Forwards Vols 1 & 2 of Vogtle Electric Generating Plant, Unit 1 ISI Final Rept,Fourth Maint/Refueling Outage (Period 2/Interval 1), Containing Discussion Constituting Special Rept Per TS 4.4.5.5.b Re Insp of SG Tubes During Outage
ML20046A263
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 07/21/1993
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20046A264 List:
References
MSV-01465, MSV-1465, NUDOCS 9307270164
Download: ML20046A263 (2)


Text

r

-u

)

t-Georg a Power Compary s

'f 40 invemets Cenw ParLway Post O*tce Ba 1295 Gammignn Alabama 35201 ktphone 205 877 7122 t

n Georgia Power C. K. McCoy mv5:u!%"ntM G Csy k m July 21, 1993 MSV-01465

  1. 5709 Docket No. 50-424 U. S. Nuclear Regulatory Comuissicn ATTN:

Document Control Desk Washington. D. C.

20555 Gen +1emen:

V0GTLE ELECTRIC GENERATING PLANT INSERVICE INSPECTION

SUMMARY

REPORT Enclosed are Volume.s 1 and 2 of the Vogtle Electric Generating Plant. Unit 1 (VEGP-1) Inservice Inspection (ISi) Final Report which constitute the

" Owner's Report for Inservice Inspection (Form NIS-1)" required by Subsubarticle IWA-6230 of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI 1983 Edition with Addenda through Summer 1983.

Inservice inspection activities which were conducted at VEGP-1 during the Spring 1993 maintenance / refueling outage are discussed therein.

Also included therein are "daner's Reports for Repairs and Replacements (Form NIS-2)" for repairs and/or replacements documented at VEGP-1 from the end oi the previous maintenance / refueling outage thruugh the Spring 1993 maintenance / refueling outage.

Volumes 3 through 8 of the ISI Final Report contain information not typically submitted to the U. S.

Nuclear Regulatory Commission (USNRC) in the " Owner's Report for Inservice Inspection (Form NIS-1)", e.g.. personnel certifications, nondestructive examination procedures. etc., and are not included herein.

Volumes 3 through 8. however. are available for review upon request at the plant site.

With regard to the NIS-2 reports on repairs and/or re)lacements, only the completed NIS-2 forms are being submitted.

Any attac1ments e.g.. code data reports. etc., that are referenced in the completed NIS-2 forms will be made available for review upon request at the plant site.

Contained in the VEGP-1 " Owner's Report for Inservice Inspection (Form NIS-1)" is a discussion on the inspection of steam generator tubes performed during the Spring 1993 maintenance / refueling outage.

That discussion constitutes the Special Report required by VEGP Technical Specification 4.4.5.5.b to be submitted to the USNPC within 12 months

[(d

[

9307270164 930721 3

PDR ADOCK 05000424 h

G PDR

\\

g oAlM a

.o r

4 Georgia I ower U. S. Nuclear Regulatory Commission MSV-01465 Page Two following completion of the steam generator tube inspections.

Accordingly, there will not be a separat. submittal made to the USNRC on the ins)ection of the steam generator tubes performed during the subject outage.

3y copy of this letter. the appropriate USNRC Regional Administrator is being provided copies of the enclosed report volumes; thus com)liance with the requirements of VEGP Technical Specification 6.8.2 for su)mittal of Special reports to the appropriate Regional Administrator is met.

Five copies of Volumes 1 and 2 of tho ISI Final Report for the Spring 1993 maintenance / refueling outage are provided for your review.

Two copies of the subject volumes are being provided to the Regional Administrator for USNRC Region II.

Should there be any questions in this regard, please contact this office.

Sincerely.

C. K. McCoy CKM/JAE/jae

Enclosures:

Volumes 1 and 2 of VEGP-1 ISI Final Report. Fourth Maintenance,lefueling Outage (Period 2/ Interval 1) xc:

Georgia Power Comnany Mr. J. B. Beasley. Jr. (w/o encl.

Mr. S H. Chesnut (w/o encl.)

Mr. M. Sheibani (w/o encl.)

NORMS (w/ encl.)

U. S. Nuclear Reaulatorv Commission Mr. S. D. Ebneter. Regional Administrator (w/ encl.)

Mr. D. S. Hood. Licensing Project Manager. NRR (w/ encl.)

Mr. B. R. Bonser. Senior Resident Inspector. Vogtle (w/ encl.)

703775

Georgia Power Company Vogtle Electric Generating Plant Unit 1 Docket No. 50-424 inservice Inspection Final Report Fourth Maintenance / Refueling Outage Period 2/ Interval 1)

Volume 1 k

Rn Southern Nudear Operating Company ec swe -ac s,n