Forwards Rev 0 to Emergency Action Levels Technical Basis Document, Reflecting Scheme Addressed in Reg Guide 1.101, Rev 3
ML20046A474
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/20/1993
From: Denton R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046A475 List:
References
RTR-REGGD-01.101, RTR-REGGD-1.101 NUDOCS 9307280162
Download: ML20046A474 (8)


Text

y

=

BALTIMORE F

GASAND i

ELECTRIC

1650 CALVERT CLIFFS PARKWAY LUSBY, MARYLAND 20657-4702 '

-1 F-ROBERT f. DENTON ll L

vict PatsloEM

!T NUCLE AR ENERGY (4io) aso-dess

. i July 20,1993 '

l l

U. S. Nuclear Regulatory Commission Washington,DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 r

Emercency Act:an Level Scheme

REFERENCE:

-(a)

Letter from R. E. Denton (BG&E) to Document Control Desk j

(NRC), dated January 29,1993, Emergency Action Level Scheme i

Reference (a) notified the Commission of our intentions to revise the Emergency Action Ixvels (EALs) for the Calvert Cliffs Nuclear Power Plant to rcliect the scheme addressed in Regulatory l

Guide 1.101, Revision 3 (i.e., NUMARC/NESP-007, Methodology for Development of Emergency Action Levels). In keeping with Reference (a) we are submitting the attacl.ed revised Emergency.

7 Action Levels for your review.' The Calvert Cliffs Nuclear Power Plant Emergency Action Levels-Technical Basis document demonstrates that the proposed scheme satisfies Regulatory Guide 1.101'

. Revision 3 criteria. Implementing this scheme will not decrease the effectiveness of the Emergency l

Response Plan. As indicated by the enclosed endorsements, this revised scheme has been reviewed l

with State and local agencies.

We plan to implement the Regulatory Guide 1.101 EAL scheme on January 1, 1994.

Implemension is contingent upon completion of the NRC review and staff training. To facilitate your review, we propose that members of our EAL development team meet with your staff to go over the basis document. This will also allow opportunity to demonstrate how plant Abnormal and.

Emergency Operating Procedures are integrated with the EALs.

l t

i 280000 i

i O'

9307280162 930720 Uli h

I i

i PDR ADOCK 05000317 M

F PDR

[d

{

Document Control Desk July 20,1993 Page 2 1

i Our point of contact for this meeting and for any other questions regarding this matter is l

Mr. Thomas E. Forgette, Supervisor-Emergency Planning, at (410) 260-4996.

I s

w RED /TEF/WDM/bjd Attachments: (1)

Calvert Cliffs Nuclear Power Plant Emergency Action Levels Technical Basis Document (2)

Endorsement Memorandum from Maryland Emergency Management Agency, dated July 8,1993 (3)

Endorsement Letter from St. Mary's County Emergency Management Agency, dated July 9.1993 (4)

Endorsement Letter from Dorchester County Emergency Management and Civil Defense Agency, dated June 29,1993 (5)

Endorsement Letter from Maryland Department of Natural Resources, dated July 12,1993 (6)

Endorsement Letter from Calvert County Departmert el Public Safety and Services Emergency Management Division, dated July 9,1993 (7)

Endorsement Memorandum from State of Maryland Department of the Environment, dated July 8,1993 cc:

(Without Attachments)

D. A. Brune, Esqu:re J. E. Silberg, Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wilson, NRC R. I. McIxan, DNR J. H. Walter, PSC

AL. 15 ' 93 14:29 FPOf1 TEllA EDC TO 2606883 FAGE.001.

STATE OF MARYLAND MILITARY DEPARTMENT

&. __.i

.:AV ES F 8 C E C wo:8 M'<Ua.

WILLIAM DONALD SCHAEFE4 M ACl=~ AV* O*V8 A.

acnag mNCR g

  • AVO YOV:LLION MgLV'N A. STEINBg:e CPE;'OP s y s3uar-G0ven%n MARYLAND EMERGENCY MANAGEMENT AGENCY 2 SUCSEOCK LANE. EAST PiKESVtLLE. MARYLAND 21206 M10) 4P6-4422 * (FAX) 486 '8C TTY for Des' AS4 4083 July 8, 1993 MEMORANDUM TO:

Tom Forgette Supervisor E crgency Planning l

FROM:

David McMillion, Director h

SUBJECT:

CALVERT CLIFFS EMERGENCY ACTION LEVELS I

This letter confirms our approval of the CCNPP Emergency Action Level (EAL) scheme to date.

Incorporation of the NUMARC EAL Methodology will provide continued assurance for protection of the public health and safety.

We appreciate the opportunity to work with you on this project.

~

m

fy$

kg

/

- 41

=;

s*

ST. MARYS COUNTY EMERGENCY MANAGEMENT AGENCY P.O. BOX 271 LEONARDTOWN. MARYLAND 20Gr4 PAUL E. WIBLE, Director Tel: (301) 475-8016 GLORIA L. LeDONNE, Deputy Fax: (301) 475-3952 SIEMORANDUNf:

TO:

T.E. Forgette Calvert Cliffs Nuclear Power Plant

"'I FRO 31:

Paul E. Wible, Director DATE:

July 9,1993 RE:

Emergency Action Level This is to document that St. Mary's County concurs with the Emergency Action Levels and Protective Action recommendations for Calvert Cliffs Nuclear Power Plan as present by Baltimore Gas and Electric.

