ML20045J110

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-309/93-11 on 930614-18.No Violations Noted
ML20045J110
Person / Time
Site: Maine Yankee
Issue date: 07/13/1993
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Frizzle C
Maine Yankee
Shared Package
ML20045J111 List:
References
NUDOCS 9307230057
Download: ML20045J110 (4)


See also: IR 05000309/1993011

Text

. _ .

7_,( Q

..

.

.

.

JUL 13 1993

i

i

Docket No.

50-309

Mr. Charles D. Frizzle

t' resident

Maine Yankee Atomic Power Company

83 Edison Drive

Augusta, Maine 04336

,

Dear Mr. Frizzle:

Subject:

Inspection No. 50-309/93-11

l

This letter refers to the safety inspection conducted by Mr. J. Kottan and Ms. N. McNamara

of this office on June 14-18,1993, of activities authorized by NRC License No. DPR-36 at .

the Maine Yankee Atomic Power Station, and to the discussions of our findings held by Mr.

Kottan and Ms. NcNamara with Mr. M. Veilleux and other members of your staff at the

conclusion of the inspection.

,

Areas examined during this inspection are important to public health and safety, and are

described in the NRC Region I Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures and

,

representative records, interviews with personnel, and observations by the inspectors.

In addition, our Mobile Laboratory was brought to your site and used by the inspectors to

make certain independent measurements. The basic purpose of these independent

'

measurements is to verify your capability for analyzing radioactive effluents, and to achieve -

and maintain comparable methods of analyses between your facility and the NRC. The data

from these measurements'are included in this report with the exception of the wet chemistry

results, which will be documented in a subsequent inspection report.

,

9307230057 930713

PDR

ADDCK 05000309-

O

PDR

l{

1

n

,e

Om

I

\\

OFFICIAL RECORD COPY

gt.

'pg

'

p

I

g I-

,

i

.

.

.

.

Maine Yankee Atomic Power Company

2

Within the scope of this inspection, you had in place effective programs for measuring

radioactivity in process and effluent samples and for measuring chemical parameters in plant

systems samples. No violations of regulatory requirements were observed and no response

to this letter is required.

Sincerely,

Original Signed By;

James H.Joyner

James H. Joyner, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety

and Safeguards

1

Enclosure:

NRC Region I Combined Inspection Report No. 50-309/93-11

cc w/ encl:

G. Leitch, Vice President, Operations

P. L. Anderson, Project Manager (Yankee Atomic Electric Company)

R. W. Blackmore, Plant Manager

J. A. Ritsher, Attorney (Ropes and Gray)

P. Dostic, State Nuclear Safety Inspector

Peter Brann, Assistant Attorney General

U. Vanags, Maine State Planning Office

C. Brinkman, Combustion Engineering, Inc.

First Selectmen of Wiscasset

Maine State Planning Officer

Public Document Room (PDR)

Imal Public Document Room (LPDR)

i

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2)

,

NRC Resident Inspector

State of Maine, SLO Designee

l

OFFICIAL RECORD COPY

_

_

.

4

h

.

Maine Yankee Atomic Power Company

3

bec w/ encl:

Region I Docket Room (with concurrences)

bec w/enci (VIA E4 FAIL):

V. McCree, OEDO

E. Trottier, LPM, NRR

W. Butler, NRR

,

L

-3

l

)

OFFICIAL RECORD COPY

<

, .

.

.

Maine Yankee Atomic Power Company

4

jgt . y 3 )g

-1

3

9

>

RI:DRSS

RSS

RI:DRS

I:DRSS -

Y

(

YN,s-

Kottan/smh/slj

g,L cNamara

Bore

J

ier

07A1/93

07/ /93

07// V93

07F/93

OFFICIAL RECORD COPY

.