ML20045J124
| ML20045J124 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 06/18/1993 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML20045J125 | List: |
| References | |
| NUDOCS 9307230074 | |
| Download: ML20045J124 (3) | |
See also: IR 05000338/1993015
Text
n - __
. -_
.w
~.
jg
Jdt4 1 8 1993
~
- Docket Nos. 50-338, 50-339
t
?
Virginia Electric and Power Company
ATTN: Mr. W. L. Stewart
Senior Vice President - Nuclear
E000 Dominion Boulevard
'
Glen Allen, VA 23060
I
. Gentlemen:
.
SUBJECT: NORTH ANNA SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
(NRC INSPECTION REPORT NOS. 50-338/93-15 AND 50-339/93-15)
b
The NRC Systematic Assessment of Licensee Performance (SALP) has been
completed for your North' Anna facility. The facility was evaluated for the
1'
period November 3, 1991, through April 3, 1993. The. results of the evaluation
' are documented-in the enclosed Initial SALP Report. This report will be
l,
di.; cussed at a public meeting to be held at the North Anna facility on July 1,
[-
1993, at 2:30 p.m.
1'
l
.The performance of your North Anna facility was evaluated in the functional
areas of Plant Operations, Radiological Controls, Maintenance / Surveillance,
,
'
Emergency Preparedness, Security, Engineering / Technical Support and Safety
' Assessment / Quality Verification.
~
The assessment indicates that North Anna's performance has contir.ued to
improve. The assessment noted superior performance in the functional areas of
p;
Plant Operations, Radiological Controls, Maintenance / Surveillance, Emergency
)
Preparedness,' Security, and Safety Assessment / Quality Verification. Good and
i
'
improving performance was noted in the area of Engineering / Technical Support.
1
This level of- performance can only.be achieved by cooperation between the
various' groups of plant and corporate * personnel, and active management
involvement at all levels in support of plant operation. This level of
.
I
performance indicates that management has established and achieved high
R
'
standards in all areas.
L
The' performance of corporate and plant personnel in accomplishing the Unit 1
D
outage which involved replacing the' steam ge'erators and repairing the service
water piping was especially noteworthy.
'
- Any' comments you have concerning our evaluation of the performance of your-
North Anna' facility should be submitted to this office within 30 days
following the date of our meeting. Your comaents will be considered in the
development of the Final SALP Report and will be issued, along with a summary
of our meeting, as an appendix to the Final SALP Report. -
l
r
1
.
-9307230074 9306181
-PDR. ADOCK 05000338
G
ZE!/O
e
a
- = _
- _-__
__
.
5
t
'
JUti I 81993
,.
Virginia Electric & Power Company
2
.
Should you have any questions concerning this letter, we will be pleased to
'
discuss them with you.
.
Sincerely,
-
i
Stewart D.
neter
Regional Administrator
Enclosure:
Initial SALP Report - North Anna
cc w/ enc 1:
M. L. Bowling, Jr., Manager
Nuclear Licensing
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA 23060
G. E. Kane, Station Manager
North Anna Power Station
P. O. Box 402
Mineral, VA 23117
,
Executive Vice President
Old Dominion Electric Cooperative
4201 Dominion Boulevard
Glen Allen, VA 23060
Dr. W. 1. Lough
Virginia Corporation Commission
Division of Energy Regulation
P. O. Enx 1197
Richmond, VA 23209
William C. Porter, Jr.
County Administrator
Louisa County
P. O. Box 160
Louisa, VA 23093
Michael W. Maupin, Esq.
Hunton and Williams
Riverfront Plaza, East Tower
951 E. Byrd Street
-
Richmond, VA 23219
cc w/ encl cont'd:
(See page 3)
)
J
e
' ~ .
-
.
Virginia Electric & Power Company
3
cc w/ enc 1 cont'd:
.l
Attorney General
Supreme Court Building
101 North 8th Street
Richmond, VA 23219
Robert B. Strobe, M.D., M.P.H.
State Health Commissioner
,
Office of the Commissioner
P. O. Box 2448
Richmond, VA 23218
l
.
bec w/ encl:
The Chairman
K. C. Rogers, Commissioner
J. R. Curtiss, Commissioner
F. J. Remick, Commissioner
E. G. de Planque, Commissioner
J. M. Taylor, EDO
1
H. L. Thompson, Jr., ED0
L. R. Plisco, Regional
]
Coordinator, EDO
T. E. Murley, NRR
S. Varga, NRR
i
d
H. Berkow, NRR
L. Engle, NRR
F. Allenspach, SALP Coordinator, NRR
Regional Administrators, RI, RIII
RIV, and RV
K. Clark, RII, PA0
l
M. Sinkule, DRP, RII
G. Belisle, DRP, RII
D. Taylor, DRP, RII
S. Vias, Chief, TSS (2 copies)
~
NRC Resident Inspector
,
DRS and DRSS Branch Chiefs,
'
and Section Chiefs
Document Control Desk
j
1
~
RII:DRP
RII:D P
RII:DRP
R
R I:DRS
RI
RII
balIett
l
ABk sle
M
er
MSi
ue
e choff
JJau n
06/p /93
J6/1/93 06/d/93
If/93
06/
93 06/0/93
6/h93
e
0
(
l
HQ:N
A
HQ:11RR
V.W ('
- V
!
LEngle'
HBe oW
06/p/93
06/JJ/93
} ln hu+ cfi$
1
I
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - . _ _ _ _ _ - . - _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _
.j