ML20045J256

From kanterella
Jump to navigation Jump to search
Forwards Rev 38 to QA Policy for Calvert Cliffs Nuclear Power Plant. QA Policy,App 1B of Calvert Cliffs Ufsar,Which Starting 1993,util Submitting UFSAR Rev Six Months After Refueling Outage,Per 10CFR50.71(e)(4)
ML20045J256
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/16/1993
From: Denton R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045J257 List:
References
NUDOCS 9307230250
Download: ML20045J256 (1)


Text

.

BALTIMORE GAS AND ELECTRIC i

1650 CALVERT CUFFS PARKWAY. LUSBY, MARYLAND 20657-4702 RonERT E. DENTON Vict PRESIDENT NucLtan ENEROY (410) 260-dash July 16,1993 4

U. S. Nuclear Regulatory Commission Washington, DC 20555 A'ITENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Ouality Assurance Policy - Revision 38 1

(

Enclosed is Revision 38 to our Quality Assurance Policy submitted in accordance with 10 CFR 50.54(a)(3). Formerly, the Quality Assurance Policy revision was submitted concurrent with the Updated Final Safety Analysis Report (UFSAR) revision. However, starting this year, we are submitting the UFSAR revision six months after our refueling outage in accordance with 10 CFR 50.71(c)(4); thus, the two submittals no longer coincide, l

Should you have any questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, lO K

\\

k RED /EMT/cmt/dlm Enclosure cc:

D. A. Brune, Esquire J. E. Silberg. Esquire R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC P. R. Wils<m, NRC R. I. McLean, DNR J. H. Walter, PSC 9307230250 930716 PDR ADOCK 05000317 9

P PDR j) and parwn

@y

-_