Responds to 920728 Final Replies to Notice of Violation & Notice of Nonconformance Issued on 900711 by Nrc.Insp Rept 99900031/90-01 Conducted on 900205-08 Precipitated Notices
ML20045H687
Person / Time
Issue date: 07/08/1993
From: Norrholm L
Office of Nuclear Reactor Regulation
To: Thomas W
SULZER BINGHAM PUMPS, INC.
References
REF-QA-99900031 EA-90-122, NUDOCS 9307210124
Download: ML20045H687 (3)


Text

..

[p RECy

) '

8 ' 3.,, / g NUCLEAR REGULATORY COMMISSION

'o UNITED STATES

~

g "y

e W ASHINGTON, D. C. 20555 a

s, " "

  • jul. 0 8 iM Docket No. 99900031 EA-90-122 Mr. Wayne D. Thomas Director, Corporate Quality Sulzer Bingham Pumps, Inc.

P.O.

Box 10247 Portland, Oregon 97210

Dear Mr. Thomas:

SUBJECT:

EVALUATIONS AND CONCLUSIONS REGARDING FINAL REPLIES TO THE NOTICE OF VIOLATION AND THE NOTICE OF NONCONFORMANCE (INSPECTION REPORT 99900031/90-01)

I am responding to your July 28, 1992, final replies to the Notice of Violation and Notice of Nonconformance that were issued on July 11, 1990, by the U.S. Nuclear Regulatory Commission (NRC).

The NRC inspection conducted on February 5-8, 1990, of Sulzer Bingham Pumps, Inc.'s (SBPI's) Portland Pump Division facility in Portland, Oregon precipitated the notices.

The Notice of Violation described three violations where SBPI failed to fully comply with NRC's requirements in Part 21 of Title 10 of the Code of Federal Reculations (10 CFR Part 21).

Of these violations, the most significant was SBPI's failure to perform the required evaluations of potentially reportable deviations or to inform purchasers so they could cause an evaluation to be performed pursuant to the provisior.s of 10 CFR Part 21.

The Notice of Nonconformance described a number of SBPI's activities that failed to comply with NRC's requirements in Appendix B to 10 CFR Part 50.

For example, the inspection identified that, contrary to SBPI procedures, SBPI's engineering activities failed in numerous instances to adequately control the design bases for basic components including the selection and i

review for suitability of application of materials, parts, and

{

processes that are essential to the components' ability to j

perform their safety-related function.

i Your final replies to the notices of violation and i

nonconformance, and the corrective actions taken by SBPI appear j

to be adequate.

No further response is required by SBPI.

We i

will review the implementation of SBPI's corrective actions taken 9307210124 930708 PDR GA999 EMVSULZB fd j,g li 99900031 PDR Ui j

1 Mr. Wayne D.

Thomas te prevent recurrence, as described in your final replies to t.ke notices of violation and nonconformance, during a future inspection to ensure that full compliance has been achieved and will be maintained.

In accordance with 10 CFR 2.790(a), the SBPI final replies to the notices of violation and nonconformance, associated documents, records, and a copy of this letter will be placed in the NRC's Public Document Room.

If you should have any questions concerning this matter, we will be pleased to discuss them with you.

S-

cerely,

)-

b s.

Leif N6rrholm, Chief Vendor Inspection Branch Division of Reactor Inspection and Licensee Performance Office of Nuclear Reactor Regulation h

1 Mr. Wayne D.

Thomas.

to prevent recurrence, as described in your final replies to the notices of violation and nonconformance, during a future inspection to ensure that full compliance has been achieved and will be maintained.

i In accordance with 10 CFR 2.790(a), the SBPI final replies to the notices of violation and nonconformance, associated documents, records, and a copy of this letter will be placed in the NRC's Public Document Room.

If you should have any questions concerning this matter, we will be pleased to discuss them with you.

Sincerely,

/

/

OriginalSigned by Leif J.

Norrholm, Chief Vendor Inspection Branch Division of Reactor Inspection and Licensee Performance Office of Nuclear Reactor Regulation DISTRIBUTION:

RIDS:IE:09 Central Files Public Doc Rm DRIL R/F VIB R/F OFC VIB/DRIL VIB/DRIL VIB/pRIL NME SMMatthews*

UPotapovs*

Lh folm DATE 7/07/93 7/08/93 7/ //93 COPY Yes Yes Yeb - No