ML20045H534

From kanterella
Jump to navigation Jump to search

Forwards Amend 44 to License DPR-73 & Safety Evaluation. Amend Modifies App a TS by Substituting Numerical Criteria to Limit Processed Water Disposal Sys Operations & Effluents in Lieu of Current TS
ML20045H534
Person / Time
Site: Crane 
Issue date: 07/12/1993
From: Thonus L
Office of Nuclear Reactor Regulation
To: Long R
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20045H535 List:
References
TAC-M81878, NUDOCS 9307200342
Download: ML20045H534 (3)


Text

~

Docket No. 50-320 Dr. Robert L. Long

.Vice President and Director

~ Corporate Services and TMI-2 Divisions GPU Nuclear Corporation Post Office Box 480 Middletown, Pennsylvania 17057-0191

Dear Dr. Long:

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT,NO. 2 - ISSUANCE OF AMENDMENT NO. 44 TO FACILITY OPERATING LICENSE N0. DPR-73 (TAC NO. M81878)

The Commission has issued the enclosed Amendment No. 44 to Facility Operating License No. DPR-73 for the Three Mile Island Nuclear Station, Unit 2, in response to your letter dated August 1,1991 (Technical Specification Change Request No. 68).

Your letter dated August 1,1991, also requested a change in Table 4.3-3 of the Recovery Operations. Plan. The staff has determined that this change is no longer applicable since Table 4.3-3 was transferred t'o ~the Offsite Dose Calculation Manual (0DCM) by TMI-2 Recovery Operations Plan Change approval 44. We have verified that the surveillance requirement in your August 1, 1991 amendment request has been incorporated in your ODCM, Part II, Table 2.3-1.

Amendment No. 44 modifies the Appendix A Technical Specifications by substituting numerical criteria to limit Processed. Water Disposal System (PWDS) operations and effluents in lieu of the current technical specification which requires NRC review and approval of operating procedures to limit PWDS operations and effluents.

A copy of the related Safety Evaluation supporting Amendment No. 44 is enclosed.

Notice of Issuance will be included in the Commission biweekly Federal Reaister notice.

Sincerely, ORIGINAL SIGNED BY Mike Masnik for Lee H. Thonus, Project Manager Non-Power Reactors and Decommissioning 9307200342 930712 Project Directorate PDR ADOCK 05000320 Division of Operating Reactor Support P

PDR Office of Nuclear Reactor Regulation-

Enclosures:

1.

Amendment No. 43 to DPR-73

-2.

Safety Evaluation cc w/ enclosures:

[{Q {l} QyQ Q;[P[

See next page DISTRIBUTION:[TMIAMEND.LHT] (Masnik-lt disk)

= Docket: EileE50-320.

.BGrimes EHylton GHill (2)

ACRS (10)

PDR RDudley OGC WJones OPA-ONDD R/F MMasnik DHagan CGrimes OC/LFDCB Region I RWood LBell LThonus BGrimes g.

  • See p evious concuryence j

o 04D0: -

ONDD:PMr' ONDD:PM ONDD:SC*-

OGC*

ONDD:D*-

14

(

on LThonus:lb MMasnik RDudley JHull SWeiss A

7/ /93 7/l/93 7/y/93 7/1/93 7/7/93 7/8/93 0FFICIAL RECORD COPY

[O $

W c:

w Q Cfr M

"e UNITED STATES 8

NUCLEAR REGULATORY COMMISSION e

n y,E WASHINGTON, D. C. 20555 g

July 12, 1993 Docket No. 50-320 Dr. Robert L. Long Vice President and Director Corporate Services and TMI-2 Divisions GPU Nuclear Corporation l

Post Office Box 480 Middletown, Pennsylvania 17057-0191

Dear Dr. Long:

I

SUBJECT:

THREE MILE ISLAND NUCLEAR STATION, UNIT NO. 2 - ISSUANCE OF AMENDMENT N0. 44 TO FAtlLITY OPERATING LICENSE NO. DPR-73 (TAC NO. M81878)

The Commission has issued the enclosed Amendment No. 44 to Facility Operating License No. DPR-73 for the Three Mile Island Nuclear Station, Unit 2, in response to your letter dated August 1,1991 (Technical Specification Change Request No. 68).

