JUL 13 1993
i
i
Docket No.
50-309
Mr. Charles D. Frizzle
t' resident
Maine Yankee Atomic Power Company
83 Edison Drive
Augusta, Maine 04336
,
Dear Mr. Frizzle:
Subject:
Inspection No. 50-309/93-11
l
This letter refers to the safety inspection conducted by Mr. J. Kottan and Ms. N. McNamara
of this office on June 14-18,1993, of activities authorized by NRC License No. DPR-36 at .
the Maine Yankee Atomic Power Station, and to the discussions of our findings held by Mr.
Kottan and Ms. NcNamara with Mr. M. Veilleux and other members of your staff at the
conclusion of the inspection.
,
Areas examined during this inspection are important to public health and safety, and are
described in the NRC Region I Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures and
,
representative records, interviews with personnel, and observations by the inspectors.
In addition, our Mobile Laboratory was brought to your site and used by the inspectors to
make certain independent measurements. The basic purpose of these independent
'
measurements is to verify your capability for analyzing radioactive effluents, and to achieve -
and maintain comparable methods of analyses between your facility and the NRC. The data
from these measurements'are included in this report with the exception of the wet chemistry
results, which will be documented in a subsequent inspection report.
,
9307230057 930713
ADDCK 05000309-
O
l{
1
n
,e
Om
I
\\
OFFICIAL RECORD COPY
gt.
'pg
'
p
I
g I-
,
i
.
.
.
.
Maine Yankee Atomic Power Company
2
Within the scope of this inspection, you had in place effective programs for measuring
radioactivity in process and effluent samples and for measuring chemical parameters in plant
systems samples. No violations of regulatory requirements were observed and no response
to this letter is required.
Sincerely,
Original Signed By;
James H.Joyner
James H. Joyner, Chief
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety
and Safeguards
1
Enclosure:
NRC Region I Combined Inspection Report No. 50-309/93-11
cc w/ encl:
G. Leitch, Vice President, Operations
P. L. Anderson, Project Manager (Yankee Atomic Electric Company)
R. W. Blackmore, Plant Manager
J. A. Ritsher, Attorney (Ropes and Gray)
P. Dostic, State Nuclear Safety Inspector
Peter Brann, Assistant Attorney General
U. Vanags, Maine State Planning Office
C. Brinkman, Combustion Engineering, Inc.
First Selectmen of Wiscasset
Maine State Planning Officer
Public Document Room (PDR)
Imal Public Document Room (LPDR)
i
Nuclear Safety Information Center (NSIC)
K. Abraham, PAO (2)
,
NRC Resident Inspector
l
OFFICIAL RECORD COPY
_
_
.
4
h
.
Maine Yankee Atomic Power Company
3
bec w/ encl:
Region I Docket Room (with concurrences)
bec w/enci (VIA E4 FAIL):
V. McCree, OEDO
E. Trottier, LPM, NRR
W. Butler, NRR
,
L
-3
l
)
OFFICIAL RECORD COPY
<
, .
.
.
Maine Yankee Atomic Power Company
4
jgt . y 3 )g
-1
3
9
>
RI:DRSS
RI:DRS
I:DRSS -
Y
(
YN,s-
Kottan/smh/slj
g,L cNamara
J
ier
07A1/93
07/ /93
07// V93
07F/93
OFFICIAL RECORD COPY
.