ML20046B680
| ML20046B680 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 07/28/1993 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Hutchinson C Entergy Operations |
| References | |
| NUDOCS 9308060060 | |
| Download: ML20046B680 (3) | |
Text
-_
,t il \\x -n (3f Td i
JUL 2 81933 i
'T
!{,'bu.
Qg
.a.
g I
Docket No. 50-416 License No. NPF-29 Entergy Operations, Inc.
ATTN:
C. R. Hutchinson, Vice President Operations - Grand Gulf Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150 j
1 Gentlemen:
j
SUBJECT:
NRC CONFIRMATORY MEASUREMENTS PROGRAM As part of the NRC Confirmatory Measurements Program, liquid samples spiked with beta emitting radionuclides were recently sent to the Grand Gulf facility.
i for radiochemical analyses. The spiked samples, with instructions, were sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory on July 8,1993. These samples are to be analyzed for tritium, iron-55, strontium-89, and strontium-90 concentrations in accordance with your approved procedures for analysis of liquid waste j
samples.
If routine analyses of this type are normally performed by a vendor, j
your vendor should be used to analyze the spike samples.
We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of this letter.
Results should be sent to U. S.
j Nuclear Regulatory Commission, Region II, ATTN: Mr. T. R. Decker, 101 j
Marietta Street, Suite 2900, Atlanta, GA 30323. Our evaluation of your i
results will be discussed with your staff and transmitted by letter. Spiked j
samples will be sent to you on an annual basis as part of our routine inspection program.
If you have any questions regarding this program, please contact Mr. Norman McNeill at 404-331-5094 or Mr. Thomas R. Decker at 404-331-2559.
Sincerely, omstMA1.SGNLD BY i
giu;,M E. CUNE William E. Cline, Chief Radiological Protection and Emergency Preparedness Branch i
Division of Radiation Safety and Safeguards cc:
(See page 2) jD 9308060060 930728 PDR ADDCK 05000416 p
PDR ^
3 935
}
+
Entergy Operations, Inc.
2 e
cc:
Mr. H. W. Keiser, Executive Vice President and Chief Executive Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150 M. J. Meisner, Director Nuclear Licensing i
Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150 Mike Morre, Attorney General t
Frank Spencer, Asst. Attorney General State of Mississippi P. O. Box 22947 Jackson, MS 39225 J. P. McGaha Vice President, Operations Support Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 R. B. McGehee, Esq.
Wise, Carter, Child, Steen and Caraway P. O. Box 651 Jackson, MS 39205 N. S. Reynolds, Esq.
Winston & Strawn 1400 L Street, NW, 12th Floor Washington, D. C.
20005-3502 Alton B. Cobb, M.D.
State Health Officer State Board of Health P. O. Box 1700 Jackson, MS 39205 cc:
(Cont'd on page 3)
.g-
4 Entergy Operations, Inc.
3 (cc: cont'd)
The Honorable William J. Guste, Jr.
Attorney General Department of Justice State of Louisiana P. O. Box 94005 Baton Rouge, LA 70804-9005 Office of the Governor State of Mississippi Jackson, MS 39201 Sam Mabry, Chief Hazardous Waste Division Mississippi Department of Environmental Quality P. O. Box 10383 Jackson, MS 39209 President Clairborne County Board of Supervisors Port Gibson, MS 39150 K. G. Hess Vice President Bechtel Power Corporation P. O. Box 2166 Houston, TX 77252-2166 W. W. Watson i
Project Manager Becht Power Corporation P. O. Box 808 4600 W. Main Russellville, AR 72801 bec:
P. O'Connor, NRR l
F. Cantrell, RII j
Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission i
Route 2, Box 399 Port Gibson, MS 39150 DT.I:DRSS RII:DRSS R I: RP TD b ecker FC rell o
7/rf93 7/5/93 7/ /
<