Your letter dated August 1,1991, also requested a change in i

Table 4.3-3 of the Recovery Operations Plan.

The staff has determined that i

this change is no longer applicable since Table 4.3-3 was transferred to the Offsite Dose Calculation Manual (OEM) by TMI-2 Recovery Operations Plan Change approval 44.

We have verified that the surveillance requirement in your August 1, 1991 amendment request has been incorporated in your ODCM, Part II, Table 2.3-1.

Amendment No. 44 modifies the Appendix A Technical Specifications by substituting numerical criteria to limit Processed Water Disposal System (PWDS) operations and effluents in lieu of the current technical specification which requires NRC review and approval of operating procedures to limit PWDS operations and effluents.

A copy of the related Safety Evaluation supporting Amendment No. 44 is enclosed.

Notice of Issuance will be included in the Commission biweekly Federal Reaister notice.

Sincerely, 6M dw 4

Lee H. Thonus, Project Manager Non-Power Reactors and Decommissioning Project Directorate Division of Operating Reactor Support Office of Nuclear Reactor Regulation

Enclosures:

1.

Amendment No. 44 to DPR-73 2.

Safety Evaluation cc w/ enclosures:

See next page

Dr. R. L. Long Three Mile Island Nuclear Station -

GPU Nuclear Corporation Unit No. 2 Docket No. 50-320 cc:

Regional Administrator, Region I Mr. Robert Rogan U.S. Nuclear Regulatory Commission GPU Nuclear Corporat.on 475 Allendale Road P. O. Box 480 King of Prussia, Pennsylvania 19406 Middletown, Pennsylvania 17057 Dr. Judith H. Johnsrud Mr. David J. McGoff Environmental Coalition on Nuclear Office of LWR Safety and Technology Power NE-23 433 Orlando Avenue U.S. Department of Energy State College, Pennsylvania 16801 Washington, D.C.

20545 Ernest L. Blake, Jr., Esq.

Mr. Wythe Keever Shaw, Pittman, Potts, and Trowbridge The Patriot 2300 N Street, N.W.

812 Market Street Washington, D.C.

20037 Harrisburg, Pennsylvania 17105 Secretary Mr. Robert B. Borsum U.S. Neclear Regulatory Commission B & W Nuclear Technologies Washington, D.C.

20555 Suite 525 1700 Rockville Pike Mr. Russell Schaeffer, Chairperson Rockville, Maryland 20852 Dauphin County Board of Commissioners Dauphin County Courthouse Mr. Marvin I. Lewis Front and Market Streets 7801 Roosevelt Blvd. #62 Harrisburg, Pennsylvania 17120 Philadelphia, Pennsylvania 19152 William Dornsife, Acting Director' Mr. Jane Lee

. Bureau of Radiation Protection 183 Valley Road Department of Environmental Resources Etters, Pennsylvania 17319 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. Walter W. Cohen, Consumer Advocate Mr. Ad Crable Department of Justice Lancaster New Era Strawberry Square,.14th Floor 8 West King Street Harrisburg, Pennsylvania 17127 Lancaster, Pennsylvania 17601 U.S. Environmental Prot. Agency Ms. Michele G. Evans Region III Office Senior Resident Inspector (TMI-1)

ATTN:

EIS Coordinator U.S. Nuclear Regulatory Commission 841 Chestnut Street P. O. Box 311 Philadelphia, Pennsylvania 19107 Middletown, Pennsylvania 17057 Mr. Charles N. Kelber Mr. Frank F. Hooper Atomic Safety and' Licensing 4155 Clark Road Board Panel Ann Arbor, Michigan 48104 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Peter B. Bloch, Chairman Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.

20555

.