Forwards SALP Repts 50-245/92-99,50-336/92-99 & 50-423/92-99 for Period of 920216 - 930403
ML20046A261
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 07/20/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20046A262 List:
References
NUDOCS 9307270162
Download: ML20046A261 (6)


See also: IR 05000245/1992099

Text

,-

. . . .

. . - .

.

-

.

.

-.

_ +

,

JLL 2 0 MB -

i

,

Docket Nos. 50-245

50-336

c

50-423

,

a

Mr. John F. Opeka

Executive Vice President - Nuclear

i

Northeast Nuclear Energy Company

P. O. Box 270

..'

Hartford, Connecticut 06141-0270

..

'

Dear Mr. Opeka:

SUBJECT:

INITIAL SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE'

!

(SALP) REPORT NOS. 50-245/92-99, 50-336/92-99 AND 50-423/92-99 '

9

'

.On May 18,1993, an NRC SALP Board assessed the performance of activities at the

Millstone Nuclear Power Station, for the period February 16,1992, through April 3,7 1993.'

The results are documented in the enclosed SALP Board Report. We plan to meet with you

l

and your staff at the Millstone site in the near future to discuss the findings ~of this.

evaluation.

7

During this SALP period, performance at Millstone Station improved marginally from that

achieved during the previous period. All three units have been operated safely, with the most

noteworthy performance improvement in the Radiological Controls area which was rated a

3

SALP Category 1.

i

We found the self-assessment initiatives and task action' plans' reflected in the Northeast

,

Utilities Performance Enhancement Program (PEP) to be positive steps toward improving

performance. However, your progress in implementing PEP has not yet produced significant ~

j

overall performance improvement.

Continuing training program weaknesses were observed at Millstone, particularly in the area

.

{

of Licensed Operator Requalification Training (LORT) at Unit 1, As a result, the Unit 1

.

.,

LORT program was rated as unsatisfactory for the second consecutive year. This failure was.

1

-indicative of inadequate root cause analysis and ineffective corrective actions, as well-as, a

l

. noteworthy lack of corporate and site management attention to an identified performance

l

problem.

.;

!

9307270162 93072o

'~

<

,

PDR

ADOCK 05000245?

!

/yh

_ ' I I_

G

PDR;'

.

.

3

-

-

. . - .

-

,

M 2019%

Northeast Nuclear

2

Energy Company

In addition to the LORT program deficiencies at Unit 1, long-standing performance problems

remain in the areas of procedural adherence and corrective action effectiveness across the

station. Additional management attention to these areas is warranted. Consequently, the area

of Safety Assessment / Quality Verification was rated a SALP Category 3. An improving'

'

trend in this functional area recognizes the significant effort devoted to PEP initiatives during

this SALP period.

In April 1993, a team inspection of the Millstone Station LORT was conducted.' Although

the inspection was conducted outside this SALP period, the inspection findings were included

in this SALP since the inspection reviewed and assessed activities that occurred within the

period. While the team found substantial efforts at remediating the Unit I requalification'-

training deficiencies and a programmatic strength involving the use of the advanced training

classroom, program weaknesses adversely affecting all three units were identified. Of

particular note was the fact that policies and procedures for program elements common to all

three units were implemented differently or inconsistently among the units. The variances

among the units suggested further weaknesses in corporate and site senior management

oversight and direction to the program.

At the SALP management meeting you should be prepared to discuss our assessment, and

your plans to improve performance. The meeting is intended to be a candid dialogue wherein

any comments you have, regarding our report, are discussed. Additionally, you may provide

-

written comments within 20 days after the meeting. In accordance with NRC policy, this

meeting will be open for public observation.

We appreciate your cooperation.

Sincerely,

Oridnal Signed By:

Timmas T. l/intiti

Thomas T. Manin

Regional Administrator

Enclosure:

Initial Systematic Assessment of Licensee Performance (SALP) Report Nos.

,

'

50-245/92-99,50-336/92-99 and 50-423/92-99

,

a

..

.

-

,

i

4 201993

Northeast Nuclear

3

'

Energy Company

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations Services

E. DeBarba, Vice President, Nuclear Engineering Services

S. E. Scace, Nuclear Station Director

H. F. Haynes, Nuclear Unit Director

J. S. Keenan, Nuclear Unit Director

F. R. Dacimo, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

G. H. Bouchard, Director of Quality Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

The Chairman

Commissioner Rogers

Commissioner Remick

Commissioner de Planque

Institute of Nuclear Power Operations (INPO)

K. Abraham, PAO (33)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut SLO Designee

,

I

t

>

F

Nonheast Nuclear

4

Energy Company

bec w/ encl:

Region I Docket Room (with concurrences)

bec via Femail:

J. Taylor, EDO

V. McCree, OEDO

J. Lieberman, OE

L. Wharton, NRR

J. Stolz, PDI-4, NRR

D. Jaffe, SPM, NRR

,

G. Vissing, PM, NRR

1

V. Rooney, PM, NRR

J. Andersen, PM, NRR

Region I Staff (Refer to SALP Drive)

Region I Docket Room (with concurrences)

,

0@

Northeast Nuclear

5

Energy Company

.

k

RI:DRP

RI:DRP

RI:DRP

S

D

Blough

'N

6/4/93

6/'l/93

6/// /93

\\

/e

h

4

a'

8

5

a

3

i

P

f

RI:NRR )f

I:D

RI:DRSS

d

RI:DRP

r\\

fpod '

S 11

H

.es

Wi gins

a

.

7

p

61) /9 3

/

'93

d/J6/

N

6/}h/93

7

g

?[)'"

{

T hA

RI:RA

d

{Jygne

Martin

{g

O/g/93

d/A0/93

OFFICIAL RECORD COPY

G:\\ BRANCH 4\\SALP9299.RV4

JUL . 2 0 1993

Northeast Nuclear

5

Energy Company

.

.

RI:DRP

RI:DRP

RI:DRP

Swetland

Doerflein

Blough

6/ /93

6/ /93

6/ /93

RI:NRR

RI:DRS

RI:DRP

Stolz

Hodges

S

,an

Wiggins

&

6//g/W

6/ /93

6/ /93

6/ /93

RI:DRA

RI:RA

-

Kane

Martin

6/ /93

6/ /93

OFFICIAL RECORD COPY

G:\\ BRANCH 4\\SALP9299.RV4

.