ML20046A652

From kanterella
Jump to navigation Jump to search
Notice of Receipt of 930324 Petition Under 10CFR2.206 Re Us PWRs
ML20046A652
Person / Time
Issue date: 06/07/1993
From: Murley T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20046A648 List:
References
2.206, NUDOCS 9307290170
Download: ML20046A652 (2)


Text

_. -

~

-~~

~

~_

T UNITED STATES NUCLEAR REGULATORY COMMISSION ALL PRESSURIZED WATER REACTORS P

RECEIPT OF PETITION FOR DIRECTOR'S-DECISION UNDER 10 CFR C 2.206 t

Notice is hereby given that by letter dated March 24, 1993, to-Ivan Selin, Chairman of the Nuclear Regulatory Commission (NRC),

from John Willis on behalf of' Greenpeace International.-

e (petitioner), the NRC has' received a petition under 10 CFR 2.2'06-regarding all pressurized water reactors (PWRs) now operating.-in-the United States.

The petitioner requests immediate, full' inspection of all -vessel head penetrations (VHPs) in. U.S. : PWRs for

'E cracking and publication.of the'results by the NRC.:The. letter-is being treated as a. petition for enforcement action,. pursuant-t'o 10 CFR 2.206, because the. petitioner also requests'thatithe'NRC

{

shut down affected reactors, whether the cracking is' longitudinal' or circumferential.

The petitioner. also requests that-the NRC staff re-license reactors which must be. closed -' due.. to cracking-t based on the assertion that the repair or mitigation' program for-such cracks may negatively affect the configuration and:

ef fectiveness of ' safety systems. The petitioner seeks relief based' on allegations that (1) some VHPs in PWRs-in France, Belgium,-

l 1

' Switzerland, and Sweden are cracking; (2) testing. in France revealed incipient circumferential. cracking of -some VHPs, which' l

could lead to a through-wall break in.the primary pressure boundary Without fulfillment of the leak-before-break' criterion;'and'(3) 9307290170 930607 PDR ORG NRRB PDR

+

i

4 l

~I this phenomenon could cause the ejection of the control rod drive mes.hanism,- with resulting loss control of the reactor.

The petitioner describes the bases for its request in more detail"~in.

" Vessel Head Penetration Cracking in Nuclear Reactors," Greenpeace International and Greenpeace Sweden, March, 1993.-

N_t As more fully described in a letter dated 7,

1993, acknowledging receipt of the petition, the petitioner's request for immediate relief has been denied.

The petitioner's request is being treated' pursuant to 10 CFR 2.206 of the Commission's regulations.

The NRC will take appropriate action on this request within a reasonable time.

A copy of the petition is available for inspection and copying in the Commission's Public Document Room, 2120 L Street, N.W.,,

Washington, D.C.

20555.

4 FOR THE NUCLEAR REGULATORY COMMISSION r

Thomas E. Murley, ctor Office of Nuclear Reactor Regulation Dated at Rockville, aryland-this 7th day of.

1993.

'e

-