ML20046B266
| ML20046B266 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/27/1993 |
| From: | Bores R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20046B267 | List: |
| References | |
| NUDOCS 9308040005 | |
| Download: ML20046B266 (3) | |
See also: IR 05000277/1993013
Text
__.
- - - - _ _
i
(
.
..
N 2 1 1993
Docket Nos. 50-277, 50-278
Mr. D. M. Smith
Senior Vice President-Nuclear
Philadelphia Electric Company
Nuclear Group Headquarters
Cormspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
Dear Ir. Smith:
SUBJECT: NRC Combined Inspection Nos. 50-277/93-13; 50-278/93-13
An announced inspection at the Peach Bottom Atomic Power Station was conducted by.
Messrs. J. Noggle and L. Ecken on June 17 and June 21-23,1993. The inspection findings
were discussed with members of your staff on June 23,1993.
Areas reviewed during the inspection were imponant to health and safety and are discussed
in the enclosed inspection report. These areas included quality assurance audits and
surveillances, training and qualifications of personnel, the radwaste and health physics
organization, implementation of the radwaste program, radioactive material shipping records,
interim radwaste storage, scaling factors, and contamination control.
The audit and radwaste pmgrams were well implemented. The radwaste and transportation
training program was adequately implemented. A downward trend in radwaste volume
genemtion was noted. Radwaste and Radiological Controls staffing was sufficient to
implement responsibilities. An increase in the amount of technical Health Physics expertise
at the station was noted. No radiological safety concerns or violations of regulatory
requirements were identified.
030017
OFFICIAL RECORD COPY
l
9300040005 930727
- "l$
%.
r
ADOCK 05000277
-
- ?,r'
l
G
-
w.
.. .
..
.
.
.
..
.
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ . . . . . _
.
.
-
-
-
-
.
JUL 2 7 1993
j
.p
-
!
No response to this letter is required. Your cooperation with us is appreciated.
l
Sincerely,
,
Original Signed By:
Robert J. Borcs
James H. Joyner, Chief -
Facilities Radiation Safety and
Safeguards Branch
Division of Radiation Safety and
Safeguards
Enclosure: NRC Inspection Report No. 50-277/93-13; 50-278/93-13
l
cc w/ encl.
J. Doering, Chairman, Nuclear Review Board
j
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
'
G. Rainey, Vice President, Nuclear Services Department
G. Cranston, General Manager, Nuclear Engineering Division
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
A. J. Wasong, Manager, Experience Assessment
G. A. Hunger, Jr., Manager, Licensing Section
,
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Director, Generation Projects Department,
Atlantic Electric
B. W. Gorman, Manager, External Affairs
R. McLean, Power Plant Siting, Nuclear Evaluations
,
D. Poulsen, Secretary of Harford County Council
l
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
NRC Resident Inspector
Commonwealth of Pennsylvania
,
'
TMI - Alert (TMIA)
OFFICIAL RECORD COPY
-
.. .
--
.
,
.
3
M- 2 7 1993
bec w/ encl:
Region I Docket Room (with concurrences)
'
!
bec w/ encl: (Via E-Mail)
V. McCree, OEDO
l
Joseph Shea, NRR
.;
M. Boyle, PDI-2, NRR (acting)
{
t
U
'
.
,
l
!
i
s
,
B
!
-
<
i
l
1
,
CONCURRENCES:
~01
ag
1
88 e
Eckert
oyner
i
RI:FRPS
RI:FRPS
S
RI:FRSSB
7/7,2/93
7hz/93
7/[J//93
7/r1/93
'
OFFICIAL RECORD COPY