ML20046B097
| ML20046B097 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 07/23/1993 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Frizzle C Maine Yankee |
| References | |
| NUDOCS 9308030096 | |
| Download: ML20046B097 (3) | |
Text
CC 5 Docket No. 50-309 JUL 2 31993 Mr. Charles D. Frizzle President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336
Dear Mr. Frizzle:
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation on July 19, 1993, between Mr. D. Silk and Mr. M. Evringham, arrange'ents were made for the administration of licensing examinations at the Maine Yankee uclear Power Station.
The written examinations and operating tests are scheduled for the week of November 15, 1993. Your staff will be given an opportunity to review the licensing examinations in accordance with the guidelines in NUREG-1021, " Operator Licensing Examiner Standards," (ES-201, Attachment 4) prior to the administration of the examinations.
To prepare the examinations and meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 2 of ES-201 by September 15, 1993. Any delay in receiving approved and indexed reference material or the j
submittal of inadequate or incomplete reference material may result in the examination being rescheduled.
The NRC will prepare and administer the written examinations in accordance with ES-401 i
and ES-402 of NUREG-1021. In order to conduct the requested examinations, it will be necessary for your staff to provide adequate space and accommodations on the date noted above. The NRC's guidelines for administering the written examinations are described in ES-402, Attachment 1.
The NRC will prepare and administer the operating 1 sts in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests, it will be necessary for your staff to make the simulation facility available on the dates noted above. Your staff should retain the original simulator performance data (e.g., system pressures, temperatures, j
and levels) generated during the dynamic operating tests until the examination results are fmal.
OFFICIAL RECORD COPY G:MY1115
/h}
{j 9308030096 930723 PDR ADOCK 05000309 V
N Mr. Charles D. Frizzle 2
jg ?, S ES-402, Attachment 2, and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examiration and operating tests are being administered.
Your staff should submit preliminary reactor and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31,1995. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering, xeroxing, and mailing the required material. Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office ofInformation and Regulatory Affairs, NEOB-3019, Office of Management and Budget, Washington, D.C. 20503.
1 i
Thank you for your consideration in this matter. Mr. Evringham has been advised of the NRC guidelines and policies addressed in this letter. If you have any questions on the
)
evaluation process, please contact me at (215) 33'/-5211.
Sincerely, i
Original Signed Bw Glenn W. Mcysr ~
Glenn W. Meyer, Chief PWR Section Operations Branch i
Division of Reactor Safety OFFICIAL RECORD COPY G:MY1115
i Mr. Charles D. Frizzle 3
JUL 2 31993 cc:
G. Ixitch, Vice President. Operations P. L. Andersoa, Project Manager (Yankee Atomic Electric Company)
R. W. Blackmore, Plant Manager A. Shean, Manager - Training J. Kirsch, Supervisor - Operations Training M. Evringham, Training Manager J. A. Ritsher, Attorney (Ropes and Gray)
P. Dostie, State Nuclear Safety Inspector Peter Brann, Assistant Attorney General U. Vanags, Maine State Planning Orrice C. Brinkman, Combustion Engineering, Inc.
First Selectmen of Wiscasra Maine State Planning Otticer Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Maine, SLO Designee bec:
Region I Docket Room (with concurrences)
D. Silk, DRS OL Facility File DRS File bec (VIA F MAIL):
V. McCree, OEDO E. Tronier, LPM, NRR W. Butler, NRR l
(VJ
-MA,
.'ND NO ATTACIIMENT) l G.Mt.er N l
RI:DRS RI:DRS S
mg Meyer C 07/20793 2
07/ 1/93 t
2f OFFICIAL RECORD COPY G:MYl115
_