Forwards Initial SALP Repts 50-338/93-15 & 50-339/93-15 on 911103-930403.Assessment Indicates That Plant Performance Has Continued to Improve
ML20045J124
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/18/1993
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML20045J125 List:
References
NUDOCS 9307230074
Download: ML20045J124 (3)


See also: IR 05000338/1993015

Text

n - __

. -_

.w

~.

jg

Jdt4 1 8 1993

~

Docket Nos. 50-338, 50-339

t

License Nos. NPF-4, NPF-7

?

Virginia Electric and Power Company

ATTN: Mr. W. L. Stewart

Senior Vice President - Nuclear

E000 Dominion Boulevard

'

Glen Allen, VA 23060

I

. Gentlemen:

.

SUBJECT: NORTH ANNA SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE

(NRC INSPECTION REPORT NOS. 50-338/93-15 AND 50-339/93-15)

b

The NRC Systematic Assessment of Licensee Performance (SALP) has been

completed for your North' Anna facility. The facility was evaluated for the

1'

period November 3, 1991, through April 3, 1993. The. results of the evaluation

' are documented-in the enclosed Initial SALP Report. This report will be

l,

di.; cussed at a public meeting to be held at the North Anna facility on July 1,

[-

1993, at 2:30 p.m.

1'

l

.The performance of your North Anna facility was evaluated in the functional

areas of Plant Operations, Radiological Controls, Maintenance / Surveillance,

,

'

Emergency Preparedness, Security, Engineering / Technical Support and Safety

' Assessment / Quality Verification.

~

The assessment indicates that North Anna's performance has contir.ued to

improve. The assessment noted superior performance in the functional areas of

p;

Plant Operations, Radiological Controls, Maintenance / Surveillance, Emergency

)

Preparedness,' Security, and Safety Assessment / Quality Verification. Good and

i

'

improving performance was noted in the area of Engineering / Technical Support.

1

This level of- performance can only.be achieved by cooperation between the

various' groups of plant and corporate * personnel, and active management

involvement at all levels in support of plant operation. This level of

.

I

performance indicates that management has established and achieved high

R

'

standards in all areas.

L

The' performance of corporate and plant personnel in accomplishing the Unit 1

D

outage which involved replacing the' steam ge'erators and repairing the service

water piping was especially noteworthy.

'

- Any' comments you have concerning our evaluation of the performance of your-

North Anna' facility should be submitted to this office within 30 days

following the date of our meeting. Your comaents will be considered in the

development of the Final SALP Report and will be issued, along with a summary

of our meeting, as an appendix to the Final SALP Report. -

l

r

1

.

-9307230074 9306181

-PDR. ADOCK 05000338

G

PDR

ZE!/O

e

a

- = _

- _-__

__

.

5

t

'

JUti I 81993

,.

Virginia Electric & Power Company

2

.

Should you have any questions concerning this letter, we will be pleased to

'

discuss them with you.

.

Sincerely,

-

i

Stewart D.

neter

Regional Administrator

Enclosure:

Initial SALP Report - North Anna

cc w/ enc 1:

M. L. Bowling, Jr., Manager

Nuclear Licensing

Virginia Electric & Power Company

5000 Dominion Boulevard

Glen Allen, VA 23060

G. E. Kane, Station Manager

North Anna Power Station

P. O. Box 402

Mineral, VA 23117

,

Executive Vice President

Old Dominion Electric Cooperative

4201 Dominion Boulevard

Glen Allen, VA 23060

Dr. W. 1. Lough

Virginia Corporation Commission

Division of Energy Regulation

P. O. Enx 1197

Richmond, VA 23209

William C. Porter, Jr.

County Administrator

Louisa County

P. O. Box 160

Louisa, VA 23093

Michael W. Maupin, Esq.

Hunton and Williams

Riverfront Plaza, East Tower

951 E. Byrd Street

-

Richmond, VA 23219

cc w/ encl cont'd:

(See page 3)

)

J

e

' ~ .

-

.

Virginia Electric & Power Company

3

cc w/ enc 1 cont'd:

.l

Attorney General

Supreme Court Building

101 North 8th Street

Richmond, VA 23219

Robert B. Strobe, M.D., M.P.H.

State Health Commissioner

,

Office of the Commissioner

Virginia Department of Health

P. O. Box 2448

Richmond, VA 23218

l

INPO

.

bec w/ encl:

The Chairman

K. C. Rogers, Commissioner

J. R. Curtiss, Commissioner

F. J. Remick, Commissioner

E. G. de Planque, Commissioner

J. M. Taylor, EDO

1

H. L. Thompson, Jr., ED0

L. R. Plisco, Regional

]

Coordinator, EDO

T. E. Murley, NRR

S. Varga, NRR

i

d

H. Berkow, NRR

L. Engle, NRR

F. Allenspach, SALP Coordinator, NRR

Regional Administrators, RI, RIII

RIV, and RV

K. Clark, RII, PA0

l

M. Sinkule, DRP, RII

G. Belisle, DRP, RII

D. Taylor, DRP, RII

S. Vias, Chief, TSS (2 copies)

~

NRC Resident Inspector

,

DRS and DRSS Branch Chiefs,

'

and Section Chiefs

Document Control Desk

j

1

~

RII:DRP

RII:D P

RII:DRP

R

R I:DRS

RI

RII

balIett

l

ABk sle

M

er

MSi

ue

e choff

JJau n

06/p /93

J6/1/93 06/d/93

If/93

06/

93 06/0/93

6/h93

e

0

(

l

HQ:N

A

HQ:11RR

V.W ('

V

!

LEngle'

HBe oW

06/p/93

06/JJ/93

} ln hu+ cfi$

1

I

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - . _ _ _ _ _ - . - _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _

.j