PW/bm

.7 U N 19.*S3 I0:19 F R 0f1 DOPCHESTEF EOE 10 FORGETTE

.g PAGE.001 4jo7228101g JUNE C. McKELVEt (FAX) 22 F1 1216 DINECTOM M. WAYNE ROBIN 50N ALTLftN ATT DIRECTOR l

DORCHESTER COUNTY EMERGENCY M ANAGEMENT AND CIVIL DEFENSE AGENCY 200 HioN StarrT. CourirNourt P. O. Dex 231 CA M D RIDG E. M A RYL A ND 21613 0231 June 29, 1993 To:

Thomas E. Forgette, Supervisor, Emergency Planning BG&E/CCNPP from:

June C. McKelvey, Directo.

Subject:

EAL's Subsequent to a review of the new Emergency Action Levels developed for the Calvert Cliffs Nuclear Power Plant, I recommend that these changes be adopted.

I 5

l r

i 1

i 1

k i

l 3

t t

4 C4 dW.

Jul'~16,1993 10: SHAM FPCM

'TO 92605853 P.02

~

VM

.i N

s Wilham Donald Schaefer Maryland Department of Natural Resources Terrey c. Bro n, M.o.

Governor Secretary Tidewa:er Administration Power Plant and Enviror. mental Review Dmilon Pc:ci M. Dunbar. Pli.D. P.E.

E"*'

Tawes State Office Building Annapolis, Maryland 21401 July 12, 1993 d

Mr. Thomas Forgette Supervisor, Erargency Planning Baltimore Gas and Electric Co.

Calvert Cliffs Nuclear Power Plant Lusby, MD 20657 SU3 JECT:

Emergency Action Levels For Calvert Cliffs

Dear Ten:

The Power Plant Research Program has reviewed the draft Erergency Action Level (EAL) Technical Basis Document and of f ers no sucstantive concents at tnis

.ime.

Our recent meeting witn Ed

.y Roache of your staff provided additional information pertinent to the d e cu r.e n t and assisted us in gaining a better understanding of i

the overall EAL upgrade plan and implementation schedule.

We approve of your plan and progress to date and continue to appreciate the opportunity to discuss this matter with BG&E staff and offer cur ccmments.

Sin e elv, Ri hard I.

McLean Manager, !!u el aa r Programs cc: Roland fletcher, MDE David McMillion, MEMA Telepnone.

(410) 974-2261 DNR TTY tor the Deaf: 301 9 % 265.1 m

i

- @QT c CALVERT COUNTY o

DEPARTMENT OF PUBLIC SAFETY AND SERVICES EMERGENCY MANAGEMENT DIVISION Courthouse Prince Frederick, Maryland 20678 Phone (301) 535-1600 Ext. 301 Department Director Board of Commissioners Roben L. Shon Patrick M. Buchler i

July 9 1993 Stary M. Krug N3'8" O'/

Hagner R. Mhter Vernon Horsmon Michad J. Moore Joyce Lyons Terhes Mr. Tom Forgette, Supervisor Emergency Planning Unit Calvert Cliffs liuclear Pcwer Plant Lusby, MD 20657 i

Dear Tom:

We have reviewed the Ccilve ct Cliffs liuclear Fewer Flant's Emergency Action Levels guide using the 1;UIIARC methcdology and concur with the draft document and procedures as to.date.

This method, once ap. proved and implemented, will provide local Emergency Managers with a better understanding of plant conditions in the event of an incident.

n We thank you for including us in this development process.

If we can be cf further assistance, please call our office.

Sincerely,

'Jernon D. Horsmon

'JLH 2 s2 cc:

Lavid McMillion, D2. rector Maryland Emergency Management Agency i

me w-y - ~

.p ~- w;m--

9,.;_me.,;

_y p p-_. m _.

v.e ms. p r. pn,- wn.,

a..+

, no 4-

-,o-,e,:-v

,p,.v.,+~,_-e, n.vons.en

-m-m mm mmwey ny.,m.

-~>-m r t.

-n ne-a=u-u

.;4-33 ;3 25

. ?-C. inO!CM'31E^b UE^

.,,.,-~.z.

i M I)EPARTMENTOFTHEENVIR STATE OF MARYLAhT

~

2500 Broening Highway Baltimore, Maryland 21224 (301) 631-William Donald Sct:afer Governor Robert Perciasepe Secretary I

i July 8,1993 Mr. Thomas Forgette Nuclear Safety & Planning Department Calvert Cliffs Nuclear Power Plant Lusby MD 20657

Dear Mr. Forgotte:

This letter confirms our review and approval of the Calvert Cliffs Emergency Action Level (EAL) updates to date. Incorporation of the NUMARC methodology has proved to be a beneficial addition toward protection of the public health and, safety. We will continue to i

monitor the EAL revisions through cornpletion, and appreciate the opportunity to assist you in this process.

sincerely, r< 1 /1 / b f'

Roland G. Fletcheir, Administrator Radiological Health Program RGF:dpn i

TDD FCIL TigE DEAF (30!) 638-3009 A