Ack Receipt of Transmitting Addl Info on Rev to Quality Assurance Program for Station Operation
ML20045H355
Person / Time
Site: Fort Calhoun 
Issue date: 07/09/1993
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Tira Patterson
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 9307200121
Download: ML20045H355 (4)


Text

_ _ - - - - - - _ _ - - _ _ _ _ - - _ - - _ -

UNIT E D ST AT ES je#"IGuq$g f,

NUCLEAR REGULATORY COMMISSION

' (,,[

REGION IV o

?

G11 RY AN PL AZA DRIVE, SUITE 400 gv,f AR LINGTON. TE X AS 76011 8064 El 9 3g3 Docket:

50 285 License: DPR-40 Omaha Public Power District ATTN:

T. L. Patterson, Division Manager Nuclear Operations 444 South 16th Street Hall Mail Stop 8E/EP 4 Omaha, Nebraska 68102-2247

SUBJECT:

10 CFR 50.54 QUAllTY ASSURANCE PROGRAM CHANGE REVIEW l

l

References:

Letter dated May 11, 1993 from W. G. Gates to the U.S.

Nuclear Regulatory Commission transmitting additional information on a revision to the Fort Calhoun Nuclear Power Plant Quality Assurance Program for Station Operation We received your submittal, referenced above, transmitting additional information on a revision to the Quality Assurance Program for Station Operation at Fort Calhoun submitted to the NRC on December 11, 1992.

Based on Region IV staff review of this Quality Assurance Program submittal, an apparent reduction in comitment from the program description previously accepted by the NRC exists. Changes to the Quality Assurance Program that reduce comitments must be submitted to the NRC and receive NRC approval prior to implementation in accordance with 10 CFR 50.54.

Based en our current review schedule, we anticipate that it will require more than 60 days to complete our review.

Upon completion of our review of your Quality Assurance Program, you will be notified of the results.

If you have any questions concerning the above, please contact Howard Bundy at I

(817)860-8172 or les Constable at (817)860-8151.

l Sincerely, a

irector Division of Reactor Safety j

cc:

LeBoeuf, Lamb, Leiby & MacRae ATTN:

Harry H. Voigt, Esq.

1875 Connecticut Avenue, NW l

I

/1 l p387238$ Soh5 l

l T. L. Patterson Washington County Board of Supervisors ATTN: Jack Jensen, Chairman i

Blair, Nebraska 68008 Combustion Engineering, Inc.

ATTN: Charles B. Brinkman, Manager 1

Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Nebraska Department of Health ATTN: Harold Borchert, Director i

Division of Radiological Health 301 Centennial Mall, South

-1 P.O. Box 95007 Lincoln, Nebraska 68509-5007 Fort Calhoun Statior.

ATTN: James W. Chase, Manager P.O. Box 399 Fort Calhoun, Nebraska 68023 T

,n.

n.

+

.=

1 T. L. Patterson bec to DMB - IE43 bec distrib. by RIV:

J. L. Milhoan Resident Inspector DRSS-FIPS MIS System RIV File Section Chief (DRP/TSS)

Lisa Shea, RM/ALF, MS: MNBB 4503 Senior Resident Inspector - Cooper G. Constable H. Bundy k

N RIV:C/)"fi)RS kbO:DRS [

AD[D M k

/ D: b GCon b [cs IBarks[

TGly k [

[CoIlins

/

'7/ f/93

/[A

'(hhN3 k N

/

\\

T. L. Patterson ibec to:DMB1 'IE43

~!

bec distrib. by RIV:

J. L. Milhoan Resident Inspector DRSS-FIPS MIS System RIV File Section Chief (DRP/TSS)

Lisa Shea, RM/ALF, MS: MNBB 4503 Senior Resident Inspector - Cooper G. Constable H. Bundy N

m RIV:C/P$TDRS dbD:DRS [ ADhMk / D:D b GCondd1Ncs IBarhs[

TGly k [

koYlins

/

1/ f/93

/k T/kyh3 \\ Nb3

/

\\

.