagchi L. Gerdes S. Ali D. Baisley T. Wambach J. Stevens DE&S AMES T. Oswald L. Greimann l

R. Kaiser F. Fanous S. Safar (Original signed by)

Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

Meeting Agenda cc w/ enclosure:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Reaister 28058, 6/28/78. Members of the public who wish to attend should contact me at (301) 504-3139.

DISTRIBUTION:

Docket File PDST R/F MCullingford, 12E18 RBorchardt PDR TWEssig JNWilson TVWambach MXFranovich SMagruder PShea EJordan, MNBB 3701 OPA TGody, EDO ACRS (11) (w/o encl)

P0' Dell, PTSB JMoore, 15B18 J0'Brien, RES GBagchi, 7H15 SAli, 7H15 NRR Mailroom, 12G18 0FC:

LA:PDST:ADAR PM:PDST:ADAR (A)SC g :

R NAME: PShea g,SMagruder @

TWEss7d# [

08/ ///93 08/ i /93 08/t{/93 DATE:

0FFICIAL DOCUMENT COPY: CEMTG810.SLM 1

)

^.

4 ABB-Combustion Engineering, Inc.

Docket No.52-002 cc:

Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.

205B5 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C.

20503 Mr. Raymond Ng 1776 Eye Street, N.W.

Suite 300 i

Washington, D.C.

20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C.

20037-1128 j

Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500

/

SYSTEM 80+ STEEL CONTAINMENT DESIGN VERIFICATION STATUS REVIEW MEETING August 10 AND 11, 1993 PROPOSED AGENDA 1.

Introduction

  • ABB-CE/DESI
  • NRC Comments 2.

ANSYS Computer Code Verification A.

Theoretical Solution B.

Computer Code Solution Model

  • Method Results 3.

System 80+ Steel Containment.

A.

Stability Analysis Model a

i Input Loads Solution Method Results B.

Service Level Analysis Model Input Loads Results i

1 4.

Wrap Up - Further Actions Enclosure

-