GPU Nuclear Corporation G E Nuclear "r e tr*
Middletown. Pennsylvania 17057-0480 (717)944-7621 Writer's Direct Dial Number:
(717) 948-8005 August 2, 1993 C311-93-2111 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Three Mile Island Nuclear Generating Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Cycle 9 Core Operating Limits Report, Revision 3 Pursuant to TMI-1 Technical Specification Section 6.9.5.4, enclosed is a copy of the Cycle 9 Core Operating Limits Report, Revision 3.
This revision incorporates changes made to the Core Operating Limits Report as a result of the extension of Cycle 9 from 590 to 650 Effective Full Power Days.
This revision also incorporates reload methodology references currently listed in Technical Specification Section 6.9.5 to support THI-I Technical Specification Change Request No. 225, submitted to NRC on June 7, 1993 (C311-93-2070).
The cycle-specific core operating limits contained in this report have been determined in accordance with Technical Specification 6.9.5.
If additional information is required, please contact us.
Sincerely, 37 4
T. G. Broughton Vice President and Director, TMI-l TGB/DJD/amc Enclosure cc: Region I, Administrator TMI-1 Senior Resident Inspector THI-1 Senior Project Manager 9308060289 930B02 P