ML20045H510

From kanterella
Jump to navigation Jump to search
Forwards Final Papers Recently Submitted to Commission Re Preapplication Reviews of Advanced Reactor & Candu 3 Designs.W/O Encl
ML20045H510
Person / Time
Issue date: 04/30/1993
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Erin Kennedy
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
PROJECT-680A NUDOCS 9307200307
Download: ML20045H510 (3)


Text

n s.

[$8 MC,'o, UNITED STATES J

V y'g ',g NUCLEAR REGULATORY COMMISSION

,4 l

W ASHINGT ON. D. C. 20555 g.w..../

April 30, 1993 Project No. 680 Mr. Ernie H. Kennedy, Manager Nuclear Systems Licensing ABB Combustion Erigineering Nuclear Power 1000 Prospect Hill Road P.O. Box 500 Windsor, Connecticut 06095-0500

Dear Mr. Kennedy:

SUBJECT:

COMMISSION PAPERS CONCERNING THE PREAPPLICATION REVIEWS OF THE ADVANCED REACTOR AND CANDU 3 DESIGNS Enclosed are the following final papers which have recently been submitted to the Commission on the subject preapplication reviews:

(1) SECY-93-092,

" Issues Pertaining to the Advanced Reactor (PRISM, MHTGR, and PIUS) and CANDU 3 Designs and Their Relationship to Current Regulatory Requirements,"

and (2) SECY-93-104, " Program Analysis and Recommendations Concerning the Nuclear Regulatory Commission (NRC) Reviews of the Advanced Reactor (PRISM, MHTGR, and PIUS) and CANDU 3 Designs."

The first paper provides the staff's final recommendations to the Commission on the 10 key policy issues related to the preapplication reviews.

You received a draft copy of this paper in our letter of December 16, 1993, which requested comments on the draft paper. The comments we received, including those from the Advisory Committee on Reactor Safeguards, are discussed in Enclosures 4 and 5 of the enclosed paper.

The second enclosed paper is the reassessment of the priorities and schedules for the preapplication reviews of these reactor designs in light of staff reductions directed by the Clinton administration.

This reassessment and the Commission's decision will affect the plans and schedules given in the paper, SECY-92-393, " Updated Plans and Schedules for the Preapplication Reviews of the Advanced Reactor (MHTGR, PRISM, and PIUS) and CANDU 3 Designs," which was also enclosed in our letter of December 16, 1992.

gg72 = 7 9a0430 7

~

MC FRE CENTEf! COPY Oem

% gwe

=,

e.

Mr. Ernie H. Kennedy April 30,1993 You will be informed of the' Commission's decisions as soon as they are publicly available.

If you have any questions, please contact Dino Scaletti at (301) 504-1104.

Sincerely, Jose A. Calvo for Dennis M. Crutchfield, Associate Director for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation

Enclosures:

1.

SECY-93-092 2.

SECY-93-104 cc w/ enclosures:

See next page Distribution:

Central File-PDR PDAR R/F DMCrutchfield RCPierson THCox EDThrom DCScaletti OGC 15/3/18 ACRS (10)

P 315 OPA PShea PIUS R/F SC:PDAR SE:PDAR:ADAR D:P j:ADAR ADAR:NRR /7/C LA:P DR PM:PDAR:ADAR THCox %:ADAR EDThrom V RCPi

[ son DMCrutchfield p art a

DScaletti:sa

(?}g/

{-@/93

'//*U/93 f/2f/93 i A /93 7/3s/93 L

'0FFICIAL RECORD COPY Document Name:

PIUSSECY.LT2

..w.

O O

Mr. Ernie H. Kennedy April 30,1993 PIUS Project No. 680 cc: Regis Matzie, Director 9354-0401 Ulf Lindelow, Section Chief Advanced Water Reactor Projects PWR Core Design, Fuel Division ABB Combustion Engineering ABB Atom, ABB Nuclear Power S-721 63 Vasteras 1000 Prospect Hill Road Sweden Windsor, Connecticut 06095-0500 John F. Carew Mark Crump, Manager 9341-0407 Building 475 B Reactor Engineering Brookhaven National Laboratory ABB Combustion Engineering Upton, New York 11973-5000 Nuclear Power 1000 Prospect Hill Road Gregory J. Van Tuyle Windsor, Connecticut 06095-0500 Building 475 B Brookhaven National Laboratory Chuck Molnar 9377-0407 Upton, New York 11973-5000 Nuclear Systems Licensing ABB Combustion Engineering Johann Lindner, Vice President Nuclear Power Technology and Engineering 1000 Prospect Hill Road ABB Atom, Inc.

Windsor, Connecticut 06095-0500 200 Great Pond Drive Windsor, Connecticut 06095 Lars Nilsson, Technical Manager PIUS Reactor Division ABB Atom AB S-721 63 Vasteras Sweden Harold D. Thornburg ABB Atom, Inc.

901 South Warfield Drive Mt. Airy, Maryland 21771 Daniel F. Giessing, Director i

Office of LWR Safety and Technology Mail Stop NE-42 U.S. Department of Energy Washington, DC 205B5 i

Steve Goldberg, Budget Examiner Office of Management and Budget 725 17th Street, NW Wahingtor., DC 20503 1

I i

j