| Site: | Limerick |
| Issue date: | 07/23/1993 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20046B080 | List: |
| References | |
| NUDOCS 9308030071 | |
| Download: ML20046B079 (3) | |
See also: IR 05000352/1993014
Text
DC "~)
_.
%
-
.,
,
'~
JUL 2 31993
Docket Nos. 50-352
'
50-353
Mr. D. M. Smith .
Senior Vice President-Nuclear
Philadelphia Electric Company
Nuclear Gup Headquarters
'
Correspondence Control Desk
P.O.' Box 195
Wayne, Pennsylvania 19087-0195
,
Dear Mr. Smith:
L
SUBJECT:
NRC INSPECTION REPORT NOS. 50-352/93-14 AND 50-353/93-14
This letter refers to the inspection conducted by Messrs. N. Perry, and T. Easlick of this
office on May 25 through July 6,1993. The inspection included a review of activities
authorized for your Limerick Generating Station facility. At the conclusion of the inspection,
the findings were discussed with Mr. R. Boyce of your staff.
,
$
The inspection focused on issues important to ensuring the public health and safety. Areas
examined during the inspection are identified in the report. Within these areas, the
!
inspection consisted of observations of activities, reviews of documents and interviews with
plant personnel. The purpose of the inspection was to determine whether activities
i
authorized by the license wee conducted safely and in accordance with NRC requirements.
j
Based on the results of this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice of Violation (Notice). The
3
violations are of concern because in one case it should have been prevented by pnor
_
corrective actions and in the other case corrective actions were not timely.
j
i
Although Sectic,n 2.201 provides for a written statement of explanation to this office within
20 days of your receipt of this Notice, we note that these violations have been corrected and
those actions, including your root cause analysis, were reviewed during this inspection.
Therefore, N response with respect to this matter is required.
Additionally, in three instances, we have exercised enforcement discretion because of your
identification of the events and your corrective actions and you met all the criteria of 10
CFR, Appendix C,Section VII B2. One involved two late NRC notifications required by 10
- l
CFR 50.72. Anothu was due to a missed surveillance, for a primary containment isolation
valve, required by technical specifications. The last concerns the failure to implement a
i
technical specification action statement for an inoperable emergency diesel generator.
l
9308030071 930723
/
,
PDR- ADOCK 05000352
[
l l
G
'
'
1
l
.
,
L
1
-
.
!
JUL 2 31993
- -
Philadelphia Electric Company
2
j
'
Although 2 cited and 3 non-cited violations were identified in this report, we noted that some
of the events occurred prior to this inspection period, but followup was not conducted or
completed until this inspection period. In all cases, our inspectors found the followup
,
investigations to be comprehensive. We encourage you to continue _to improve this process
and keep our inspectors informed of your progress.
'
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
The enclosed Notice is not subject to the clearance procedures of the Office of Management
and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
_1
'
Sincerely,
ORIGINAL SIGNED BY
}
Edward C. Wenzinger, Chief
l
Projects Branch No. 2
Division of Reactor Projects
,
Enclosures:
1. Notices of Violation
2. NRC Region I Inspection Report 50-352/93-14 & 50-353/93-14
j
cc w/encis-
J. Doering, Chairman,. Nuclear Review Board
D. R. Helwig, Vice President - Limerick Generating Station
i
G. A. Hunger, Jr., Manager - Licensing Section
i
J. L. Kantner, Regulatory Engineer - Limerick Generating Station
Secretary, Nuclear Committee of the Board
-1
~!
Public Document Room (PDR)-
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
-l
K. Abraham, PAO (2)
I
NRC Resident Inspector, Limerick
Commonwealth of Pennsylvania
i
i
.l
E
..
. - - .
__ . _ _ _ _ .. ..
,
-
-
.
,
Philadelphia Electric Company
3
l
bec w/ encl:
Region I Docket Room (with concurrences)
i
bec w/ encl: (Via E-Mail)
D. Wheeler, OEDO
)
F. Rinaldi, NRR
j
M. Boyle, (Acting) PDI-2, NRR
j
J. Clifford, NRR
J
,
,
h
-F
'l
l
!
(jg
C Q
t
Yd'y
R!:D9P
R':i2EP
?
i
.f4 /
NPerry
2/M;icn
3W nihlp
l
i
7/3V93
7/t493
'I f/93
OF"'CIAL RECORD CO?Y
3:93149314. lgs
i
-j
u
.l
'!
l
1
'
,
.
.