ML20046A078
| ML20046A078 | |
| Person / Time | |
|---|---|
| Issue date: | 06/10/1993 |
| From: | Jordan E Committee To Review Generic Requirements |
| To: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| References | |
| NUDOCS 9307260147 | |
| Download: ML20046A078 (2) | |
Text
'
JUN 101993 MEMORANDUM FOR:
James M. Taylor Executive Director for Operations FROM:
Edward L. Jordan, Chairman Committee to Review Generic Requirements
SUBJECT:
MINUTES OF CRGR MEETING NUMBER 242 The Committee to Review Generic Requirements (CRGR) met on Friday, May 27, 1992 from 8:00 a.m. to 10:30 p.m.
A list of attendees at the meeting is attached (Enclosure 1). The following items were discussed at the meeting:
1.
The CRGR reviewed a proposed urgent NRC' Bulletin, " Resolution of Issues Relating to Reactor Vessel Water Level Instr" mentation in BWRs".
The proposed bulletin was submitted as a Category I item (i.e., for expedited review by CRGR), in accordance with section III.D of the CRGR Charter. The Committee recommended in favor of issuing the proposed generic letter, subject to a number of clarifying changes discussed at the meeting (to be coordinated with the CRGR staff). This matter.O discussed in Enclosure 2.
In accordance with the ED0's July 18, 1983 directive concerning " Feedback and Closure of CRGR Review", a written response is required from the cognizant office to report agreement or disagreement with the CRGR recommendations in these minute.s. The response is to be forwarded to the CRGR Chairman and if there is disagreement with the CRGR recommendations, to the ED0 for-decision making.
Questions concerning these meeting minutes should be referred to James H.
I Conran (492-9855).
Original Signed by:
E. L Jordan Edward L. Jordan, Chairman Committee to Review Generic Requirements 1
Enclosures:
As stated cc: next page Distribution:
next page 94w7 CRGR:AE00 D'
SOD
- AEOD g g',/0 an:slm DF ss LJordan.
6/k/93 6/ /93 P
DOCUMENT NAME:
Minutes.242
) g'
$0$TI snB " "D8P NHC Hl.E CDJIER CDPV 9307260147 930610
> ?)
o o
lf '
James M. Taylor 1
cc:
Commission (5)
SECY J. Lieberman P. Norry D. Williams W. Parler J. Larkins Regional Administrators A. Thadani CRGR Members Dis tribution: -
' Central: File' w/o: encl..'
PDR (NRC/CRGR) w/o encl.
CRGR S/F
.CRGR C/F S. Treby M. Taylor
-J. Sniezek D. Allison D. Ross J. Conran R. Emrit B. Grimes J. Zwolinski R. Barrett J. Kudrick R. Woodruff
'l i
.J I
i_
l
.